Item No. 02                                                 (Court No.1)

               BEFORE THE NATIONAL GREEN TRIBUNAL
                   PRINCIPAL BENCH, NEW DELHI

                            (By Video Conferencing)

                      Original Application No. 801/2018

                        (With report dated 16.06.2021)

Jasmeet Singh                                                 Applicant

                                     Versus

State of Himachal Pradesh                                  Respondent


Date of hearing:    23.06.2021

CORAM: HON'BLE MR. JUSTICE ADARSH KUMAR GOEL, CHAIRPERSON
       HON'BLE MR. JUSTICE SUDHIR AGARWAL, JUDICIAL MEMBER
       HON'BLE MR. JUSTICE M. SATHYANARAYANAN, JUDICIAL MEMBER
       HON'BLE MR. JUSTICE BRIJESH SETHI, JUDICIAL MEMBER
       HON'BLE DR. NAGIN NANDA, EXPERT MEMBER


Respondent:   Mr. Nalin Kohli, Advocate for HPSPCB



                                     ORDER

1. The issue for consideration is the remedial action against pollution of River Balad in Baddi industrial area in District Solan, on account of leakage from the Common Effluent Treatment Plant (CETP).

2. The matter was considered on several occasions earlier. On 14.01.2020, the Tribunal considered the report dated 06.11.2019 filed by the State PCB to the effect that violation of provisions of the Water (Prevention and Control of Pollution) Act, 1974 was taking place by discharge of polluted effluents in the water bodies. The same is reproduced below for ready reference:-

"2.0 Inspection of CETP Baddi
i) The CETP is designed to treat five different categories of effluent as tabulated under 1 Sr. Category Sector of No of Units Consented No. Industry effluent quantity (in MLD)
1. I Food, Paper and 89 15.55 Textile
2. II Soap & Detergent 112 2.0
3. III Pharmaceutical 213 2.9
4. IV Dyeing 4* 2.0 M/s Auro Textile Unit - I, M/s Auro Dyeing Unit - I, M/s Winsome Textile Industries
5. V Electroplating, 31 0.042 Metal surface finishing Total 449 22.492 Say 23.00
ii) It was observed that at an average of 17 mld effluent is treated by the CETP, comprising equalization tank, primary settler, aeration tank, reaction tank, secondary and tertiary clarifier. The treatment process for each stream is appended with the report (Annexure IV).
iii) It was noticed that effluent of category IV is not reaching to its designated equalization tank. M/s Baddi Infrastructure Ltd., has informed that the dedicated pipe network to carry the effluent of category IV is blocked. The effluent of category IV is therefore being discharged through pipe network of Category I.
iv) It is also observed that the CETP is designed to treat category V effluent by mixing with category IV effluent to optimize the chemical consumption and to achieve effective treatment. Since, the effluent of category IV has been mixed with category-I, in the pipe network itself before reaching CETP, which has resulted in formation of a new complex effluent for which the CETP was not designed. Therefore, it could not able to deliver the desired results w.r.t. treatment and thus, effluents was in non-conformity with the standards, as per the monitoring results of HPPCB (Annexure-V). Besides, the effluent of category V remained effectively untreated throughout the CETP process.
v) The performance of CETP is being regularly monitored by HPPCB. The monitoring data (Annexure-V) indicate that the performance of the CETP is far from satisfactory for having not met the discharged standards. The data reveal that effluent quality does not conform the standards of Chloride (limit of 2 1100 mg/1 max.), Total dissolved Solids (TDS) (LIMIT OF 2100 MG/1 Mmax.) and Biochemical Oxygen Demand (BOD) (limit of 30 mg/1 max.).
vi) The CETP has provided online continuous effluent monitoring system for pH, Total Suspended Solids (TDS), Chemical Oxygen Demand (COD) and Total Organic Content (TOC) and data so recorded are linked with the server of HPPCB and CPCB.

While collecting the sample from the final outlet of tertiary clarifier and discharge point at River Sirsa, difference in colour of effluent was observed. The sample collected from the discharge point was lighter in colour than that of outlet of tertiary clarifier; giving rise to possibility of dilution. (Photograph: Plate-I)

vii) The Committee also recorded that the Textile Units, which are generating the effluent of Category IV, were earlier operating their own effluent treatment plants prior to commencement of CETP and found it viable to operate due to their scale of production.

viii) The designed treatment criteria of CETP are to treat effluent, stream-wise, following segregation at source, effluent of Category-I is mixed with Category-IV, resulted in alternation of criteria, hence treated effluent.

ix) For increasing the connectivity, the CETP has proposed of laying conveyance (pipeline) for a total length of 5.8 kms. The status is as under.


