Section 2(1)(zh) in The Delhi Electricity Supply Code And Performance Standards Regulations, 2007
(zh)"Maximum demand" means the highest load measured in kVA or kW at the point of supply of a consumer during conservative period of 30 minutes or as specified by the Commission, during the month.