State of Rajasthan - Subsection

Section 9(6) in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2016

(6)An applicant may be required to construct a dedicated line to the point of connection to enable connectivity to the grid, as decided by the State Transmission Utility or Distribution Licensee as the case may be.