Section 210(3) in The Coal Mines Regulations, 2017
(3)Before an air-receiver is cased in or put in commission, the engineer or other competent person shall subject it to a hydraulic test at a pressure at least one-and-a-half times the maximum permissible working pressure and a similar such test shall be made after every renewal or repair and in any case at intervals of not more than three years.