Union of India - Section

Section 17 in Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019

17. Metering Arrangements.

(1)Interface Meters (Main Meter, Check Meter and Standby Meter) shall be installed at both the ends of the Cross Border Transmission Link in accordance with Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 and amendments thereof.
(2)Before flow of electricity on the Cross Border Transmission Link, Transmission Planning Agencies of both the countries shall confirm the availability of Main Meter, Check Meter and Standby Meter to System Operator of respective country.
(3)Interface Meters as specified in Clause (1) above, shall be open for inspection by any person authorized by the Transmission Planning Agencies or System Operators of the respective countries.