outgoing power export to GRIDCO and further
on open access. In this letter, NBFAL referred to the grid code,
clause 5.5.1 and 5.5.4. NBFAL contended ... that
of bulk consumers while importing power. Hence, as per the grid
code, NBFAL submitted, for export of power from NBFAL meter
reading
M/S. Jaiprakash Power Ventures Limited vs Haryana Electricity Regulatory ... on 20 July, 2012
JUDGMENT
principle of net off of the import-
export of auxiliary consumption power to have harmonious
regulatory regime in the country encouraging renewable
projects ... expected to charge same tariff for export of power by
solar projects and import of power must be netted off against the energy
supplied
2009-14 and the benefit of
deemed export was limited to advance authorization as
opposed to deemed export duty drawback and exemption
from terminal excise ... amended and Paragraph 8.7 introduced in
terms of which deemed export benefit was withdrawn for all
non-Mega power projects and on 5.6.2012 the Annual
Talwandi Sabo Power Limited vs Punjab State Electricity Regulatory ... on 4 July, 2017
Apl-32.15
affect the system of the respondents
and in compliance with the Grid Code and Grid Standards.
10.4) That the interconnection facility from the appellants generating ... licensee is the dedicated transmission line. The
metering for export/import is at the sub-station ends.
10.5) That the dedicated transmission line is actually
Appeal no. 166 of 2010
export of power is being done at 132 kV Raigarh substation,
but metering for import of power (startup power ... generator, is governed only by the provisions of Grid Code
and not by supply Code.
35 Though, at this stage, we are of the view
Appeal no. 166 of 2010
export of power is being done at 132 kV Raigarh substation,
but metering for import of power (startup power ... generator, is governed only by the provisions of Grid Code
and not by supply Code.
35 Though, at this stage, we are of the view
Prakashgad, Bandra (East), Mumbai-51.
Versus
1. M/s. Eurotex Industries & Exports Ltd.
2. Maharashtra Electricity Regulatory Commission ..... Respondents
Counsel for the Appellants ... civil court under the Code of Civil Procedure , 1908 for reviewing its own
decision. The Order 47 Rule 1, of CPC allows review
ISGS outside the region or the long term
agreement between the importing and exporting utility;
...
(xii) 'Inter-State Generating Station' or 'ISGS ... meaning as assigned in the Indian Electricity Grid Code
approved/notified by the Commission;
(xiii) 'Long-Term Transmission Customer' means a person
availing