Section 133(11)(c) in The Coal Mines Regulations, 2011
(c)after each round of shots, and at the beginning of every shift, and after every cessation of work in the shaft for a period exceeding two hours, examine the sides of the shaft and remove all loose pieces before persons are allowed to descend.