State Of U.P. & Ors vs Hindustan Aluminium Corpn. Ltd. & Ors on 17 April, 1979

Equivalent citations: 1979 AIR 1459, 1979 SCR (3) 709, AIR 1979 SUPREME COURT 1459, 1979 (2) SCC 229 (1979) 3 SCR 703 (SC), (1979) 3 SCR 703 (SC), (1979) 3 SCR 703 (SC) 1979 (2) SCC 229, 1979 (2) SCC 229

Author: P.N. Shingal

Bench: P.N. Shingal, D.A. Desai

           PETITIONER:
STATE OF U.P. & ORS.

	Vs.

RESPONDENT:
HINDUSTAN ALUMINIUM CORPN. LTD. & ORS.

DATE OF JUDGMENT17/04/1979

BENCH:
SHINGAL, P.N.
BENCH:
SHINGAL, P.N.
DESAI, D.A.

CITATION:
 1979 AIR 1459		  1979 SCR  (3) 709
 1979 SCC  (3) 229
 CITATOR INFO :
 R	    1981 SC 711	 (10)
 RF	    1988 SC1737	 (30)
 R	    1989 SC 788	 (32)


ACT:
     Electricity Act  (9 of  1910), s.	2(h)  &	 Electricity
(Supply) Act  1948 (64	of 1948)  S. 2(b)-State	 Electricity
Board if a licensee.
     Electricity Act  1910 (9 of 1910), S. 22-B (as inserted
in 1959)-Scope	and object of-Order under section-Factors to
be taken  into consideration & Electricity (Supply) Act 1948
(54 of 1948), S. 26 Proviso 2-Scope of.
     U.P. Electricity  (Regulation of  Supply, Distribution,
Consumption and	 Use) Order  1977-  Cl.	 6(a)  (i)  Proviso-
Validity of.
     Words    &	    Phrases-'Regulation',     'restriction',
'prohibition'-Distinction between.



