Sharing of inter-State Transmission Charges and Losses) Regulations, 2010, as amended from time to time; (a) Fees and charges paid by the generating companies ... transmission licensee) under the Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2009, as amended from
Period for Giving Supply.
- New Connection (including Temporary Connection)/Additional Load/Reduction of Load 4.1 The Distribution Licensee shall, on an application made by post ... billing cycle on receipt of application and payment of necessary charges. Reduction in Load 4.14 Upon receipt of a request by a consumer for reduction
plus other Incidental charges (Net UI charges, additional UI) or any other intra-State ABT settlement charges as identified under the intra-State ABT mechanism ... charges identified as the SMP plus other Incidental charges (Net UI charges, additional UI) or any other intra-State ABT settlement charges as identified under
Period for Giving Supply.
- New Connection (including Temporary Connection)/Additional Load/Reduction of Load 4.1 The Distribution Licensee shall, on an application made by post ... billing cycle on receipt of application and payment of necessary charges. Reduction in Load 4.14 Upon receipt of a request by a consumer for reduction
Access (i) Collection and disbursement of transmission charges for use of CTU and STU systems and operating charges payable to RLDCs and SLDCs towards short ... term Open Access (i) Billing, collection and disbursement of charges payable to RLDC including Unified Load Despatch and Communication Scheme shall be in accordance with
Open Access Customer having a load of 5 MW or above, the methodology for payment for the reactive energy charges by Open Access consumers shall ... respect of Open Access consumers of load less than 5 MW, reactive energy charges shall be calculated on Power Factor basis as specified
grid discipline. 9. Accounting of Charges for Deviation.
(1) A statement of Charges for Deviations including Additional Charges for Deviation levied under these regulations shall ... Sunday mid-night. (2) All payments on account of Charges for Deviation including Additional Charges for Deviation levied under these regulations and interest
Payment of Charges for Deviation under Regulation 5 and the Additional Charges for Deviation under Clauses (3), (4) and (10) of this regulation, shall ... 2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).] ] (12) The charges for over-drawal/ under-injection and under-drawal/over-injection of electricity shall
Scheduled entitlement from Open Access for the consumer shall be load equivalent to 4 MW. Provided that the variation between the actual drawal ... State Load Despatch Centre and the Distribution Licensee : Provided further that the Commission may allow extension of the period for testing including full load test
done electronically on computer/Internet. (xv) "Labour" means, a person engaged in loading, unloading, filling, stitching, emptying, carrying, cleaning, drying, grading, storing,stacking,bagging,stamping ... this Act. (xxii) "Market charges" includes on account of or in respect of commission, brokerage, weighing, measuring, loading, unloading, or carrying, cleaning, drying, sieving, stitching