Section 10(7) in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2016

(7)The State Transmission Utility shall, in consultation with State Load Dispatch Centre, Transmission and Distribution Licensees and based on system studies by the concerned licensee or otherwise, assess the capacity available and communicate the decision to the applicant within 60 days of the receipt of the application.Provided that if, in the opinion of the State Transmission Utility, further system strengthening of transmission/distribution system is essential before providing long term open access, the State Transmission Utility shall intimate the cost estimates, likely completion schedule and estimated date from which open access shall be allowed after system strengthening within 90 days of the receipt of the application.Provided further that if system strengthening of network of Distribution Licensee is required, the cost estimate & likely completion schedule shall be intimated by Distribution Licensee to the STU within 45 days of receipt of application.