HEADNOTE:
     At the  time of granting licence to the company for the
establishment of  a new	 Aluminium factory the Government of
India obtained the consent of the Government of U.P. To make
available to  the company in bulk cheap electricity from the
Rihand Hydro-Electric  Scheme. An agreement was entered into
between the  Company and  the State  Government for the bulk
supply	of   electricity   on	a   firm,   continuous	 and
uninterrupted basis  at 1.99 odd paise per unit for a period
of 25 years.
     The company set up and commissioned its aluminium plant
at Renukoot in April, 1962. It was granted a further licence
for the	 expansion of  its installed  capacity. As the State
was unable to meet the extra requirement of energy, sanction
under s.  28 of	 the Electricity Act 1910 was granted to the
Company, at  its request,  on November 12, 1964, to set up a
generating station  at Renusagar,  near Renukoot.  It set up
two generating units of 67.5 mw each. The first unit started
generating power in 1967 and the other in 1968.
     In the meantime, permission was granted to increase the
Company's installed  capacity from  40,000 metric  tonnes to
60,000 metric  tonnes. The  Company thought  of setting up a
plant  for   the  production  of  60,000  metric  tonnes  of
aluminium in  the State	 of Gujarat.  But the  Government of
U.P. entered  into negotiations	 with the Company and in its
letter dated  November 20,  1968, it stated that there could
be no  difficulty in  meeting the  interim  requirements  of
energy for  2 to  3 years  from the  U.P. State	 Electricity
Board and  also for  arranging for parallel running of their
new power  stations. The  Company was  granted	sanction  to
expand the  Renu Sagar	Generation  by	250  mw,  and  after
negotiations with  the State  Government it  was agreed that
the U.P.S.E.B.	would meet  the additional  energy  under  a
phased programme.  The U.P.S.E.B. stated in its letter dated
September  2,	1972,  that  the  supply  would	 be  without
prejudice to  the power	 of the	 State Government to control
the
710
distribution and  consumption of  energy under s. 22B of the
Act. The  additional energy  was not  made available  to the
Company during	1972-75 although  the rate was substantially
increased with retrospective effect.
     An agreement  was	however	 entered  into	between	 the
Company	 and   the  U.P.S.E.B.	on  November  30,  1976,  in
supersession  of   the	earlier	  agreements,  and   it	 was
stipulated that	 it would  be  read  and  construed  in	 all
respects  in   conformity  with	  the  provisions   of	 the
Electricity  (Supply)  Act,  1948  and	its  rules  and	 the
regulations and the amendments thereto.
     The State	Government took	 a decision in December 1976
to reconnect  some agricultural	 pumping sets which had been
disconnected and  this placed an additional load on the grid
system of the State. On the note of the UPSEB that there was
acute  shortage	 of  energy,  and  its	suggestion  for	 the
imposition  of	 some  restrictions,  the  U.P.	 Electricity
(Regulation of Distribution and Consumption) order 1977, was
issued by the Government on April 7, 1977. Under cl. 6(a)(i)
of the	Order, the  Company could  draw energy	only to	 the
extent of 50 per cent of its monthly consumption.
     As	 the  shortage	of  energy  became  more  acute	 the
Secretary of  the  Power  Department  sent  a  note  to	 the
Governor dated	May 3,	1977 stating  that there was a large
gap between  demand and	 availability  of  energy  and	that
overriding  public   interest,	particularly   the  need  to
maintain food  supply, required	 that units which were heavy
consumers of  energy should  be subjected  to further cut in
the consumption	 of energy.  It was particularly pointed out
that  as   the	Company	 was  itself  generating  energy  at
Renusagar, it will have more than 50 per cent of energy even
if the Board's supply was completely withdrawn. The Governor
approved that  proposal on  June  1,  1977.  A	proviso	 was
inserted in cl. 6(a) (i) of the U.P. Electricity (Regulation
of Distribution and Consumption) Order, 1977 in June 2, 1977
according to  which an	industrial consumer  having its	 own
source of generation of energy from which it obtained 50 per
cent or	 more of  its consumption  would suffer a cut of 100
per cent  in the  energy supplied  by the UPSEB. The company
was given time to bring about the total cut.
     Fresh elections  were held	 to  the  State	 Legislature
Assembly, and the new Cabinet was sworn in on June 23, 1977.
It decided  to reduce the supply of energy to the company to
zero, in  pursuance of	the amendment dated June 2, 1977 and
called for  a fresh  note  on  the  position  regarding	 the
generation and	distribution of	 energy. The Chairman of the
UPSEB prepared	a note	on August  26,	1977,  in  which  he
pointed out  the shortage  of energy,  including substantial
fall in	 the  generation  of  thermal  energy,	and  in	 the
"import" of  energy. The  State Government  made an order on
September 19,  1977 called  the U.P. Electricity (Regulation
of Supply Distribution, Consumption and Use) Order, 1977.
     That order	 was made  for maintaining  the	 supply	 and
securing equitable distribution of electrical energy, and to
provide for regulating the supply, distribution, consumption
and use	 thereof. Clause  6 of	the order which provided for
compulsory cut in consumption of energy and demand, affected
the company.
711
     The clause provided as follows:
     "6(a)(i): In  respect of  electrical energy consumed by
all large  and heavy  power industrial	consumers  receiving
power at  33 kv.  and above  excepting fertilizers, from the
U.P.S.E.B. a cut of 50 per cent in their monthly consumption
of electricity both in respect of energy and demand shall be
exercised:
     Provided that  where any  such industrial	consumer has
his own	 source of  generation of energy which alone enables
him to	obtain 50 per cent or more of his total consumption,
then a	cut of	100 per	 cent in  the energy supplied by the
UPSEB shall be exercised."
     Being aggrieved  by the  compulsory cut  imposed by the
Government the company filed its third writ petition against
the  order.   The  company's  earlier  writ  petitions	were
dismissed as withdrawn.
     The High Court took the view:-
     (a) that  it was  the statutory obligation of the UPSEB
to supply  electrical energy to a consumer and held that the
Pipri Bus Bar was a "distributing Main" under s.2(o) and was
an electricity	supply line as defined in s.2(f) of the Act;
(b) s.	22B of	the Act	 did not  confer power	on the State
Governments  to	  cut  off  supply  of	energy	to  existing
consumers or to issue an order that certain preferences will
be followed  in supplying  energy, (c)	though	the  company
deserved the  writ, it	could not  be said  that  UPSEB	 had
deliberately under  utilised its  generation  capacity,	 and
held the  first proviso to Clause 6(a)(i) of the order ultra
vires,	quashed	  it  and   directed  the  UPSEB  to  supply
electrical energy  to the  company in  accordance with	law,
without taking	into consideration,  the provisions  of	 the
said proviso.
     Appeals were  filed in  this Court by the State and the
Company, the  State being  aggrieved because  the High Court
had interfered	with the  U.P.	Electricity  (Regulation  of
Supply, Distribution, Consumption and Use) Order, 1977 dated
September 19,  1977 made  under s.  22B of  the	 Electricity
Supply Act,  1910 and  the Company  felt  aggrieved  on	 the
ground that  the High  Court had not granted all the reliefs
which it  had claimed  in its petition under Art. 226 of the
Constitution.
     In the appeals it was contended:
     (a) Only  the energy  which was  generated by the Board
could be  the subject-matter of an order under s. 22B of the
Act and	 it was	 not permissible  for the State to take into
account the energy generated by the Company for its own use.
     (b) Sub-s.	 (1) of	 s. 22B of the Act was confined to a
licensee and  would not be applicable to the energy supplied
by a sanction-holder under s. 28.
     (c) The  only permissible	preference  was	 that  under
s.22A in  favour of an establishment mentioned in it and the
preference shown to individual consumers was illegal.
     (d) The  validity of  the Order,  which was  by way  of
subordinate legislation,  was open to judicial scrutiny; the
subjective satisfaction of the State Government in making it
was open  to challenge in a court of law, the order suffered
from the  vice of  malice in  law; it  had been	 made in the
colourable exercise of
712
the power  under s.  22B of  the Act  simply to	 compel	 the
company to  agree to  the payment  of a	 higher rate for the
supply of  energy to  it. While	 making the  order the State
Government failed  to take into consideration the facts that
the production	of aluminium  was of considerable importance
to the	national economy  and that  the Board was capable of
generating more	 energy but  was not  doing so. The issue of
the Order  was really  a colourable  exercise of  the  State
Government's power  under s.  22B of  the Act  as power	 was
supplied indiscriminately  to new consumers after imposing a
cut on the Company's consumption of energy.
     (e) The  Board had	 deliberately  reduced	its  thermal
generation.
^
     HELD: 1.  The High	 Court erred in taking the view that
the Pipri Bus Bar, which was composed of a set of conductors
which were  made up of thick aluminium core steel reinforced
cables, was  a 'distributing  main' under s. 2(e) of the Act
and was	 an electric  supply line  as defined in s. 2(f) and
that cl.  VI of	 the Schedule  to the  Act  would  be  fully
applicable to  the Board  in so far as its obligation to the
Company was  concerned. In  view of the second proviso of s.
26 of  the Act	of 1948,  the provisions  of cl.  VI of	 the
Schedule to the Act could apply to the U.P.S.E.B. in respect
of that	 area only where distribution mains had been laid by
the Board  and the  supply of energy through any of them had
commenced. [724B-F]
     The High  Court, therefore,  erred in  taking the	view
that the  Board was  bound by  the term	 of cl.	 VI  of	 the
Schedule to  the Act  to supply energy to the Company within
one month  of the  making of  a requisition  or within	such
longer period  as the  Electrical Inspector might allow. But
even if	 the Board  was under an obligation to supply energy
to every  person, the  fact nevertheless  remained that	 the
State Government  had the  over-riding power  to provide, by
order made  under s.  22B of  the Act,	for  regulating	 the
supply, distribution, consumption or use thereof. Sub-s. (2)
of that section categorically states that, without prejudice
to the	generality of  the power under sub-s. (1), the order
may direct  the Board  not  to	comply	with  any  contract,
agreement or requisition for the supply of energy. [725B-D]
     2. Sub-s.	(1) of	s. 28  of the Act in terms refers to
and deals  with, engaging by a non-licensee, in the business
of supplying  energy to	 the "public".	It  was,  therefore,
futile to  contend that	 what was generated by the Renusagar
Power Company  was not	meant for  supply to the public, but
was the	 Company's own	energy. It  is true  that generation
became, in  the circumstances,	the "captive" generation for
the use	 of the	 Company, but that was far from saying that,
in the eye of law, it was not energy meant for supply to the
public or  that it was not amenable to control under s. 22B.
It was therefore also liable to equitable distribution by an
order under s. 22B of the Act. [725G-726A]
     3. The  expression "energy" had been defined by cl. (g)
of s.  2 of  the Act  to mean  electrical energy, generated,
transmitted or	supplied for  any purpose  or used  for	 any
purpose	 except	 the  transmission  of	a  message.  It	 was
therefore a pervading definition and there was no reason why
energy generated  and supplied under s. 28 of the Act should
not fall within its sweep. [726B-C]
     4. Though	the use	 of the	 article "the" in sub-s. (2)
was not	 quite appropriate,  there was	no justification for
the  argument  that  section  22B  was	applicable  only  to
licensees and not to a sanction holder under s. 28. [727C]
713
     5.	 What  s.  22B	of  the	 Act  authorised  the  State
Government to  do,  was	 to  make  an  order  providing	 for
'regulating" the supply, distribution, consumption or use of
energy. [727D]
     6. A distinction between 'regulation' and 'restriction'
or  'prohibition'   had	 always	  been	drawn.	'Regulation'
promotes the freedom or the facility which is required to be
regulated  in	the  interest	of  all	 concerned,  whereas
'prohibition' obstructs	 or shuts off, or denies it to those
to whom it is applied. The High Court went wrong in thinking
that the  order had  the effect of prohibiting the supply of
energy to  the Company,	 which was  an 'exciting  consumer'.
[727G-728C]
     Municipal Corporation  of the City of Toronto v. Virgo,
1896 AC 88; Attorney General for Ontario v. Attorney-General
for the Dominion and the Distillers and Brewers' Association
of Ontario,  1896  AC  348;  Birmingham	 and  Midland  Motor
Omnibus Co.  Ltd. v. Worcestershire County Council, [1967] 1
WLR 409.  Tarr v.  Tarr. [1972]	 2 WLR	1068; The Automobile
Transport (Rajasthan) Ltd. v. The State of Rajasthan & Ors.,
[1963] 1 SCR 491; State of Mysore v. H. Sanjeeviah, [1967] 2
SCR 361; Fatehchand Himmatlal & Ors. v. State of Maharashtra
etc. [1977] 2 SCR 828 at p. 851.
     7. What  had been	ordered was no more than a cut of 50
per cent in the monthly consumption of electricity and not a
total prohibition  of consumption of energy. That was a step
in the	direction of  regulating the  consumption of energy,
and not	 a total  prohibition as envisaged in the proviso to
cl. 6(a) (i) of the Order. [728E]
     8. The  proviso operates  in a  special  or  particular
field and  for a  particular purpose where it was considered
necessary for  regulating the  supply etc., of the energy in
the interest  of the other consumers, for s. 22B was mean to
maintain the supply and secure the equitable distribution of
energy to  all concerned.  The High  Court did	not properly
appreciate that aspect of the matter. [728F]
     9. Large and heavy industrial consumers of the category
in cl.	6(a)(i) are  a class  by themselves and it is hardly
permissible for	 them to  complain that the small preference
shown to  agriculturists in supplying energy for their water
pumps or  tube-wells, or  in  energising  State	 tube-wells,
supplying water	 to them,  or the  supply of energy to small
scale industries  had really  created a	 privileged class of
consumers or  brought into  existence any  such	 concept  of
priorities as  to run  counter to or defeat the objective of
bringing about	the equitable  distribution of	energy by an
order under s. 22B. The High Court had no real justification
for recording  an adverse  finding against  the State on the
question of the so-called preference or priorities. [729G-H,
730B]
     10. There was no doubt that the State Government formed
its opinion about the necessity and expediency of making the
Order for the purpose of maintaining the supply and securing
the equitable distribution of energy at a time when that was
called for and this Court cannot sit as a Court of appeal to
examine any  and every	argument in  an attempt to show that
the opinion  of the  State Government  was vitiated  for one
fanciful reason or the other. [731 G-H]
     11.  Although   the  U.P.	Electricity  (Regulation  of
Supply, Distribution,  Consumption and Use) Order, 1977, had
been made on the ground that the State Government was of the
opinion that it was necessary and expedient for main-
714
taining the  supply and	 securing the equitable distribution
of electrical  energy, to provide for regulating the supply,
distribution, consumption  and use  thereof, it did not deal
with all  those matters	 in detail.  In fact  it may well be
said to	 be an	order relating essentially to compulsory cut
in the	consumption of	energy. But that cannot detract from
the basic  fact that the order had the sanction of s. 22B of
the Act	 and subserved	the main  purpose thereof. Therefore
its validity  was not  open  to	 challenge  as	a  piece  of
subordinate legislation. [732G-733B]
     12. Malice	 in law is another aspect of the doctrine of
ultra vires.  An offending  Act can be condemned simply, for
the reason that it is unauthorised. Bad faith has often been
treated as  interchangeable with unreasonableness and taking
a decision  on extraneous  considerations. In that sense, it
is not	really a  distinct ground  of invalidity. It is well
settled that if a discretionary power has been exercised for
an 'unauthorised  purpose' that	 is  enough  to	 invite	 the
Court's review. [733-D]
     Roncarelli v.  Duplessis, [1959] SCR 121 p. 141 (Canada
Law Reports); referred to.
     In the  instant case,  the Company had not been able to
establish malice  in law,  merely because  of what the Chief
Secretary said in his press statement dated July 8, 1977, or
what the Minister informed the Assemble. It may well be that
the new	 State Government  was	dissatisfied  with  the	 new
agreement which had been entered into at the instance of the
political party which was then in power, but it could not be
said  that  the	 new  Minister's  desire  to  examining	 the
validity or  propriety of  that agreement  arose out  of any
extraneous or  improper consideration  so as  to  amount  to
malice in law. [734H-735A]
     13. Although  the High  Court arrived at the conclusion
that the  company deserved the writ which it granted, it did
not  find   it	possible   to  hold   that  the	 UPSEB,	 had
deliberately under  utilised its  generation capacity.	That
was a  finding of  fact which did not call for interference.
[736E]
     14. As  long as  the dominant  motive  was	 proper	 and
reasonable, and was not sullied by a mere pretext, the Order
based on  it would  be valid when it was well within the due
scope and  policy of  the Act  and was	an honest attempt to
deal with  the situation  for which  the power	to make	 the
order had  been granted	 by  the  Act.	There  was  thus  no
justification for  the argument that there was malice in law
on the	part of	 the State  Government in  making the order.
[736G, F]
     15. That  distribution can	 be said  to be	 "equitable"
which is  "just and right under all the circumstances of the
particular case". The High Court had recorded a finding that
there was  shortage in	the generation	of energy  when	 the
order was  made. The fact remains that the demand for energy
was far	 in excess  of the supply from all sources available
to the	UPSEB. It  had also  been well	established  that  a
situation had  arisen when  it became necessary to obtain an
order from  the State  Government about the course of action
to be  adopted	by  the	 Board.	 Self-contained	 notes	were
therefore drawn	 up in March, 1977 and on May 24, 1977. June
28, 1977  and August 26, 1977, which were quite detailed and
objective and  led to the making of the Order. The Order was
a  genuine  attempt  to	 secure	 equitable  distribution  of
energy. It  was true that the Company was the worst sufferer
under cl.  6 (a)(i)  of the  Order, but then it was also the
greatest consumer. [737C-F]
715
     16. From  the Chief  Secretary's letter  dated November
20, 1968  it appeared  that the State Government had assured
the Company  that it  would meet  the interim requirement of
the Company  for 2  or 3 years from the UPSEB and facilitate
the parallel  running of  the Company's new power station in
addition to  the station which had been set up at Renusagar.
But the	 State was  not	 a  party  to  the  agreement  dated
November 30, 1976 for the supply of additional 30mw. because
the agreement was made between the Company and the UPSEB. It
was expressly  stated in  that agreement  that it  would  be
subject to  the provisions  of the  Electricity Acts of 1910
and 1948 and the rules and regulations thereunder, including
the amendments	thereto. Care was also taken to provide that
the  UPSEB   shall  not	  be  responsible   for	 damages  or
diminutions in	the supply of energy according to the orders
issued by the State Government. A similar provision was made
in the	earlier agreement  of 1959. In the Board's letter to
the  Company   dated  September	  2,  1972   reference	 was
specifically  made   to	 the  State  Government's  power  to
"control the distribution and consumption of energy under s.
22B of the Indian Electricity Act, 1910." [739A-D]
     17. Decisions  in the  matter  of	restrictions  to  be
imposed on  the consumption  of energy	on account  of acute
shortage of energy in the State, were taken by the different
State Governments, including the Governor's Advisors, and it
cannot be  said that  the cuts	were  imposed  suddenly,  or
without due regard to the company's difficulties in reducing
its consumption	 of energy  in the  manner directed  by	 the
order. It  cannot therefore, be said that the State wantonly
disregarded  its  contractual  obligation  to  the  company.
[739E-F]
     18. Sub-section  (2) of  s. 22B of the Act specifically
provided that it was permissible for the State Government to
direct by the order that the UPSEB shall not comply with the
provisions  inter  alia	 of  any  contract  made  by  it.  A
direction to that effect was expressly made in cl. 11 of the
Order, and  so it  is not  permissible for  the	 company  to
complain on that account. [739G]
     19. Craics	 on Statute  Law (7th Edn.) pages 357-58 has
mentioned six  different classes  of  enactments  which	 are
considered as  having ceased  to be in force. These six have
been mentioned	as the	enactments which  are  selected	 for
inclusion in  the Statute  Law Revision	 Acts of  England as
having ceased  to be  in force	otherwise  than	 by  express
repeal, or  having by  lapse of	 time  or  otherwise  become
unnecessary. [740G, 741D]
     The question is whether the order could be said to have
"spent" itself	or become  "obsolete". Whether	a  piece  of
legislation has	 spent itself  or exhausted  in operation by
the accomplishment  of the  purpose for which it was passed,
or whether the state of things contemplated by the enactment
has ceased  to exist  are essentially  questions of fact for
the legislature	 to examine, and no vested right exists in a
citizen to  ask for  a declaration  that the  law  has	been
impliedly repealed on any such ground. [741E-F]
     20. The  power to	legislate is  both positive  in	 the
sense of  making  a  law,  and	negative  in  the  sense  of
repealing a  law or  making it imperative. In either case it
is the	power of  the legislature,  and should	lie where it
belongs. In  an extreme	 and a	clear  case,  no  doubt,  an
antiquated law	may be said to have become obsolete-the more
so if  it is a penal law and has become incapable of user by
a drastic  change in the circumstances. But the judge of the
change	should	be  the	 legislature,  and  courts  are	 not
expected to undertake
716
that  duty   unless  that   becomes  unavoidable   and	 the
circumstances are so apparent as to lead to one and only one
conclusion. This is equally so in regard to the delegated or
subordinate legislation. [741G-742A]
     Elwood Hamilton  v. Kentucky  Distilleries &  Warehouse
Co., 64	 L.ed. 194;  Chastleton Corporation  v. A.  Leftwich
Sinclair, 68  L.ed. 841;  Nashville, Chattanooga & St. Louis
Railway v.  Herbert S.	Walters, 79  L.ed. 949; The Union of
India v. Ram Kanwar & Ors., [1962] 3 SCR 313; referred to.
     The Petition  of the  Earl of  Antrim &  11 Other Irish
Peers, [1967] AC 691; distinguished.
     21. The  High Court  found three facts (i) the shortage
in the reservoirs for generation of hydel energy had ceased,
(ii) further  supply of	 energy	 was  available	 from  newly
commissioned units,  and (iii)	fresh power  connection	 had
been given  by the  UPSEB, but	lost sight  of the important
fact that  it was all along the case of the State that hydel
energy was  only one-third of the total generation, and that
generation of  thermal energy  which met  two third  of	 the
total  requirement  had	 declined  for	reasons	 beyond	 the
control of  U.P.S.E.B. The  High  court	 did  not  therefore
undertake a  careful examination of the facts, and took some
new connections	 into consideration  without  attempting  to
examine their magnitude and effect on the overall generation
and availability  of energy  from all  the sources. The High
Court  therefore   erred  in   taking  the   view  that	 the
continuance of	the Order  was no longer justified. Even so,
the High Court abstained from striking down the whole of the
Order and  merely declared  that the  provision of the first
proviso to  cl. 6(a)  (i) was  ultra vires,  and quashed it.
[743C-F]
     22. Even  though the  proviso is  valid and has wrongly
been quashed  by the  High Court,  it is  not  necessary  to
restore it  in	view  of  the  statement  of  the  Solicitor
General, so  that it shall not be deemed to form part of cl.
6(a)(i) of  the Order.	But it there is deterioration in the
generation of  energy again,  or there	are other sufficient
reasons, within the purview of s. 22B of the Act to reinsert
the proviso,  in the  present or  modified form, it would be
permissible for the State Government to do so accordingly to
the law. [743G-H, 744C]



