Section 4(1)(iii) in Orissa Electricity Regulatory Commission (Determination of Open Access Charges) Regulations, 2006
(iii)This full cost shall be calculated for the relevant voltage level considering the actual energy wheeled/transmitted in the system. The per unit cost of transmission and wheeling shall be determined using the postage stamp method taking into consideration the quantum of energy handled in the appropriate system.