  Sr.         Location         Stretch in Status   of Remarks
  No.                          meters     permission
                                          obtained

  1.          Zydus         1655             Permission Work       has
              Cadilla    to                  granted by been awarded
              Legacy Food                    HPPWD      by M/s Baddi
              on      Baddi                             Infrastructure
              Barotiwala                                Ltd vide letter
              road                                      dated 27-09-
                                                        2019.
                                                        (Annexure-VI)

  2.          Maplur-Baddi 2250              Permission
              electrical                     not granted
              substation                     by NHAI
              upto     Bhud
              near Maxtar
              Bio     Genics
              Company

  3.          Bhud to Lehi     1900          Permission
                                             granted by
                                             HPWD

      Total                    5805




                                                                          3

To safeguard the interest of environment from being deteriorated further and having understanding of pollution problem, its cause and remedial measures, the Committee recommends following:

i) Textile industries (SI. No.1 to 5, Table 1) engaged in dyeing-process generating effluent of Category-IV, as mentioned above for the purpose of designing and operating CETP, should stop its operations with immediate effect, until and unless the dedicated conduits supposed to carry the said effluent, is brought to back functional.
ii) These units shall resume operation of their ETP to impart effective treatment on effluent of Category-IV so as to meet the standards and shall pump treated effluent to the pipe network designated to carry effluent of Category-I for further treatment at CETP.
iii) These units shall resume operations only upon satisfactory performance of ETP which was brought back to functional and shall be monitored once in a month by HPCB.
iv) M/s Baddi Infrastructure including Ltd. is to ensure proper maintenance of CETP and its infrastructure including pipe network designed to receive effluents from member industrial units. M/s Baddi Infrastructure Ltd. has to ensure operation of CETP as per the defined protocol and in accordance to standard operating practice which is in place. In case, any variation (beyond the designed criteria) of effluent quality is noticed by CETP the same shall be brought to the knowledge of SPCB, in writing. The SPCB shall acknowledge the communications and shall act to identify the cause for taking all necessary steps for taking all necessary steps to eliminate/minimize such variation.
v) M/s Baddi Infrastructure Ltd. has to install activated carbon, pressure sand filters and ozonizer before the treated effluent is discharged. This refers the Detailed Project Report of CETP-Baddi, which finds mentioned of the system but has not been provided by M/s Baddi Infrastructure Limited.

Reference is made on the observations recorded by the Committee constituted by Hon'ble Tribunal in O.A. No.916/2018 in the matter of Sobha Singh and Others v/s State of Punjab and Others, wherein the Committee recommended that Rs.1.0 crore to be levied on CETP-Baddi as Environmental Compensation for untreated effluent discharged into River Sirsa. The CETP discharged, joining the river, has failed to meet Bio-assay Test (Toxicity on fish: 0% survival with 100% effluent for 96 hours). This would have caused impact on water and land (soil) environment, plants and vegetation, aquatic life and human health all along downstream of CETP-Baddi.

4

Thus, Committee also recommends the following:-

vi) Environmental compensation (EC) to be levied to CETP-Baddi (M/s Baddi Infrastructure Ltd) for not having done effluent treatment upto the standards and to those Textile Industries (dyeing units) responsible for making CETP defunct. The EC would be proportionate as under.
a) CETP-Baddi has to pay environmental Compensation t the tune of Rs.1.91 Crores for non-compliance of discharged standards, estimated based on violation recorded by HPPCB over last one and half year [19.10.2017 -

01.11.2019] (Annexure VII) including compensation to the tune of Rs.87.9 Lakh imposed by HPSPCB dated 15.10.2019 over one year [20.11.2018 to 09.09.2019] ( annexure VIII).

b) Textile Industries (dyeing units) are to pay establishment cost of CETP and cost of pipe network which was brought to state of irreparable.

vii) HPPCB is to review the notification, dated 17.03.2018 wherein Total Suspended Solids (TSS), Oil & Grease and pH have been notified TDS, BOD, Chloride and Sulphide may also be considered for inclusion in the notification as these have critical bearing on operation and performance of CETP designed to impart effective treatment. HPPCB may undertake similar exercise as done in case of notification, dated 29.06.2019 for CETP Paonta Sahib, wherein eight parameters including those referred here, have been considered. Such notification may be issued in consultation with CPCB.

viii) For optimal performance of CETP-Baddi, HPPCB is to ensure regulating and monitoring mechanism be in place by asking all member units (falling under red category) of CETP to install online continuous effluent monitoring system. The data so recorded shall be made available on SPCB and CPCB server for effective control."