JUDGMENT:

CIVIL APPELLATE JURISDICTION: Civil Appeals Nos. 921/78 and 425/79 Appeals by Special Leave from the Judgment and Order dated 27-4-1978 of the Allahabad High Court in Writ Petition No. 3732/77.

M. V. Goswami for the Appellant (In CA 921/78) S. S. Ray, D. Gupta, Shiv Dayal, N. R. Khaitan, U. K. Khaitan and G. Mitra for the Respondent in CA 921/78 and Appellant in CA 425/79.

S. N. Kacker, Sol. Genl. of India, G. C. Dwivedi, S. C. Bhudhwar, S. Markendaya and K. Madan Mohan Reddy for U. P. State Electricity Board (Appellant No. 2 in CA 921/78).

717

The Judgment of the Court was delivered by SHINGHAL J.-These appeals by special leave arise from the judgment of the Allahabad High Court dated April 27, 1978. While Civil Appeal No. 921 of 1978 has been filed by the State of Uttar Pradesh, the U.P. State Electricity Board and the Executive Engineer of the Rihand Power Station, hereinafter collectively referred to as the State, Civil Appeal No. 425 of 1979 has been filed by the Hindustan Aluminium Corporation Ltd., its Vice President and Chief Accountant, hereinafter referred to as the Company. We have heard the two appeals together and will dispose them of by a common judgment.

The controversy relates to the supply of electrical energy (for short "energy") for the production of aluminium, which is the most modern of the common metals. Unlike the other common industrial metals like iron, copper, zinc and lead, pure aluminium is not produced by the direct smelting of its ores. The metal is now produced by the modern electrolytic method under the influence of direct current. It takes about 10 kilo watt-hours of electricity to produce a pound of aluminium, and the supply of cheap electric power is therefore an essential requisite or raw material for its production. The metal has many advantages and uses and has gained such importance that it is an essential commodity under the Essential Commodities Act and its production is one of the scheduled industries under the Industries (Development and Regulation) Act. While the State feels aggrieved because the High Court has interfered with the Uttar Pradesh Electricity (Regulation of Supply, Distribution, Consumption and Use) Order, 1977, dated September 19, 1977, hereinafter referred to as the Order, which it made under section 22B of the Electricity Act, 1910, (for short the Act), the Company's grievance is that the High Court has not granted all the reliefs which it had claimed in its petition under article 226 of the Constitution. The Court's record is much too voluminous, but it appears to us that the appeals can be adequately disposed of on the basis of the important averments in the lists of dates drawn up by counsel for the parties about which there is no dispute before us.

When the question of establishing a new aluminium factory arose for consideration by the Government of India, it took into consideration the consent of the Government of Uttar Pradesh to make energy available for the factory from the Rihand Hydro-electric Scheme which was expected to go into operation by the end of 1960, and granted an industrial licence to the Company on September 26, 1959, for the manufacture of 20,000 metric tonnes of aluminium ingots per year at Rihand. An agreement was also entered into between the State of 718 Uttar Pradesh and the Company on October 29,1959 for the supply of 55 m w of power on a firm, continuous and uninterrupted basis at a rate of 1.997717 paise per unit for a period of 25 years from the date of commencement of the supply.

The Company set up and commissioned its aluminium plant at Renukoot (near Rihand Dam) with an installed capacity of 20,000 metric tonnes per annum in April 1962. It was granted a further licence for the expansion of its installed capacity by 40,000 metric tonnes per annum. As the State was unable to meet the extra requirement of energy, sanction under section 28 of the Act was granted to the Company, at its request, on November 12, 1964, to set up a generating station at Renusagar, near Renukoot, through its subsidiary the Renusagar Power Company Ltd. It had two generating units of 67.5 m w each. The first unit started generating power in 1967 and the other in 1968. The 40,000 metric tonnes expansion unit was commissioned in 1968. In the meantime the Company was granted a licence in December 1966 for effecting a further expansion of 60,000 metric tonnes per annum in its installed capacity for the production of aluminium.

The Company thought of setting up the plant for the production of 60,000 metric tonnes of aluminium in Gujarat State as it was informed by the Gujarat State Electricity Board that it would be able to meet the requirement of energy there at a rate of Rs. 320/- per kilowatt year, which was much higher than the rate at which it was receiving energy from U.P. State Electricity Board (U.P.S.E.B.). The Government of U.P. held negotiations with the Company, and it was decided that the Company would produce the additional 60,000 metric tonnes of aluminium also in Uttar Pradesh. The Chief Secretary to the government of U.P. wrote a detailed letter to the Company on November 20, 1968, in which the position regarding the supply of energy was stated as follows,-

"Regarding the power plant, I can see no difficulty in meeting the interim requirements for 2 to 3 years from the U.P. State Electricity Board, nor do I see any difficulty in arranging for parallel running of your new power station, with the U.P. State Electricity Board."

