Section 33 in The Maharashtra Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2005
33. Norms for operation.
- 33.1 Thermal generating stations33.1.1Availability(a)Target availability for full recovery of annual fixed charges shall be 80 per cent(c)Target Plant Load Factor for incentive in accordance with Regulation 37 shall be 80 per cent33.1.2Auxiliary Energy Consumption(a)Coal-based generating stations| With cooling tower | Without cooling tower | ||
| (i) | 200 MW series | 9.0% | 8.5% |
| (ii) | 500 MW series | ||
| Steam driven boiler feed pumps | 7.5% | 7.0% | |
| Electrically driven boiler feed pumps | 9.0% | 8.5% |
| (i) | Combined cycle : | 3.0% |
| (ii) | Open cycle : | 1.0% |
| 200/210/250 MW sets | 500 MW and above sets | |
| During stabilization period | 2600 kCal/kWh | 2550 kCal/kWh |
| Subsequent period | 2500 kCal/kWh | 2450 kCal/kWh |
| Advanced Class Machines | E/EA/EC/E2 Class Machinesd | |
| Open cycle | 2685 kCal/kWh | 2830 kCal/kWh |
| Combined cycle | 1850 kCal/kWh | 1950 kCal/kWh |
| Advanced Class Machines | E/EA/EC/E2 Class Machinesd | |
| Open cycle | 3125 kCal/kWh | 1.02 x 3125 kCal/kWh |
| Combined cycle | 2030 kCal/kWh | 1.02 x 2030 kCal/kWh |
| During stabilization period | Subsequent period |
| 4.5 ml/kWh | 2.0 ml/kWh |
| During stabilization period | Subsequent period |
| 5.0 ml/kWh | 2.5 ml/kWh |
| (a) Coal-based and lignite-fired generating stations | - 180 days |
| (b) Gas turbine/combined cycle generating stations | - 90 days |
| (i) Pit head generating stations | - 0.3% |
| (ii) Non-pit head generating stations | - 0.8% |
| (i) Purely Run-of-river power stations | - 85% |
| (ii) Storage type and Run-of-river power stations with pondage | - 80% |
| (i) Purely Run-of-river power stations | - 90% |
| (ii) Storage type and Run-of-river power stations with pondage | - 85% |