3. The matter was then considered on 18.06.2020 in the light of compliance report dated 11.06.2020 filed by the State PCB. It was observed:

" xxx xxx xxx

5. In pursuance of above, the State PCB has filed a 'compliance report' dated 11.06.2020 to the effect that the units gave action plans which are not satisfactory as long timeline have been prescribed.

6. We do not find the report to be as per the mandate of law. If the pollution is continuing, the State PCB is under obligation to close the polluting activities by exercising its jurisdiction 5 under the Water Act, 1974 and recover compensation from the polluters. Till pollution is stopped, polluting activities, which are punishable crime under the law, cannot continue. The State PCB has failed to take action merely on the ground that action plan was being prepared or had been prepared which was not satisfactory. None appears for the State PCB."

4. The matter was last considered on 04.01.2021 in the light of the report of the State PCB dated 01.01.2021 mentioning the steps taken for closure and recovery of compensation. The Tribunal found that the action taken was not adequate as CETP was still non-compliant.

Untreated effluents were thus being discharged into the water bodies in violation of law. Discussion and direction in the said order are reproduced below:-

"1to3....xxx.................................xxx...................................xxx
4. Accordingly, the State PCB has filed its report on 01.01.2021. It mentions that the State PCB issued show cause notice dated 23.06.2020 to the concerned textile units for closure and recovery of compensation against which writ petitions were filed before the Himachal Pradesh High Court. The High Court, vide order dated 22.07.2020, directed that the matter be heard by the Principal Secretary, Environment and fresh order passed. The Principal Secretary, Environment passed further order on 30.12.2020 directing the State PCB to take action for enforcement of law since violation of law was established. The Principal Secretary, Environment held:
"xxx xxx xxx ..... But this fact cannot be ignored that effluent discharge, FDS in particular, by these units is beyond the prescribed limits which is contributing to pollution. In the light of this discussion, I am of considered view that, keeping in view the above position, SPCB may take action strictly according to the provisions of Law and rules applicable in this case. ......"

5. The State PCB accordingly issued fresh show cause notice on 28.12.2020 and passed further order dated 01.01.2021 as follows:

"xxx xxx xxx Whereas, the effluent of category-IV being contributed by the unit M/s Auro Textiles, Sai Road Baddi, Distt. Solan, H.P to the CETP for final disposal and treatment by unit is not complying since 25-7-2020 till date to the discharge standards as prescribed in the schedule-1 of 6 EP Rules, 1986 as well as the inlet quality standards notified by the State Government and thereby causing water pollution.

xx xx xx Now, therefore, in consideration of the facts stated above, in view of the directions of Hon'ble High Courts orders, Hon'ble NGT and the orders passed by Principal Secretary (Env, S&T) Govt of HP and in exercise of the powers conferred under section 32 and 33-A of Water (Prevention & Control of Pollution) Act, 1974 M/s Auro Textiles, Sai Road Baddi, Distt. Solan, H.P. is hereby directed to:

1. Immediately shut down the dyeing process of the textile unit contributing towards the category- IV effluent to CETP, Baddi, till the unit becomes compliant.
2. Pay Environment Compensation to the tune of Rs. 42 lakhs (Forty Two Lakhs only) for the violation period w.e.f. 25-07-

2020 to 31-12-2020 (140 days excluding the period of compliance)."

Identical orders are said to have been passed against four textile units.

6. We have heard Shri Nalin Kohli, learned Counsel appearing for the State PCB.

7. We find that though in the show cause notice the State PCB proposed disconnecting power supply, this direction has not been given in the final order. We also find that the CETP has still not complied with the environmental norms for which remedial action needs to be taken by the State PCB, by improving quality and reducing the load of inlet so as to be consistent with the designed capacity of the CETP or closing such units contributing to the waste for which the CETP is not designed till the concerned units make their own arrangement for treating the effluents. The member industries may be considered non-compliant, if they do not undertake primary treatment as per EC conditions of the CETP. The industries having effluent generation more than 200 KLD may be directed to treat the effluents and recycle/reuse to the maximum extent and also reducing the FDS. Wherever required, water audit of red category non-compliant units be conducted. The requisite pipeline may also be required to be constructed by the CETP to carry the waste.

8. Let further progress report be filed before the next date by e- mail at [email protected] preferably in the form of searchable PDF/OCR Support PDF and not in the form of Image PDF."

