filed on record, has not said anything about FOS or about defective design. The first surveyor was also an expert in the field ... being 1.5 is an inherent defect.
24. As per the report of second surveyor, the towers were not designed for any impact load, which
sent the car to OP 2 to check and rectify the defect. He was told that there was no short cut and extra exhilaration ... particularly petrol version manufactured by OP 1, due to some manufacturing/design defect in the engine. Car covered only about 40,000 kms. In almost
Versus National Insurance Co. Ltd. (F.A. No.148/2017)
d) Defective design or workmanship or use of defective
materials.
e) Demolition, construction, structural alterations
bridge was due to failure on
account of inadequate and defective designs and the drawings supplied to
the GNCTD by M/s. Project Consultants
Nano car is totally bad and it is a major defect and design error of
massive proportion. He had asked opponent to order general recall ... cooling system. He contended
that, he discovered major structural design defect in the car on or around
11/07/2016 and he had averted
movement of made up ground
c. coastal or river erosion
d. defective design or workmanship or use of
defective materials
e. demolrion, construction, structural
alterations ... under the policy as per civil Engineer
report it appears the design defect in the
building structure which caused the seepage due
to water pressure
80IA
of the Act if the contracts involves design, development,
operating & maintenance, financial involvement, and defect
correction and liability period, then such contracts cannot ... profit from the contracts
which involves design, development, operating & maintenance,
financial involvement, and defect correction and liability period is
to be computed by assessing
customers refused to pay, materials were short supply, defective materials, so
customers reused to pay and designed discrepancy and short payment, not
pertaining to current
assessee shall, with due care and diligence,
design, execute and complete the work and remedy any defects therein ... superintendence, labour, material, plant, require in for such design,
execution, completion and remedying of any defects. (page 12, para 8.1)
(ii) Material, Plant and workmanship
Finance Act, 2001 . Therefore, if the contracts
involve design, development, operating and maintenance, financial
involvement, and defect correction and liability period, then such
contracts cannot