9.7 Inspection of corrosion coating of drilled pipe and repair of defects.
9.8 Optic fibre cable :
9.8.1 Design and detail engineering, 9.8.2 Procurement/manufacture and supply of the optic fibre cable, 9.8.3 Supply of suitable jointing pits at both ends of cable, 9.8.4 Pulling of the fibre optic cable through the conduit, 9.8.5 Testing of the optical fibre cable.
9.9 Restoration and clean-up, etc. 9.10 Preparation of as-built drawings and other records, etc. 9.11 All other works not specifically listed herein, but required as per specifications, drawings, provisions of contract document, calculation and construction method statements leading to successful completion of works."