other professionals involved in the project, not to include anything in the design which would involve the use of dangerous structures or other processes ... shall also be the duty of the professionals, involved in designing the buildings structures or other construction projects, to take into account the safety aspects
other professionals involved in the project, not to include anything in the design which would involve the use of dangerous structures or other processes ... shall be the duty of the professionals involved in designing the building, structures or other construction projects, to take into account the safety aspects associated
Upon the receipt of the petition, the Receiving Officer of the Commission designated for the purpose shall acknowledge the receipt by stamping and endorsing ... defect in the pleadings or in the presentation, without giving an opportunity to the person filing the petition to rectify the defect within the time
shall replace/rectify the defective meter within 30 days of testing. The consumer shall pay the difference due to the defect in the meter ... billing charges, the defective meter shall not be replaced/rectified and the licensee shall approach the designated electrical inspector, who shall test the correctness
shall replace/rectify the defective meter within 30 days of testing. The consumer shall pay the difference due to the defect in the meter ... billing charges, the defective meter shall not be replaced/rectified and the licensee shall approach the designated electrical inspector, who shall test the correctness
good design and construction, sound material and adequate strength to perform the work which it is fused; (ii) free from patent defects
pertaining to Iris duty ; and (f) when asked, give his name and designation without hesitation. 13. Duty for ensuring safety.
(1) Every metro railway employee ... works or overhead electric equipment including power supply installation; or (c) any defective signal; or (d) any unusual circumstances such as fire, smoke, flood, accident
Orissa Panchayat Samiti Accounting Procedure Rules, 2002
ODISHA
India
Orissa Panchayat Samiti Accounting Procedure Rules
The Chhattisgarh Panchayat Nirvachan Niyam, 1995
CHHATTISGARH
India
The Chhattisgarh Panchayat Nirvachan Niyam, 1995
Act
other special meters as prescribed by law. One meter will be designated as main meter and other as check meter. The reading of the main ... Board once in every six months or earlier. In case of any defect in the metering equipment, replacement shall be provided by the Board within