Section 5(5)(c) in The Petroleum and Natural Gas Regulatory Board (Determining Capacity of Petroleum, Petroleum Products and Natural Gas Pipeline) Regulations, 2010
(c)In case the contractual pressure at any entry and exit point is within a band, the arithmetic mean rounded upto first decimal point shall be considered.