Section 134(d) in Bihar Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2005
(d)such casing and bracing are provided to a shaft at an excavation or tunnelling work upto the depth of such shaft at an excavation or tunnelling work according to the appropriate design for such casing and bracing;