Search Results Page

Search Results

61 - 70 of 4879 (1.41 seconds)

Kevin Enterprise vs Joint Cit on 12 April, 2000

plant. For different towers of the same plant, the calculations, specifications and design of the products involve a crucial and technically intensive exercise ... down that in case of any defects in the design, materials or workmenship within 48 months from the date of despatch of last consignment
Income Tax Appellate Tribunal - Ahmedabad Cites 36 - Cited by 0 - Full Document

Navayuga Engineering Company Limited, ... vs Acit Circle-1(1), Hyderabad on 11 December, 2023

justified in not appreciating the fact that the eligible projects involve design, development, operation and maintenance and the Appellant is eligible to claim deduction ... executed the works and was responsible for designing, drawing, risk of project, execution of project, maintenance and defect liability, under the facts and circumstances
Income Tax Appellate Tribunal - Hyderabad Cites 68 - Cited by 0 - Full Document

Navayuga Engineering Company Limited, ... vs Acit Circle-1(1), Hyderabad on 11 December, 2023

justified in not appreciating the fact that the eligible projects involve design, development, operation and maintenance and the Appellant is eligible to claim deduction ... executed the works and was responsible for designing, drawing, risk of project, execution of project, maintenance and defect liability, under the facts and circumstances
Income Tax Appellate Tribunal - Hyderabad Cites 68 - Cited by 0 - Full Document

Navayuga Engineering Company Limited, ... vs Acit Circle-1(1), Hyderabad on 11 December, 2023

justified in not appreciating the fact that the eligible projects involve design, development, operation and maintenance and the Appellant is eligible to claim deduction ... executed the works and was responsible for designing, drawing, risk of project, execution of project, maintenance and defect liability, under the facts and circumstances
Income Tax Appellate Tribunal - Hyderabad Cites 68 - Cited by 0 - Full Document

Ddit (It) 2(1), Mumbai vs Siemens Ag, Mumbai on 7 June, 2024

hire and the Contractor agrees to be hired to implement the design, manufacture, supply, install and commission Train Control & Signaling system for Extension ... design and construction of a rail based mass rapid transport system by procuring the design, execution and completion, and remedying any defects in the Works
Income Tax Appellate Tribunal - Mumbai Cites 34 - Cited by 0 - Full Document
Previous   3 4 5 6 7   8 9 10 11 12 Next