Rewa district situate in the State of Madhya Pradesh after
procuring fly-ash from the thermal power stations in the State of Uttar
Pradesh ... Cement in the
districts of State of Uttar Pradesh.
4. The fly-ash is produced from coal combustion and normally
dispersed into the atmosphere which
fly ash and/
or bottom ash. Needless to notice that mere dumping of
this quantity of ash would be most improper as fly ash
with ... ash, bottom ash, pond ash)
December
02, 2016
with soil on weight to weight basis. The Notification also
specified the minimum percentage of fly ash
cement" to be used, the contractor was using 'fly ash'. Petitioner learnt that not only was an item of contract being substituted ... fly ash was being procured free of cost by the contractor. Petitioner alleges that vide letter dated 11.1.1999, in his capacity as Director (Electrical/Civil
industrial effluents have been drained in
the Rihand Reservoir. The Fly the Fly Ash has also been
drained by some of the Thermal Power Plants ... Ash Pond till disposed in total Ash total total total
31.03.2019 Ash Pond till of plants Ash Ash of Ash
(MMT) 31.03.2019 (multiple Slurry plants
which is a Coal Based Thermal Power
Station. For disposal of fly ash, soil is excavated from
nonforest areas and it is transported ... country.
Group(E) This group consists of petitioners dealing
23
in fly ash, clinkers and gypsum. Petitioners claim to
obtain the aforesaid material by manufacturing
project, Ms/ CES, brought out a
proposal during discussions of using fly ash blended with sand in suitable
proportion as fill material for sub grade ... respondent had disputed and stated that the proposal to use fly ash with sand was
made by the appellant herein. In any case, on October
fly ash by manipulation of statistics by
adding ash used for Dykes and Bund formation to the actual consumption of
fly ash. Thermal Power Plants ... earlier, legacy fly ash is 1670.602 Million Tonnes as on
31.12.2021 and data of ash generation and utilization of
legacy fly ash is as follows
taken into consideration of determining the percentage of the fly ash used in the product. The percentage of the fly ash consumed during the aforesaid ... rightly entered in RG.I register and if the percentage of fly ash, which has gone in in the manufacture of finished product, is assessed
Bill of Quantities (BOQ)
"Construction of embankment with fly-ash obtained from coal
or lignite burning thermal power station as waste material,
spread ... pass. The BOQ contemplated construction of the said
embankment using fly-ash. Contending that the quantity of fly-ash
stipulated in the contract was insufficient
aforesaid suit for a declaration that the contract of lifting fly-ash alleged to be entered into between the parties was in operation ... Gujarat Electricity Board, from disturbing the plaintiffs while lifting the fly-ash from Gandhinagar Power Station belonging to the defendant Electricity Board. Along with