(7)The filled-up trenches after being covered with loose earth shall be left undisturbed for about a month till they sink to a depth-of a foot or more below ground level in which case further layers of nightsoil and kachra shall be added on the top of the above trenched till the load rises to a foot above ground level and then the trenches shall be left to themselves to mature.