Section 4(5)(a) in The National Electricity Policy, 2005
(a)Rural Electrification Distribution Backbone (REDB) with at least one 33/11 kv (or 66/11 kv) sub-station in every Block and more if required as per load, networked and connected appropriately to the State transmission system.