The Company then addressed a letter to the State Government on September 26, 1969 stating the position regarding the supply and generation of increased energy for the expansion of aluminum production as follows,-

"5(a) The Scheme of power supply for our expansion by UPSEB is interlinked with the question of expansion of 719 Our Renusagar power plant and its parallel operation with your system. The application for the expansion of our Renusagar Power Plant has already been submitted to your office, a copy of which is enclosed herewith for your ready reference. The necessary permission for the same is requested as early as possible.
(b) The emergency assistance under parallel operation would be required for about 100 m w and the terms and conditions for the same would have to be decided simultaneously with the permission for expansion of our Power Plant."

It may be mentioned that the Company was granted sanction to expand Renusagar generation by 250 m w.

In 1972 the Company expanded its installed capacity for the production of aluminium by 35,000 metric tonnes per year. On its part, the U.P.S.E.B. sanctioned 110 m w additional energy under a phased programme to be compelled by June 1, 1975. It was clearly stated in the letter of the U.P.S.E.B. dated September 2, 1972, that the supply would be without prejudice to the power of the State Government to control the distribution and consumption of energy under section 22B of the Act. Reference in the letter was made to the acute shortage of power because of scanty rainfall in the catchment area.

It so happened that additional energy was not made available to the Company during 1972-75 although the rate was substantially increased (to 11 paise instead of 1.997717 paise) with retrospective effect from June 30, 1975, under the new aluminium policy of the Government of India. An agreement was however entered into between the Company and the U.P.S.E.B. on November 30, 1976 for the supply of 85 m w of energy on a continuous basis, for a period of 5 years, in supersession of the earlier agreements, and it was stipulated that it would be read and construed in all respects in conformity with the provisions of the Act, the Electricity (Supply) Act, 1948, and the rules and the regulations and the amendments thereto The Company received that supply and was even promised an additional supply of 35 m w over a phased period from July 1977, but did not get it. The Company was all the same able to raise its production of aluminium to 95,000 metric tonnes by April 7, 1977, because of the supply of 85 m w of energy.

In the meantime, the State Government took a decision by the end of December 1976 to reconnect some 70,000 pumping sets which had 720 been disconnected for non-payment of the electricity dues. That placed an additional load of about 400 m w on the grid system of the State. The Chairman of U.P.S.E.B. submitted a note on the power situation which was likely to obtain from April to July 1977. He pointed out that there was acute shortage of energy and suggested the imposition of some restrictions upto the end of July 1977 by when the demand for agriculture was expected to decrease and the Rihand and Matatila reservoirs would be filled up. That was proposed to meet the needs of agriculture and related industries and to meet the industrial demand to the extent possible. One of the proposals was for a 50 per cent cut in the demand of the Company and some other industrial units including Kanoria Chemicals and Industries Ltd. That note came up for consideration in the State Cabinet on April 1, 1977, and was partially approved. The U.P. Electricity (Regulation of Distribution and Consumption) Order, 1977, was therefore issued on April 7, 1977. Under clause 6(a) (i) of the Order, the Company could draw energy only to the extent of 42.5 m w i.e. 50 per cent of its monthly consumption; but it was allowed to draw 55 m w for the time being.

Uttar Pradesh came under the President's rule on April 30, 1977, and the Company was allowed to draw 55 m w until further orders. It is the case of the State that the shortage of energy became more acute in the third week of May. The Company, in the meantime, filed its first writ petition [No. 1790(c) of 1977] on receipt of a letter of the Executive Engineer (O.&M.), Rihand, that the power supply to the Company should be cut off completely with immediate effect. The writ petition was dismissed on May 20, 1977, because of a subsequent letter by the Government requiring the U.P.S.E.B. to continue the supply of 42.5 m w energy instead of 55 m w in accordance with the aforesaid Order of April 7, 1977.

The Secretary of the Power Department of the State government sent a note to the Governor on May 24, 1977, proposing some additional cuts in the supply of energy. Decision thereon was deferred until information was obtained from other States in regard to availability of energy to aluminium plants. A fresh note was thereafter prepared for orders. In that note dated May 31, 1977, it was stated that there was a large gap between demand and availability of energy and that was creating a serious imbalance requiring load shedding on a large scale, and that had given rise to discontent in all sectors of the economy and, in particular, in the rural sector. It was also pointed out that overriding public interest, particularly the need to maintain 721 food supply and the industrial production, required that units which were heavy consumers of energy should be subjected to further cut in the consumption of energy. It was particularly pointed out that as the Company was itself generating energy at Renusagar, it will have more than 50 per cent of energy even if the Board's supply of 42.5 m w was completely withdrawn, and that will service some 8500 pumping sets. It was, all the same, stated that the Company would continue to have 60 m w from the U.P.S.E.B. as stand by supply as in the past. The Governor approved that proposal on June 1, 1977. A proviso was, inter alia, inserted in clause 6(a)(i) of the U.P. Electricity (Regulation of Distribution and Consumption) Order, 1977, on June 2, 1977, according to which the industrial consumer which had its own source of generation of energy from which it obtained 50 per cent or more of its total consumption would suffer a cut of 100 per cent in the energy supplied by the U.P.S.E.B. The Company was accordingly given time to bring about the total cut.

In the meantime, the Company filed its second writ petition [No. 2160(c) of 1977] along with an application for stay. The High Court admitted the writ petition, but rejected the application for stay. The Company then moved this Court for special leave. The Hon'ble Vacation Judge made an observation that the matter may be discussed by the parties concerned, and the State agreed to give 20 m w of energy to the Company for the time being.

Fresh elections were held to the State Legislative Assembly, and the new Cabinet was sworn in on June 23, 1977. It decided to reduce the supply of energy to the Company to zero, in pursuance of the amendment dated June 2, 1977, and called for a fresh note on the position regarding the generation and distribution of energy. The Executive Engineer, Rihand, accordingly asked the Company to reduce the consumption to zero.

A detailed note was prepared by the Secretary concerned on June 28, 1977, and it came up for consideration in the Cabinet on June 30, 1977, but no decision was taken and the note was kept pending. It appears that the Chairman of the U.P.S.E.B. prepared a note on August 26, 1977, in which he pointed out the shortage of energy, including a substantial fall in the generation of thermal energy and in the "import" of energy. It appears that the Minister concerned made some statements in regard to the generation of energy in the State and the position of the Company, but we shall refer to them later when we deal with the allegation regarding malice in law. It will be sufficient to say that the State Government made the Order 722 on September 19, 1977, called the Uttar Pradesh Electricity (Regulation of Supply, Distribution, Consumption and Use) Order, 1977. It has undergone some amendments, but learned counsel are in agreement that they have no bearing on the controversy before us.

The Company filed its third writ petition (No. 3732 of 1977), against the Order, on September 26, 1977. It was admitted the same day and the earlier writ petition (No. 2160 of 1977) was dismissed as withdrawn. The High Court directed the Company to make an application under clause 10 of the Order, for exemption, but it was rejected all December 9, 1977 when made. The High Court ultimately heard and decided the writ petition by the impugned judgment dated April 27, 1978 against which these appeals by special leave have been directed as aforesaid. This Court made an order on May 4, 1978 for the supply of 20 m w of energy to the Company as a purely interim arrangement. That was raised to 35 m w by an order dated August 29, 1978, and the State is now supplying 42.5 m w to the Company as an interim arrangement.

These basic facts are not in dispute before us. We shall examine the arguments of the learned counsel for the parties with reference to them, after taking into consideration the other well settled facts on which reliance has been placed by learned counsel, and with due regard to the relevant averments of the parties.

The High Court has recorded a number of findings. We shall have occasion to refer to those of the findings which have been challenged before us. It may be sufficient to say here that the High Court has worded the operative part of its judgment as follows,-

"In view of the aforesaid discussion the provisions of the first proviso to clause VI (a)(i) of the Uttar Pradesh Electricity (Regulation of Supply, Distribution, Consumption and Use) Order, 1977 dated September 19, 1977 are declared ultra vires and are quashed. The U. P. State Electricity Board is directed to supply electrical energy to the petitioner in accordance with law without taking into consideration the provisions of the said proviso".

In order to examine the findings of the High Court about the invalidity of the proviso to clause 6(a) (i) of the order, it will be convenient to examine the relevant findings of the High Court on the various points of law.

The High Court has taken the view that it is the statutory obligation of the U.P.S.E.B. because of the obligation of a licensee under 723 sections 18 and 26 of the Electricity (Supply) Act, 1948 to supply electrical energy to a consumer. Reference in this connection has also been made to clause VI of the Schedule to the Act.

Clause (h) of section 2 of the Act defines a "Licensee" to mean any person licensed under Part II to supply energy. Section 26 of the Act of 1948 provides, inter alia, that, subject to the provisions of that Act, the Electricity Board shall in respect of the whole State, have all the powers and obligations of a licensee under the Indian Electricity Act, 1910, and the Act of 1948 "shall be deemed to be the licence of the Board" for purposes of the Act (of 1910). The first proviso to the section excludes the application of some sections, including section 22, of the Act, and the second proviso states that the provisions of clause VI of the Schedule to the Act shall apply to the Board in respect of that area only where distribution mains have been laid by the Board and the supply of the energy through any of them has commenced.

While, therefore, the U.P.S.E.B. is a licensee under the Act, it will be sufficient, for purpose of the controversy before us, to say that section 22 of the Act is not applicable to it, and clause VI of the Schedule is applicable to it subject to the restriction contained in the second proviso to section 26 of the Act of 1948. So even though the Board is a licensee, the obligation under section 22 of the Act to supply energy to every person within the area of its supply is not fastened on it.

The provisions of the Schedule to the Act are deemed to be incorporated in, and to form part of, every licence granted under Part II. Clause VI of that Schedule states that where after distributing mains have been laid down and the supply of energy through them has commenced, a requisition is made by the owner or occupier of any premises situate within the area of supply requiring the licensee to supply energy for such premises, the licensee shall make the supply and shall continue to do so in accordance with the requisition. But, as has been pointed out, the second proviso to section 26 of the Act of 1948 places a restriction on that obligation for it says that the provisions of clause VI shall apply to the Board in respect of that area only "where distribution mains have been laid by the Board and the supply of energy through any of them has commenced".

