front portion
of the plot. To meet out the expenses, she sold the back portion of the said
plot to the plaintiff on 15.12.1976, wherein ... including the appellant. The lay out does not indicate any common
passage in the plot No.51. While so, the Courts below have considered
from that
common well were, however, kept joint for the common enjoyment of the
parties. Water from common well situate in plot was not sufficient ... well in survey No.103/2 by
connecting the common channel in the common land in survey No.96/5
by means of a small
acres was plotted out by
Mohammed Mahin Sahib, father of the respondents 8 and 9. Totally, 368
plots in three blocks were plotted ... original lay
out were converted into plots including water body (Malaikannar) and were
plotted into residential plots.
3.It is alleged in the affidavit that
enlarged into the cart track and after plotting out the lands, can it be
used as a common access road (epytpay; ghij ... property plotting out as the house sites, now the subject pathway shown as epytpay;
ghij common pathway in the field maps sketch, necessarily, the access
point out that at the time of selling the plots by the common vendor, the lay out was not approved lay out and admittedly
land in the said survey no.63/3A was held by the common owners and they have divided into parts of 25 to 30 cents ... owner of the pathway along with the other plot owners who have purchased from the common vendor. However after loosing the case before the trial
waste material and other toxic material in the common
pathway of Mariamman Koil Street abutting petitioner plot, in Survey
No.79/3.
For petitioner ... debris and rubbish, waste
material and other toxic material in the common pathway of the
petitioner's house has been removed.
3 Recording
Karunikar Street, Adambakkam,
Chennai-600 088. .. Respondents in both WPs
Common Prayer: Writ Petitions are filed under Article 226 of the
Constitution of India ... both cases)
COMMON ORDER
The petitioners herein who have purchased unapproved plot on
14.07.2000, have made the applications to the 3rd respondent to regularize
along the
periphery of the plot.
(viii)The unit has not provided Solar energy for the
illumination of common areas, lighting for garden and street
COMMON ORDER
Heard the Learned Counsel for the Petitioners and the
Learned Counsel for the Respondents.
2. The Two petitioners are owners of plots situated ... purchased plots
bearing numbers 95 to 100 in the year 2002 and duly registered. Out
of these 6 plots, she sold plot number