Section 8(8) in Jammu and Kashmir State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems based on Net Metering) Regulations, 2015, in short, JKSERC Net Metering Regulations, 2015

8.2The connectivity levels at which the Rooftop PV Solar Power Plants shall be connected with the grid are as specified below :-
S. No. Connected load of Eligible Consumer Connectivity level
1. Up to 5 kW 240 V-single phase
2. Above 5 kW and up to 100 KW 415 V-three phase
3. Above 100 kW HT/EHT level