Clause (i) of section 2 of the Act defines a "main" to mean any electric supply-line through which energy is or is intended to be, supplied to the public. A "distribution mail" has been defined by clause (e) of the same section to mean the portion of any main with which a service line is, or is intended to be, immediately connected. We 724 have also gone through the definitions of "electric supply- line" and "service-line". They leave no doubt that a "distributing main" is different from an electric supply- line, for to it a service-line is immediately connected.

The High Court has stated that the Company gets its supply from the Pipri Bus Bar, which is composed of a set of conductors which are made up of thick aluminium core steel reinforced cables, and has taken the view that the Pipri Bus Bar is a "distributing main" under section 2(e) of the Act and is an electric supply-line as defined in section 2(f) so that clause VI of the Schedule to the Act would be fully applicable to the Board in so far as its obligation to the Company is concerned.

But as has been stated in the second proviso of section 26 of the Act of 1948, the provisions of clause VI of the Schedule to the Act could apply to the U.P.S.E.B. in respect of that area where distribution mains had been "laid by the Board". It was therefore a question of fact whether that was so, and had to be examined on the basis of the averments of the parties to that effect. It is however not disputed before us that the Company did not plead that distributing mains had been laid by the Board for supply of energy to the Company, or to any one else, from the Pipri Sub-station. The State had therefore no occasion to controvert any such allegation. This has in fact been admitted to be so by Mr. Ray in his arguments, and the High Court went wrong in recording a finding of fact against the State without any basis for it in the pleadings. We have also gone through section 18 of the Act of 1948 to which reference has been made in the judgment of the High Court, but it is also of no avail to the Company. The section makes a mention of the general duties of the Board, but it does not make it obligatory for it to supply energy to every person irrespective of its practical difficulties.

The High Court has in fact quoted extensively from its earlier judgment in Civil Miscellaneous Writ Petition No. 618 of 1972 to which one of the two Judges was a party. It is not disputed, however, that when an appeal was taken against that judgment, the writ petition was itself withdrawn and was dismissed, so that judgment of the High Court may not be said to have subsisted thereafter, and need not have formed the basis of the finding of the High Court against the Board in regard to its duty to supply the energy asked for by the Company-the more so when the decision on the point should have turned on the facts pleaded and established on the record.

725

Mr. Ray for the Company has however invited our attention to a decision of the Rajasthan High Court in firm Sadul Cotton Ginning and Pressing Factory v. Rajasthan State Electricity Board.(1) But that was a different case where it was not pleaded by the Electricity Board that clause VI of the Schedule to the Act was not applicable to it as the distributing mains had not been laid by it. The High Court therefore erred in taking the view in the present case that the Board was bound by the terms of clause VI of the Schedule to the Act to supply energy to the Company within one month of the making of the requisition or within such longer period as the Electrical Inspector may allow. But even if it were assumed that the Board was under an obligation to supply energy to every person, the fact nonetheless remains that the State Government had the overriding power to provide, by order made under section 22B of the Act, for regulating the supply, distribution, consumption or use thereof. In fact sub-section (2) of that section categorically states that, without prejudice to the generality of the power under sub-section (1), the order, may direct the Board not to comply with any contract, agreement or requisition for the supply of energy etc. The High Court erred in taking a contrary view.

It has next been argued that only the energy which was generated by the Board could be the subject-matter of an order under section 22B of the Act and it was not permissible for the State to take into account the energy generated by the Company for its own use.

It may be recalled that the Company applied for the grant of sanction under section 28(1) of the Act to generate 120 m w of energy for the additional production of aluminium. That was allowed and a notification was issued on November 12, 1964, granting sanction to the Renusagar Power Company Limited (a wholly owned subsidiary of the Company) to engage in the business of supplying energy to the Company. It has two generating units and 135 m w power is being generated by the Renusagar Station for the exclusive use of the Company, and it is this energy for which it has been argued that it cannot be the subject-matter of an order under section 22B.

But sub-section (1) of section 28 of the Act in terms refers to, and deals with, engaging by a non-licensee, in the business of supplying energy to the "public". It is therefore futile to contend that what was generated by the Renusagar Power Company was not meant for supply to the public but was the Company's own energy. It is true that that generation became, in the circumstances, the "captive" generation for the use of the Company, but that is far from saying that, in 726 the eye of law, it was not energy meant for supply to the public or that it was not amenable to control under section 22B. It must therefore be held that it was not amenable to control under section 22B. It must therefore be held that it was also liable to equitable distribution by an order under section 22B of the Act.

The expression "energy" has been defined by clause (g) of section 2 of the Act as follows,-

"(g) "energy" means electrical energy-
(i) generated, transmitted or supplied for any purpose, or
(ii) used for any purpose except the transmission of a message".

It is therefore a pervading definition, and there is no reason why energy generated and supplied under section 28 of the Act should not fall within its sweep.

We are mindful of the fact that while section 22B of the Act occurs in Part II, the aforesaid section 28 is in Part III, but that will not really take the supply of energy under section 28 out of the control of section 22B. Part II deals with "supply of energy" by licensee, while Part III deals with "supply, transmission and use of energy by non- licensees". But when it was thought necessary to vest the State Government with the power to give directions to licensees (under section 22A), and to control the distribution and consumption of energy (under section 22B), it became necessary to insert sections 22A and 22B by Act 32 of 1959. The Legislature therefore inserted both the sections in Part II which occurred earlier than Part III, and under the broad fabric "Supply of Energy". As is obvious, insertion of sections 22A and 22B would not have been appropriate in Part III, and the Legislature cannot be blamed if it preferred the inclusion of the two sections together in Part II rather than in the residuary Part IV. Moreover it is by now well settled that the true meaning of a provision of law should be determined on the basis of what it provides by its clear language, and with due regard to the scheme of the law as a whole, and not merely by the place it finds in the formation of its Parts or Chapters.

An ancillary argument has been advanced that if sub- section (1) of section 22B of the Act is read with due regard to sub-section (2), it will appear that, like sub- section (2), sub-section (1) is also confined to a licensee and will not be applicable to the energy supplied by a sanction-holder under section 28. Our attention in this connection has been invited to the use of the article "the" in sub-section (2) while stating that the order made under sub-section (1) may direct 727 "the licensee' not to comply with the matters stated in clauses (i) to (iii). The argument is untenable for two reasons. Firstly, subsection(1) of section 22B refers to the State Government's power to control the distribution of energy as a whole and not merely the energy generated by a licensee, and there is no rule of construction by which the restricted scope of sub-section (2), which deals only with the licensees should govern the scope of sub-section (1) and confine it to licensees. Secondly, the purpose of sub- section (2) is to provide exceptions of the nature which are peculiar to licensees and are necessary to save them from the statutory obligations mentioned in the three clauses of the sub-section. It appears that the use of he article "the" in sub-section (2) is not quite appropriate, but we have no doubt that there is no justification for the argument that section 22B is applicable only to licensees and not to a sanction holder under section 28.

What section 22B of the Act authorises the State Government to do, is to make an order providing for "regulating" the supply, distribution, consumption or use of energy, and it has been held by the High Court that the section does not confer the power to prohibit the supply of energy to any consumer. The High Court has gone on to hold that Parliament did not confer on the State Governments the power to cut off supply to existing consumers. Mr. Ray has supported the view of the High Court and has invited our attention to the decisions in Municipal Corporation of the City of Toronto v. Virgo,(1) Attorney General for Ontario v. Attorney-General for the Dominion and the Distillers and Brewers' Association of Ontario,(2) Birmingham and Midland Motor Omnibus Co. Ltd. v. Worcestershire County Council(3), Tarr v. Tarr(4), The Automobile Transport (Rajasthan) Ltd. v. The State of Rajasthan and others(5) and State of Mysore v. H. Sanjeeviah(6). As against that the learned Solicitor General has placed reliance on the view taken in Fatechand Himmatlal and others v. State of Maharashtra etc.(7) that 'regulation', if the situation is necessitous, may reach the limit of prohibition.

It appears that a distinction between 'regulation' and 'restriction' or 'prohibition' has always been drawn, ever since Municipal Corpora-

728

tion of the City of Toronto v. Virgo (supra). 'Regulation' promotes the freedom or the facility which is required to be regulated in the interest of all concerned, whereas 'prohibition' obstructs or shuts off, or denies it to those to whom it is applied. The Oxford English Dictionary does not define "regulate" to include prohibition so that if it had been the intention to prohibit the supply, distribution, consumption or use of energy, the Legislature would not have contented itself with the use of the word "regulating" without using the word "prohibiting" or some such word, to bring out that effect.

But where the High Court went wrong was in thinking that the Order had the effect of prohibiting the supply of energy to the Company, which was an "existing consumer". The proviso to clause 6(a) (i) of the Order to which exception has been taken, states as follows,-

"Provided that where any such industrial consumer has his [own source of generation of energy which alone enables him to obtain] 50 per cent or more of his total consumption, then a cut of 100 per cent in the energy supplied by the Uttar Pradesh State Electricity Board shall be exercised."

What has therefore been ordered is no more than a cut of 50 per cent in the monthly consumption of electricity and not a total prohibition of consumption of energy. That is a step in the direction of regulating the consumption of energy as far as it goes, and it is overridden with the further regulation contained in the proviso in the case of an industrial consumer having its own source of generation of energy "which alone" enabled him to obtain 50 per cent or more of his total consumption so as to ensure even to him a consumption of 50 per cent of energy and not a total prohibition. The proviso therefore operates in a special or particular field and for a particular purpose where it is considered necessary for regulating the supply etc. of the energy in the interest of the other consumers, for section 22B is meant to maintain the supply and secure the equitable distribution of energy to all concerned. We are constrained to say that the High Court did not properly appreciate this aspect of the matter.

The High Court has gone on to hold that no power was vested in the State Government under section 22B of the Act to issue an order that certain preferences will be followed in supplying energy. The High Court has found it established that after power supply was totally "disconnected" by the Board to the Company, "power supply connections were given to the agricultural sector and agro-based industries." This appears to be the High Court's finding in regard to the argument that the Order was bad as it was not permissible to adjust the priorities 729 by an order under section 22B. Learned counsel for the Company have argued that the only permissible preference was that under section 22A in favour of an establishment mentioned in it and that the preference shown to individual consumers was illegal.

