State of Rajasthan - Subsection

Section 26(8) in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2016

(8)If the actual drawal in a block is higher than the admissible drawal, then the percentage excess drawal shall be calculated on the admissible drawal and the highest percentage of such excess drawal of all blocks during a month shall be considered as excess capacity (demand) utilized during that month and shall be billed as per regulation 21(v).