surveys required for collecting data relevant to design and construction of the crossing performing all engineering and design calculations, preparation of all necessary construction drawings ... corrosion coating of drilled pipe and repair of defects.
9.8 Optic fibre cable :
9.8.1 Design and detail engineering,
9.8.2 Procurement/manufacture and supply
abuse of dominant position by the
Govt. of Goa stands substantiated by designing bid documents that contained
several terms and conditions leading to deprivation ... into the whole process of designing and awarding the tender in this case
so that all shortfalls and defects in the procedure are rectified.
FINDINGS
SELLER takes no responsibility for any defects or deficiencies whatever they are, namely as regards design project, drawings, operation instructions and hand-books
infrastructure
facility cumulatively with all the activities
of design, development, engineering,
construction, maintenance, financial
involvement, defect correction and such
other ancillary and incidental work
connected ... infrastructure
facility cumulatively with all the activities
of design, development, engineering,
construction, maintenance, financial
involvement, defect correction and such
other ancillary and incidental work
connected
infrastructure
facility cumulatively with all the activities
of design, development, engineering,
construction, maintenance, financial
involvement, defect correction and such
other ancillary and incidental work
connected ... infrastructure
facility cumulatively with all the activities
of design, development, engineering,
construction, maintenance, financial
involvement, defect correction and such
other ancillary and incidental work
connected
comes out
that if the contracts involves design, development, operating &
maintenance, financial involvement and defect correction and
liability period, then such contracts cannot ... 80IA and profit
from the contracts which involves design, development,
operating & maintenance, financial involvement, and defect
correction and liability period is to be accepted
Finance Act, 2001 . Therefore, if the contracts
involve design, development, operating and maintenance, financial
involvement, and defect correction and liability period, then such
contracts cannot
Limited (DMRC) for design of
rail based mass rapid transport system by procuring the
design, execution and completion and remedying any defects
in the works ... design and construction of a rail based
mass rapid transport system by procuring the design,
execution and completion and remedying any defect in the
works
Areva to re-
design the transformer and supply the redesigned transformer, would
establish that the design of failed transformer was defective.
20. The Appellant ... Areva to re-design the transformer
and supply the redesigned transformer would establish
that the design of failed transformer was defective.
b. The conduct
failure rate and
warranty cost estimates,
Design Reliability: It assists the design team with
the Design Failure Mode and Effects analysis and,
Risk analysis ... departments.
Product Data management (PDM): Product Engineering (PE) and
Core Engineering Design (CE-Design)
PDM: This team supports global PDM team in terms of managing