contract or assign his obligations or any benefit or interests in the Contract or any part thereof in any manner whatsoever. Any such assignment shall not absolve the Contractor from his obligations and responsibilities under this Contract.
5.10.2 If the Company is satisfied that the entire Works have been completed as specified in 5.10.1 above and have successfully passed all tests provided in the Contract then the Company shall issue within fourteen working days a Certificate of Completion and Acceptance which certificate shall be effective from the completion date which the Contractor had notified to the Company subject to the Company's Representative certifying that the entire Works were completed by the Contractor without any defect on the said notified completion date except for the Punch List items.
Scope of EPC (LSTK) within RFSU
Preparation of the Process Design Package
Residual Basic Engineering
Detailed Engineering
Management Control of all procurement activities
of all materials
Fabrication, construction, installation, testing etc.
Trial run and Pre-commissioning
Obtaining statutory approvals as far as in
Contractor's scope and required prior to
Commissioning
Project Management and Support services
Carrying out of function tests of individual
equipment
Preparation of start up and operating manuals
Management of HSE including Hazop, DMP etc.
Scope of EPC (LSTK) Contractors after RFSU
Commissioning of the Plant
Performance Test Runs for the Plants
Remaining training activities
Providing as built drawings
Supply of all test report,
Post commissioning services for six months as per
Clause 2.4.11
Working for punch list item,
Working for any warranty obligations
Training of operators within Post Commissioning
Services"