Now so far as clause 6(a) (i) of the Order is concerned, it does not, by itself, provide for any preferences or priorities, beyond excluding "fertilizers" from the cut of 50 per cent on all large and heavy industrial power consumers receiving power at 33 k v and more. Clause 7 of the Order deals with "exemptions", and "fertilizers manufacturing establishments" have been included there amongst the consumers to whom the cut referred to in clause 6 of the Order shall not be applicable. It has not been argued before us that it was not permissible for the State Government to provide for exemptions in an order under section 22B, and we have not been referred to any such data or material on the basis of which it may be possible to examine whether the exemptions in question were in derogation of the concept of "maintaining and securing the equitable distribution of energy" under section 22B.

It may be that the State Government was of the opinion that supply of energy to the agricultural sector and agro- based industries was more necessary and would benefit the state more substantially than the supply made to heavy industrial consumers, but merely because any such preference has been entertained by the State Government, it cannot be said that it necessarily runs counter to the concept of equitable distribution of energy stated in section 22B. In fact counsel for the Company have repeatedly urged before us that the cut of 50 per cent referred to in clause 6(a) (i) was meant to deprive only a few consumers of energy, and that the cut of 100 per cent under the proviso operated exclusively against the Company. And it has to be appreciated that clause 6(a) (i) deals only with large and heavy industrial power consumers receiving power at 33 kv and above, and it is hardly permissible for such a heavy consumer as the Company to complain of any preference that may have been shown to small consumers in the field of agriculture, or agro-based or other small industries. The fact remains that large and heavy industrial consumers of the category mentioned in clause 6(a) (i) are a class by themselves and it is hardly permissible for them to complain that the small preference shown to agriculturists in supplying energy for their water pumps or tube-well, or in energising State tube-wells supplying water to them, or the supply of energy to small scale industries has really created a privileged class of consumers or brought into existence any such concept of priorities as to run counter to or defeat the objective of bringing about the equitable distribution of energy by an order 730 under section 22B. No glaring instance of any preference has been brought to our notice so as to raise in us a desire to examine the question whether it was necessary or proper for the State Government to provide guidelines for the small preferences shown by it to the aforesaid consumers. In fact it has been admitted in the written arguments which have been filed and received in Court that, in the present case, the company is "not sure as to what exactly has happened". In such a situation, we are not persuaded that the High Court had any real justification for recording an adverse finding against the State on the question of the so-called preferences or priorities. Learned counsel for the Company were not able to refer us to any plea in the writ petition about illegal priorities or preferences. Nor could they refer to a plea that any preference or priority shown by the State was the very antithesis of the concept of equitable distribution which, for the purpose of maintaining the supply of energy, was the very object of the Order. If any such plea had been taken, it would have been permissible for the State to take any defence that may have been open to them. But merely because the word preference or priority has been used by the State for the purpose of comparing the grantees of energy in preference to the Company, or as a matter of priority over the consumption of energy by a giant consumer like the Company, it will not be fair and reasonable for us to hold that the State has established a class of privileged consumers, and to set aside the grant of energy to them in their absence and without examining the facts and circumstances of their respective cases. The purpose of the Order is to maintain the supply of energy and to secure its equitable distribution. One such method was to conserve energy by virtue of the provisions of clause 6(a)

(i). If that has been done according to law; and if the resultant saving of energy is frittered away by showing unlawful preferences or creating unlawful priorities by other orders of an administrative nature, there is nothing to prevent the aggrieved party, including the Company, from challenging it according to the law, in an appropriate proceeding, if so advised. But any such grievance cannot be examined in these proceedings for the Order has the avowed object of bringing about equitable distribution of the conserved energy in an honest and forthright manner and there is nothing on the record for us to hold otherwise.

It has next been argued that the validity of the Order, which is by way of a piece of subordinate legislation, is open to judicial scrutiny and that the subjective satisfaction of the State Government in making it is open to challenge in a court of law.

It will be enough for us to say that subordinate legislation is by now a well-recognised form of legislation for practical reasons. The modern 731 administrative machinery is quite complex and it is often found difficult to pass complicated legislative measures through the full parliamentary procedure and on a permanent or durable basis. Even a carefully drafted Act may not work well in actual practice. It may also be that the exact means of achieving the object of an Act may not be adequately comprehended all at once, and it may be useful to provide for some elasticity in the actual working of a law. That can best be done by leaving some of the details to subordinate legislation. That is why some legislative powers are delegated to executive authorities, subject of course to the purpose and the scheme of the parent Act, the constant vigil of the Parliament or the State Legislature, and the Judicial control. These are reliable safeguards and with their easy availability, it is no surprise that subordinate legislation is now so voluminous that it may well be said to have dwarfed the parent.

The grounds of challenging the validity of subordinate legislation are well known. The challenge may be on the ground that the power to make the law could not have been exercised in the circumstances which were prevailing at the time when it was made, or that a condition precedent to the making of the legislation did not exist, or that the authority which made the order was not competent to do so, or that the order was not made according to the procedure prescribed by law, or that its provisions were outside the scope of the enabling power in the parent Act or were otherwise violative of its provisions or of any other existing statute. As it happens, none of these grounds or circumstances has been shown to exist in the present case. The High Court has taken the view that the Company was unable to establish as a fact that there was no shortage in the generation of energy at the time when the order was made under section 22B. It is no body's case that the State Government was not competent to make the order, or that it did not comply with any procedural requirement of the Act in making the order, or that its provisions (or any of them) are outside the scope of the enabling power or are violative of the provisions of any other law. We have examined some of the points of law on which the High Court has found some provisions of the order to be invalid, and we have given our reasons for taking a different view. We have no doubt that the State Government formed its opinion about the necessity and expediency of making the order for the purposes of maintaining the supply and securing the equitable distribution of energy at a time when that was called for, and this Court cannot sit as a court of appeal to examine any and every argument in an attempt to show that the opinion of the State Government was vitiated for one fanciful reason or the other. It has to be appreciated that the question whether the reasons which led to the 732 making of the order were sufficient, was essentially for the State Government to consider.

The validity of the order has been challenged on the ground that it suffers from the vice of malice in law. But that is a point by itself and we shall examine it separately.

It will thus appear that the above arguments which have been advanced against the validity of clause 6(a) (i) of the order are not justified. The whole of the clause reads as follows,-

"6(a) (i) In respect of electrical energy consumed by all large and heavy power industrial consumers receiving power at 33 kv and above, excepting fertilizers, from the U.P. State Electricity Board a cut of 50 per cent in their monthly consumption of electricity both in respect of energy and demand shall be exercised:
Provided that where any such industrial consumer has his own source of generation of energy which alone enables him to obtain 50 per cent or more of his total consumption, then a cut of 100 per cent in the energy supplied by the Uttar Pradesh State electricity Board shall be exercised."

It thus deals with the consumption of energy by all (excepting fertilizers) large and heavy industrial power consumers receiving power from the U.P.S.E.B. at 33 kv and above. It imposes a cut of 50 per cent in their monthly consumption of energy. Then it adds the provision that where such an industrial consumer has his own source for the generation of energy which by itself gives him 50 per cent or more of his total consumption of energy (provided for in the main clause), then it will not receive any energy from the U.P.S.E.B. as the cut in its supply will then be 100 per cent. The clause therefore subserves the purpose of section 22B for, in a period of scarcity or insufficiency of the supply, it will have the effect of regulating the same and thereby securing the equitable distribution thereof.

It is true that although the order has been made on the ground that the State Government is of opinion that it is necessary and expedient for maintaining the supply and securing the equitable distribution of electrical energy, to provide for regulating the supply, distribution, consumption and use thereof, and has been called the Uttar Pradesh Electricity (Regulation of Supply, Distribution, Consumption and Use) order 1977, it does not deal with all those matters in details. In fact it may well be said to be an order relating essentially to compulsory cut in the consumption of energy. But that cannot detract from the basic fact 733 that the order has the sanction of section 22B of the Act and subserves the main purpose thereof, even though there may be justification for the criticism that it does not go far enough in its regulative enterprise in the expansive field set out for it in the preamble. At any rate, it cannot be said to be beyond the scope and the ambit of that section, and its validity is not really open to challenge as a piece of subordinate legislation.

It has however been strenuously argued on behalf of the Company that the order should be struck down on the ground of malice in law on the part of the State Government. That no doubt is another aspect of the doctrine of ultra vires, for an offending Act can be condemned simply for the reason that it is unauthorised. Bad faith has often been treated as interchangeable with unreasonableness and taking a decision on extraneous considerations. In that sense, it is not really a distinct ground of invalidity. It is well settled that if a discretionary power has been exercised for an "unauthorised purpose", that is enough to invite the Court's review, for as has been said quite widely but properly by Rand J. in Roncarelli v. Duplessis,(1) malice is "acting for a reason and purpose knowingly foreign to the administration." But the question is whether this has been Proved to be so in the present case.

Mr. Ray has argued on behalf of the Company that the order is malafide, and has been made in the colourable exercise of the power under section 22B of the Act simply to compel the Company to agree to the payment of a higher rate for the supply of energy to it. He has tried to establish his argument on the basis of the statement of the Chief Secretary of the State Government dated July 8, 1977 and some statements of the Minister concerned. We shall examine them separately.

What the Chief Secretary said in his press statement dated July 8, 1977, was that the State Government had reduced the supply of power to the Company from 85 m w to 10 m w and that it had been decided to almost double the rate for the supply of the power which was being given to the Company. It will be remembered that by virtue of the amendment which was made to the U.P. Electricity (Regulation of distribution and consumption) order on June 2, 1977, the Company was required to reduce its consumption of the Board's energy to zero, but it was, nonetheless, allowed to draw 30 m w for some time. That led to further directions for the reduction of consumption, and ultimately an order was made on June 29, 1977 for disconnecting the supply. A representative of the Company met the Minister concerned and explained the Com-

734

pany's difficulties. He asked for permission to draw at least 10 m w to keep the pots warm. The Minister agreed to that request, but only against the standby agreement for the demand of 60 m w. A letter to that effect was sent to the Company on June 30, 1977. As under the standby agreement, energy was to be supplied at the rate of 24 paise per unit, instead of 11 paise, the Chief Secretary merely stated the factual position on July 8, 1977. At any rate there is nothing to show that the plea of scarcity of energy was merely a ruse to charge a higher rate from the Company.

