Section 12 in Bihar Electricity Regulatory Commission (Levy and Collection of Fees and Charges by SLDC) Regulations, 2006
12. Power to Amend.
- The Commission may, at any time, add, vary, alter, modify or amend any of the provisions of these RegulationsAnnexure-A(For Generating Companies)Format of Application for Registration with SLDC as user of Intra-State Transmission System| Name of the Generating Company | : | |
| Address of the Generating Company | : | |
| Location of the Generation Station | : | |
| Location of Interface with Grid (Enclose a layout of switchyard) | : | |
| Total Installed Capacity | : | |
| COD of the Generating Station | : | |
| Nature of use of Energy | : | Supply to Licensees / Wheeling to 3rd parties / Wheeling forcaptive use |
| Transmission capacity contracted as on (Please enclose detailsof Licensees) | : | |
| For Supply to Licensees | : | |
| For wheeling to 3rd parties | : | |
| For wheeling for captive use | : | |
| Agreement period for supply to licensees | : | |
| Details of communication system installed | : | |
| For communication of data to SLDC | : | |
| Establishment in-charge of control room | : | |
| For communication with SLDC | : | |
| Details of Registration fee paid | : | |
| Any other information useful for assisting Efficient GridOperation | : |
| Name of the Distribution Licensee/Electricity Trader | : |
| Address of the Distribution Licensees/Electricity Trader | : |
| Location of Interface with Grid(Attach a list ofvoltage-wise Grid substations/lines along with details oflocation, capacity, No. of bays, line length, type of line, dateof commissioning etc.) | : |
| Total capacity (max. Demand that can be served) | : |
| Transmission capacity contracted from TransmissionLicensees(enclose list of Transmission Licensees withdetails) | : |
| Capacity contracted to Open Access consumers(Enclose listof consumers with details) | : |
| Details of communication system available for communication ofdata to SLDC(Enclose substation-wise details) | : |
| Designation of the personnel responsible for operation of Gridsubstations(Enclose substation-wise details) | : |
| Details of the registration fee paid | : |
| Any other information useful for assisting efficient GridOperation | : |