Deputy Commissioner, MCD informing about the damage caused to the
rain/ storm water drain due to the construction being carried out at M-35,
Marg ... Delhi - 110030. It was also informed that the choking
of the rain/ storm water drains by the construction material. In this regard,
kindly provide
2011
Information sought :
1. Please provide following details of de-silting of storm water drains (3-4 feet wide drains) work taken ... work?
2. Provide above details (a) to (f) of de-silting of storm water drains (3-4 feet wide drains) work taken
three students due to flashflood
caused because of choked sewer line / storm water drainage system. Needless to
say that it is the primary responsibility ... detected.
All encroachments above drains / footpaths shall be removed.
The storm water drains shall be fully desilted and choking at any point shall
three students due to flashflood
caused because of choked sewer line / storm water drainage system. Needless to
say that it is the primary responsibility ... detected.
All encroachments above drains / footpaths shall be removed.
The storm water drains shall be fully desilted and choking at any point shall
three students due to flashflood
caused because of choked sewer line / storm water drainage system. Needless to
say that it is the primary responsibility ... detected.
All encroachments above drains / footpaths shall be removed.
The storm water drains shall be fully desilted and choking at any point shall
three students due to flashflood
caused because of choked sewer line / storm water drainage system. Needless to
say that it is the primary responsibility ... detected.
All encroachments above drains / footpaths shall be removed.
The storm water drains shall be fully desilted and choking at any point shall
three students due to flashflood
caused because of choked sewer line / storm water drainage system. Needless to
say that it is the primary responsibility ... 2024/119596
CIC/MCDND/A/2024/119597 Page 7 of 10
The storm water drains shall be fully desilted and choking at any point shall
three students due to flashflood caused
because of choked sewer line / storm water drainage system. Needless to say that it
is the primary responsibility ... encroachments above drains / footpaths shall be removed.
Page 3 of 13
The storm water drains shall be fully desilted and choking at any point shall
three students due to flashflood
caused because of choked sewer line / storm water drainage system. Needless to
say that it is the primary responsibility ... 2024/119596
CIC/MCDND/A/2024/119597 Page 7 of 10
The storm water drains shall be fully desilted and choking at any point shall
three students due to flashflood
caused because of choked sewer line / storm water drainage system. Needless to
say that it is the primary responsibility ... 2024/119596
CIC/MCDND/A/2024/119597 Page 7 of 10
The storm water drains shall be fully desilted and choking at any point shall