State of Gujarat - Section

Section 5 in Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing supply and other Miscellaneous Charges) Regulations, 2005

5. Provision for high tension / extra high tension Supply.

- (i) In case of applications where there is a need to erect a new HT line or EHT line from the sub station or extend the existing HT or EHT line or strengthening of existing HT or EHT line in order to extend supply to the applicants, the Distribution Licensee, on its own in case of HT, and in co-ordination with Transmission Licensee in case of EHT, shall prepare an estimate of the cost of aforementioned work including the cost of terminal and metering arrangements at the premises of the consumer, but not including the cost of meter. Such estimate shall be based on the latest cost data as published by the Distribution Licensee and/or Transmission Licensee.
(ii)In case of applications where there is a need to erect a new sub-station for extending supply to the applicant, the Distribution Licensee, on its own or in co-ordination with Transmission Licensee, shall prepare an estimate of the cost of the necessary works in the same way as indicated in sub-clause 4.2 (i) above. In cases of applications when the capacity of existing substation is required to be augmented, the differential cost of existing and new such electrical plant will form the basis of calculation of pro-rata charges. The estimate of the cost of such substation shall be based on the latest cost data as published by the Distribution Licensee and/or the Transmission Licensee.
Chapter - VI