value of the Aircraft, the
Aircraft would be considered as a Constructive Total Loss and
in such an event, the defendant would be liable ... Syndicate Bank, though, it was not treated as total loss.
Ofcourse, in case of total loss, insurer has to pay the entire
amount
said car vide claim No.0820504390A, which was
settled as Constructive Total Loss as per terms and
conditions of policy since gross repair amount
exceeded ... contended that the said
Audi Car was declared to be a constructive total
loss and purchased by Mr.Sameer in November 2017 and
thereafter Pepsico
suffered loss to the
extent of Rs.13,000/- per month totally Rs.3,12,000/-
Therefore, the defendant claimed the total claim ... portion in the newly constructed building.
Therefore, the defendant suffered loss to an extent of
Rs.13,000/- p.m. totally amounting
their
wishes the first plaintiff constructed residential unit
consisting of 2 rooms, a hall, kitchen and bath room, totally
7 O.S.No.742/2009 ... their
wishes the first plaintiff constructed residential unit
consisting of 2 rooms, a hall, kitchen and bath room, totally
measuring 5.3 squares in the year
that includes vacant area as well as
constructed area along with compensation regarding the loss
of building, loss of rent due to demolition of part ... total area 39.169 Square Meter constructed
portion has been demolished and the said portion had been
reconstructed. Ex.P.12 estimation nowhere disclose the total
loss caused to the plaintiffs at the rate of
Rs.3,500/- per month from 18.12.1995. The plaintiffs
quantify the total loss that they have ... towards loss in a total sum of Rs.5,58,000/-. The 1st
defendant has not whispered anything about its liability
to pay the rentals
ground and first floor premises before going further
constructions and somehow plaintiff managed and
constructed the ground floor moulding, first floor moulding
without getting ... plaintiff thereby plaintiff has undergone severe financial loss
in construction even though he has constructed up to the
second floor of the building
Cbi P S vs Tholasirama on 30 December, 2024
KABC010298292017
IN THE COURT OF THE
constructed the residential house on the site measuring
to the extent of 2200 Sq ft, i.e., on the existed building the
Developer has constructed ... which is evident from Ex.P.47 to
construct the building and therefore the total cost
incurred by AGO is Rs.50,000/- refund deposit
Submitted The Bid vs The Plaintiff Was Prevented From ... on 11 June, 2021
1
Com