Section 134(d) in The Building And Other Construction Workers '(Regulation Of Employment And Conditions Of Service) Central Rules, 1998
(d)such casing and bracing are provided to a shaft at an excavation or tunnelling work up to the depth of such shaft at an excavation or tunnelling work according to the appropriate design for such casing and bracing;