Section 148(9) in The Coal Mines Regulations, 2011
(9)In every travelling roadway, and in every airway other than those specified in sub-regulation(2), samples shall be taken in such a systematic manner and at such intervals not exceeding three months, to maintain proper check on the efficiency of the treatment thereof in terms of regulation 146(2).