Legal Document View

Unlock Advanced Research with PRISMAI

- Know your Kanoon - Doc Gen Hub - Counter Argument - Case Predict AI - Talk with IK Doc - ...
Upgrade to Premium
[Cites 0, Cited by 0] [Section 12] [Entire Act]

Union of India - Subsection

Section 12(3) in The Cochin Harbour Craft Rules, 1947

(3)The fees referred to in sub-rule (2) shall be calculated on the following scale, namely
(i)For every vessel the gross tonnage of which does not exceed 10Tons Rs.75.00
(ii)For every vessel the gross tonnage of which exceeds 10 Tons butdoes not exceed 25 Tons. Rs.100.00
(iii)For every vessel the gross tonnage of which exceeds 25 Tons butdoes not exceed 50 Tons. Rs.125.00
(iv)For every vessel the gross tonnage of which exceeds 50 Tons butdoes not exceed 75 Tons. Rs.150.00
(v)For every vessel the gross tonnage of which exceeds 75 Tons butdoes not exceed 100 Tons. Rs.175.00
(vi)For every vessel the gross tonnage of which exceeds 100 Tons butdoes not exceed 300 Tons. Rs.200.00
(vii)For every vessel the gross tonnage of which exceeds 300 Tons butdolls slot exceed 600 Tons. Rs.250.00
(viii)For every vessel the gross tonnage of which exceeds 600 Tons butdoes not exceed 900 Tons. Rs.300.00
(ix)For every vessel the gross tonnage of which exceeds 900 Tons butdoes not exceed 1,200 Tons. Rs.350.00
(x)For every vessel the gross tonnage of which exceeds Rs. 350.00plus 1,200 Tons. Rs.50.00 for every 300 Tons or part thereof inexceesof 1,200 Tons.
(xi)For interim survey. Rs.20.00 per visit.
Note. - The above fees shall be in addition to the travelling expenses and overtime fees incurred in connection with these surveys.