Mr. Ray has invited our attention to the statements of the Minister concerned dated July 18, 1977, July 28, 1977, September 14, 1977, August 29, 1978 and his reply to the Company dated October 18, 1978, to show that the State Government was not satisfied with the contractual rate for the supply of energy as it was below the cost of generation, and wanted to review and rescind the agreement altogether. We have gone through the record of the proceedings of the Legislative Assembly and we find that what the Minister said there was essentially correct that 10 m w energy was being supplied to the Company under the standby agreement. It was in that content that the Minister informed the Assembly that the charges for the said standby supply came to 26-28 paise per unit. The learned Solicitor General has taken us through the relevant record to show that the Minister did not really want to harm the Company unnecessarily, and if he stated further that he was never approached personally by the Company, or in a proper manner, or that the relief to the Company would be considered depending on how it contacted him for that purpose, the Minister simply wanted to state the facts and to convey his resentment against the attempt to influence him politically, or through any Minister of the Central Government.

The State has in fact filed a chart with its supplementary counter-affidavit about the supply of energy to the Company from February 1973 to April 7, 1977. It shows that during the period February 1973 to August 7, 1975 the Company received energy from 27.50 m w to 1.25 m w. It was only after the declaration of emergency on June 26, 1975 that the Company received some 55 m w of energy, and then a fresh agreement was made soon after on November 30, 1976 to supply 85 m w of energy. But even before that date, for a sufficiently long period, the Company got far more energy than what it was entitled to. We are therefore not satisfied that the Company has been able to establish malice in law merely because of what the Chief Secretary or the Minister stated here and there. It may well be that the new State Government was dissatisfied with the new agreement which had been 735 entered into at the instance of the political party which was then in power, but it cannot be said that the new Minister's desire to examine the validity or propriety of that agreement arose out of any extraneous or improper consideration so as to amount to malice in law.

Our attention has also been invited in this connection to certain statements on behalf of the State Government and the Board that energy was available in abundance, and it has been urged that even so the Company was denied its supply in spite of the agreements and the assurances of the State Government to the contrary. That is a point relating to the contractual rights of the Company and we shall come to it in a while.

Then it has been argued that even though the State Government professed in its affidavit that the cut in the consumption of energy by the Company could not be restored because of the desire to provide more energy for agricultural purposes, that was not really so and that any such attempt was in the nature of an extraneous consideration which vitiated the implementation of the Order. Reference in this connection has been made to the Company's averments in the supplementary affidavit that the load on account of agriculture and irrigation had declined, and there was in fact no diversion of energy to agriculture. In order to examine the point, we directed the State to prepare a statement for the entire period from January 1977 to December 1978. The Order was made on September 19, 1977, and the statement shows that consumption of energy for agricultural and irrigation purposes increased appreciably thereafter, and there is no justification for the argument to the contrary.

Another "extraneous" factor which is said to have been taken into consideration by the State Government in making the Order is said to be its view that the major portion of the aluminium produced by the Company was being consumed outside the State. A similar objection was raised before the High Court on the basis of an averment in the counter- affidavit of the State. The High Court has, however, recorded the finding that it would be "unsafe" to uphold that contention, and we see no reason to take a different view.

The other factors to which reference has been made as extraneous factors which vitiated the Order are said to be consideration of the facts that the Company had failed to expand its generating capacity, the financial loss suffered by the U.P.S.E.B. and the non-payment of the coal surcharge by the Company. But there is nothing on the record to show that these factors were taken into consideration at the time of making the Order. It may be that those or somewhat similar facts were mentioned 736 at one time or the other in answer to the complaint of the Company, or in justification of what the State Government had done, by way of defence, but that cannot justify the argument that they formed the basis for the making of the Order.

It has also been argued that while making the Order the State Government failed to take into consideration the facts that the production of aluminium was of considerable importance to the national economy and that the Board was capable of generating more energy but was not doing so. Reference has also been made to the new aluminium policy which the Central Government announced on July 15, 1975, and to the benefits which the U.P.S.E.B. was deriving from the aluminium products manufactured by the Company. But the argument is untenable because there is nothing to show that these factors were not taken into consideration while making the Order, and an inference that they were ignored cannot be drawn against the State merely because the Company was not permitted to consume all the energy it wanted and there was a fall in the production of aluminium because of the restriction imposed by the Order. It may be that the U.P.S.E.B. was capable of generating more energy, or that it was not running efficiently and had not succeeded in reaching its target of ideal generation. But here again it will be enough to say that although the High Court arrived at the conclusion that the Company deserved the writ which it granted, it did not find it possible to hold that the U.P.S.E.B. had deliberately under utilised its generation capacity. That is a finding of fact which does not call for interference by us.

There is thus no justification for the argument that there was malice in law on the part of the State Government in making the Order. It may be that the State gave an impression, after the Order had been made, that it had some spectacular effect on the fortune of the Company, or that it had brought about such efficiency as to ensure supply of energy to new entrepreneurs. It may also be that in doing so the State over-stated its resources of energy in order to open up a State which had not been able to develop its industrial resources satisfactorily, but what has to be examined in such cases is the true and the dominant purpose behind the Order. And as long as the dominant motive is proper and reasonable, and is not sullied by a mere pretext, the Order based on it will be valid when it is well within the true scope and policy of the Act and is an honest attempt to deal with the situation for which the power to make the Order had been granted by the Act.

It has however been further argued by Mr. Ray that the Order is invalid as it does not subserve the purpose of section 22B of the Act inasmuch as it does not secure the "equitable distribution" of energy.

737

Reference has been made to Jowitt's Dictionary of English Law, where "equitable" has been stated to mean "that which is fair", and to Corpus Juris Secundum to show that equitable is that which is done "fairly, justly and impartially". Our attention has been invited to the facts and circumstances which led to the establishment of the Company in the State of Uttar Pradesh and the agreement with and the assurances which were given to the Company. Our attention has also been invited to the new connections which were given by the U.P.S.E.B. to the other consumers while denying the contractual supply of energy to the Company.

It cannot be doubted that only that distribution can be said to be "equitable" which is "just and right under all the circumstances of the particular case" (The Century Dictionary). It will be remembered that the High Court has recorded a finding that there was shortage in the generation of energy when the Order was made. A great deal of statistical data has been laid before us and Mr. Gupta has tried to make full use of it on behalf of the Company. But the fact remains that the demand for energy was far in excess of the supply from all the sources available to the U.P.S.E.B. It has also been well established that a situation had arisen when it became necessary to obtain an order from the State Government about the course of action to be adopted by the Board. Self-contained notes were therefore drawn up in March 1977, and on May 24, 1977, June 28, 1977 and August 26, 1977. We have gone through the notes and they are quite detailed and objective. We have made a mention of the developments which took place because of those notes, including the making of the Order. We have no doubt that it was made because a situation had arisen when regulation of the supply, distribution, consumption and use of energy had become necessary, and the Order was a genuine attempt to secure equitable distribution of energy. It is true that the Company was the worst sufferer under clause 6(a)(i) of the Order, but then it was also the greatest consumer.

The basis for the making of the Order was the necessity or expediency for maintaining the supply and securing the equitable distribution of energy by means of an order providing for the regulation of the supply, distribution, consumption and use of energy. It has been argued by Mr. Ray that as power was supplied indiscriminately to new consumers after imposing a cut on the Company's consumption of energy, the issue of the Order was really a colourable exercise of the State Government's power under section 22B of the Act. Our attention in this connection has been invited to the averments in the affidavits which have been filed on behalf of the Company and to a 738 list of new connections filed as Annexure to the supplementary rejoinder affidavit of Suresh Chandra, Special Officer of the Company. Reference has also been made to a list of new connections filed in the High Court on March 6, 1978. Learned Solicitor General has however pointed out that even if all the new connections were to become effective within a period of two years, their incidence would be no more than 4 per cent of the total connected load as the real impact on the system would merely be an additional load of only 18 m.w. It has also been pointed out that while there was an increase of 9 per cent in the installed capacity of the U.P.S.E.B. for the generation of energy, the increase in the connected load was not more than 2 per cent. We have been informed that the percentage increase in the connected load had declined from 10 in 1974-75 to 2 in 1977-78, which showed that great care was being taken in incurring extra liability. The State has also filed a list of those applicants to whom new connections were sanctioned, but were not actually released, making a total of some 23 mw.

It has been urged on behalf of the Company that the Board had deliberately reduced its thermal generation. It has been pointed out that while there was a substantial increase in hydro-electrical generation, the performance in the thermal field was highly unsatisfactory. The State has supplied the necessary information which shows that the fall in thermal generation was due to the initial troubles of new plants, the poor performance of the plants, and the breakdown at Harduaganj. We have been informed that the performance of the U.P.S.E.B. was better than the Boards in the other States. We have also been told that the proposition that there was deliberate under-capacity operation of thermal machines is technically unsound because of the operating constraints in running the large thermal machines at loads lower than the rated capacity. We have made a reference to the finding of the High Court against the Company in this respect.

Another aspect of the controversy before us relates to the contractual liability of the State to supply the energy which it had assured to the Company. It has been pointed out that under the agreement dated October 29, 1959, the State was bound to supply 55 m w of energy upto 1987 and then an agreement was entered into on November 30, 1976, to supply additional 30 m w, making a total of 85 m w for a period of 5 years. It has therefore been argued that instead of fulfilling its obligation under the agreements and the other assurances which were given by the State from time to time, the State took resort to the provisions of section 22B to get out of its obligation and the making of the impugned Order was really a colourable exercise of that statutory power.

739

We find from the counter-affidavit of the State (October, 1977) that, as would appear from the Chief Secretary's letter dated November 20, 1968, what the State Government had assured the Company was to meet the interim requirement of the Company for 2 or 3 years from the U.P.S.E.B. and to facilitate the parallel running of the Company's new power station, in addition to the station which had been set up at Renusagar. It is also not without significance that the State was not a party to the agreement dated November 30, 1976, for the supply of additional 30 m.w., because that agreement was made between the Company and the U.P.S.E.B. It was in fact expressly stated in that agreement that it would be subject to the provisions of the Electricity Acts of 1910 and 1948 and the rules and regulations, including the amendments thereto. Care was also taken to provide that the U.P.S.E.B. shall not be responsible for damages or diminutions in the supply of energy according to the orders issued by the State Government, A similar provision was made in the earlier agreement of 1959. Reference was in fact specifically made in the Board's letter to the Company dated September 2, 1972, to the State Government's power to "control the distribution and consumption of energy under section 22B of the Indian Electricity Act, 1910".

We have made a reference to the manner and the stages in which the State Government took decisions for the restrictions to be imposed on the consumption of energy with due regard to the detailed factual notes which were submitted for its orders on account of the acute shortage of energy in the State. Decisions in the matter were taken by the different State Governments, including the Governors' Advisors, and it cannot be said that the cuts were imposed suddenly, or without due regard to the Company's difficulties in reducing its consumption of energy in the manner directed by the Order. We are therefore unable to take the view that the State wantonly disregarded its contractual obligations to the Company. But even if the Company had some cause of grievance on that account, that may well be said to be unavoidable, in the situation which had arisen when the Order was made on September 19, 1977. It has to be appreciated that subsection (2) of section 22B of the Act specifically provided that it was permissible for the State Government to direct by the Order that the U.P.S.E.B. shall not comply with the provision, inter alia, of any contract made by it. A direction to that effect was expressly made in clause 11 of the Order, and it is not permissible for the Company to complain on that account.

It is not disputed that the consumers which were hit by the provisions of clause 6(a) (i) of the Order were the Company, the Kanoria 740 Chemicals and Industries Ltd., the Indian Railways, the Indian Explosives Ltd., and the Fertiliser Corporation of India. The last three of these have been exempted from the rigour of the Order. As regards the Kanoria Chemicals and Industries Ltd., the State has stated in its reply that it was manufacturing Benzena Chloride and BHC which are used for agricultural purposes and for purifying drinking water. They were entitled to 50 per cent of their consumption, and the State allowed them exemption to the extent of 3 m w making it permissible for them to consume 12.5 m.w. It cannot therefore be said that the continued supply of energy to Kanoria Chemicals was proof of any hostility on the part of the State in so far as the Company was concerned. It may also be that, as has been argued on behalf of the Company, some other restrictions which were initially imposed on some other consumers under the Order were withdrawn, so that it is the Company which is the main sufferer under the Order. Even so, it is not reasonable to take the view that the Order was not justified when it was made, and it cannot be held to be invalid merely because the Company is the main sufferer under it. It is not its case that the Order was discriminatory and should be struck down under article 14 of the Constitution. As has been stated the High Court has in fact found that the Company was "unable to establish as a fact that there was no shortage in the generation of electricity when the impugned Order was made under section 22B of the Act of 1910."

The Order was therefore justified and was a valid Order when it was made on September 19, 1977. The question is whether there is force in the argument that it has ceased to be in force and stood impliedly repealed because of the change in the circumstances which brought it into existence. The High Court has recorded a finding in this connection in favour of the Company.

Craies on Statute Law, seventh edition, has mentioned six different classes of enactments at pages 357-8 which are considered as having ceased to be in force,-

"1. Expired-that is, enactments which having been originally limited to endure only for a specified period by a distinct provision, have not been either perpetuated or kept in force by continuance, or which have merely had for their object the continuance of previous temporary enactments for periods now gone by effluxion of time;
2. Spent-that is, enactments spent or exhausted in operation by the accomplishment of the purposes for which they were passed, either at the moment of their first 741 taking effect or on the happening of some event or on the doing of some act authorised or required;
3. Repealed in general terms-that is, repealed by the operation of an enactment expressed only in general terms as distinguished from an enactment specifying the Acts on which it is to operate;
4. Virtually repealed-where an earlier enactment is inconsistent with, or is rendered nugatory by, a later one;
5. Superseded-where a later enactment effects the same purposes as an earlier one by repetition of its terms or otherwise;
6. Obsolete-where the state of things contemplated by the enactment has ceased to exist, or the enactment is of such a nature as to be no longer capable of being put in force, regard being had to the alteration of political or social circumstances."

These six have been mentioned as the enactments which are selected for inclusion in the Statute Law Revision Acts of England as having ceased to be in force otherwise than by express repeal, or having by lapse of time or otherwise become unnecessary. It is quite an exhaustive list and the question is whether the Order could be said to have "spent" itself or become "obsolete", for the other four categories are inapplicable to the present case. But whether a piece of legislation has spent itself or exhausted in operation by the accomplishment of the purpose for which it was passed, or whether the state of things contemplated by the enactment has ceased to exist, are essentially questions of fact for the Legislature to examine, and no vested right exists in a citizen to ask for a declaration that the law has been impliedly repealed on any such ground.

It has to be appreciated that the power to legislate is both positive in the sense of making a law, and negative in the sense of repealing a law or making it inoperative. In either case, it is a power of the Legislature, and should lie where it belongs. Any other view will be hazardous and may well be said to be an encroachment on the legislative field. In an extreme and a clear case, no doubt, an antiquated law may be said to have become obsolete-the more so if it is a penal law and has become incapable of user by a drastic change in the circumstances. But the judge of the change should be the Legislature, and courts are not expected to undertake that duty unless that becomes unavoidable and the circumstances are so apparent 742 as to lead to one and only one conclusion. This is equally so in regard to the delegated or subordinate legislation.

We have gone through the cases reported in Elwood Hamilton v. Kentucky Distilleries & Warehouse Co.,(1) Chastleton Corporation v. A. Leftwich Sinclair(2) and Nashville, Chattanooga & St. Louis Railway v. Herbert S. Walters(3) on which reliance has been placed by Mr. Ray, but they are of no real help to the Company. Thus in Elwood Hamilton(1) it has been held that it requires "a clear case"

to justify a court in declaring that a Federal Statute adopted to increase war efficiency has ceased to be valid, on the theory that the war emergency has passed and the power of Congress no longer exists. In Chastleton Corporation(2) it has been held that courts would pronounce on the continued operation of law upon facts which they "judicially know." We have also gone through Nashville(3) case where the view has been taken that a statute valid when enacted may become invalid by change in the conditions to which it is applied. We have gone through The petition of the Earl of Antrim and Eleven other Irish Peers(4) also where a declaration was asked for by some Irish Peers that the peerage of Ireland had in accordance with the provisions of the Union with Ireland Act, 1800, the right to be represented by 28 Lords temporal of Ireland for life. Their petition was rejected because the provisions of the Act of 1800 had ceased to be effective on the passing of the Irish Free State (Agreement) Act, 1922. That was therefore quite a different case. Mr. Ray has placed reliance on Pannalal Lahoti v. State of Hyderabad,(5) but what has been held there is that a temporary legislation cannot be allowed to outlast the war emergency which "brought it forth". In The Union of India v. Ram Kanwar and others(6) it was held that as the building in question was being used for a purpose other than that for which it was originally requisitioned under the law, it was liable to be de-requisitioned. The question is whether any such situation has been found to be established in the present case ?
Now what the High Court has found in this respect is as follows,-
"This Court finds that circumstances have materially changed since the impugned order was made. The shortage in reservoir from which water is drawn for the generation of 743 Hydro-electricity has ceased and further supplies of electrical energy are available from newly commissioned units. The respondents admit that fresh power connections have been given. In these circumstances, the continuance of the impugned order is no longer justified and consequently, the order must be held to have outlived the purpose for which it was made and, as such, it must be held to be no longer valid.' It has thus found three facts: (i) the shortage in the reservoir(s) for generation of hydel energy had ceased, (ii) further supply of energy was available from newly commissioned units, and (iii) fresh power connections had been given by the U.P.S.E.B. But what was lost sight of was the important fact that it was all along the case of the State that hydel energy was only one-third of the total generation, and that generation of thermal energy which met two-third of the total requirement had declined for reasons beyond the control of U.P.S.E.B. The High Court did not therefore undertake a careful examination of the facts, and took some new connections into consideration without attempting to examine their magnitude and effect on the over all generation and availability of energy from all the sources. The State has filed a detailed affidavit dated October 12, 1978, where it has been stated that the U.P.S.E.B. was at best capable of generating electrical energy to the "tune of 10,185 m u," whereas the total requirement of the State for 1978-79 was 13,866 m u so that there was a gap of 393 m u. The High Court therefore erred in taking the view that the continuance of the order was no longer justified.
Even so, the High Court abstained from striking down the whole of the Order and merely declared that the provisions of the first proviso to clause 6(a) (i) was ultra vires, and quashed it.
We have given our reasons for taking the view that the whole of clause 6(a) (i) of the order, including the proviso, is valid, and the question remains whether we should restore the quashed proviso. The answer to the question is simple. The learned Solicitor General has made a statement at the Bar that at present, or in the near future, there is no difficulty in supplying 42.5 m w energy to the Company, and that the Company is getting that much energy already. He has been frank enough to say that this will be so even if the proviso is restored by this Court. He has stated that the State Government has been reviewing the position from time to time, and has given the 744 assurance that it will continue to do so in future. He has also stated that although the application of the Company for grant of exemption under clause 10 of the Order had been rejected on December 9, 1977, there is nothing to prevent the Company from making a fresh application if it thinks that there is a real and substantial improvement in the generation of energy in the State. The fact therefore remains that, as things stand at present, the proviso, which admittedly applies only to the Company, is of no practical use for the time being. So even though it is valid and has wrongly been quashed by the High Court, we do not think it necessary to restore it, so that it shall not be deemed to form part of clause 6(a) (i) of the Order. But if there is deterioration in the generation of energy again, or there are other sufficient reasons within the purview of section 22B of the Act to reinsert the proviso, in the present or modified form, it will be permissible for the State Government to do so according to the law.
In the result, while C.A. No. 921 of 1978 is allowed to the extent mentioned above, C.A. No. 425 of 1979 fails and is dismissed. In the circumstances of the case, the parties shall pay and bear their own costs in both the appeals.
N.V.K.					C.A. 921/78 allowed.
				      C.A. 425/79 dismissed.
745