5. The State PCB has filed interim report dated 06.05.2021 followed by further report dated 16.06.2021. It will suffice to refer to the last report to the effect that the samples were taken and were not found to be 7 within the limits. The State PCB gave directions to the concerned industries. While some units have achieved the norms, further action is being taken in the matter. The status as mentioned in the report is reproduced below:-

"In compliance to afore-cited order dated 04-01-2021 it is submitted that earlier the State Board had filed an Interim Report vide letter No. PCB/OA No. 801/2018 /-1549 dated 6-5- 2021 wherein it was submitted that Board has taken steps to make the CETP, Baddi compliant. The FDS level was found 2364mg/Itr as per sampling conducted at that time, though not within the prescribed limits. It is further submitted that now the latest sample taken on 21-5-2021 and 7- 6-2021 has been found within the prescribed limits w.r.t. FDS as the same has been reduced to the 2019mg/Itr and 2072 mg/ltr respectively. The sampling chart of the CETP Baddi is annexed as Annexure --A which reveals that there is continuous improvement and now the analysis results of latest sample taken are meeting the norms w.r.t. FDS.
It is further submitted that as regard to the issue of industries having effluent generation of more than 200 KLD, the State Board had identified and issued directions to 16 numbers of industries to operate their treatment plants i.e. primary, secondary and tertiary treatment system for the effluent treatment as per Environment Conditions of CETP and also directed to recycle / reuse to the maximum extent and also to reduce the FDS. Now as per report received from the Regional Office Baddi, these 16 units are operating the effluent treatment plants prior to their effluent discharge to CETP. The State Board has conducted inspection and sampling of these 16 units. The earlier results of sampling conducted on 21-1- 2021, 29-1-2021,1- 3-2021, 23-3-2021 and 16-4-2021, were found within limits (except of three units of M/s Vardhman and one unit of Winsome Textile) which has already been placed on record alongwith interim report dated 6-5-2021. However, the latest results of sampling conducted on 21-5-2021 the results of three units namely M/s P&G Home Products Baddi, M/s Torrent Pharmaceutical Ltd. Baddi and M/s Abbott Health care, Baddi were found above the prescribed limits for which notices dated 16-6-2021 has been issued to these units. Copy of sample results and notices issued are annexed as Annexure-B and Annexure-C (colly). The sample results of other units were found within the prescribed limits. It is further submitted that as reported by Regional Officer, Baddi the member industries having flow less than 200 KLD are disposing off their effluent to CETP, Baddi after primary treatment.
As regard to the compliance by the four textile units namely Auro Textile, Auro Textile unit --II, Auro Dyeing of Vardhman Textile and one unit of Winsome Textile, it is submitted that as per report received from the Regional Office, Baddi, the work of installation of advance treatment system by M/s Vardhman textile to reduce FDS is under progress and Reverse Osmosis system of capacity of 2 MLD shall be operational by 30-6-2021. In addition to Reverse Osmosis, M/s Vardhman Textile is also 8 installing the Multi Effect Evaporator of capacity of 370 KLD. As regard to progress of installation of advance treatment system by M/s Winsome Textile it is submitted that as per report received from Regional Office, Baddi the unit has completed the civil construction work. The installation of Reverse Osmosis system and other components is under progress. Copies of progress report of these textile units received from Regional Office are annexed as Annexure D and E. The latest sample results of these four textile units are still not meeting the norms. Sample results are annexed as Annexure-F. As already submitted in interim progress report dated 6-5-2021, it is again submitted here that State Board had issued directions on 1-1-2021 to these four textile units under section 33-A of Water Act, 1974 for closure and levied Environmental Compensation which were challenged by these units before the Hon'ble High Court of HP vide CWP No. 414/2021, 416/2021 417/2021 and 418/2021. The Hon'ble High Court of HP vide order dated 11-1-2021 and 15-3-2021 has stayed the operation of the directions issued by the State Board and the matter is still pending before the Hon'ble High Court of Himachal Pradesh for adjudication. Copies of order dated 15-3-2021 are annexed as Annexure-G. It is further submitted that due to constant efforts of all stakeholders, the two consecutive latest samples of CETP outlet are meeting the norms prescribed by the MoEF &CC vide notification dated 1-1-2016. In future, the State Board shall continue to make all efforts in form of surveillance, regular monitoring and regulation on the CETP and member industries, so that the CETP remains compliant in future as well."

6. From the above, it is clear that violations are still continuing. Stay of order of closure and assessment of compensation for the past violations does not justify inaction for failure to take action for further violations after the order of stay and to initiate prosecution of the industrial units in question, including their Owners/Directors and the CETP operators. We also find that merely keeping an eye on units discharging more than 200 KLD is not enough. Violation by those discharging less than 200 KLD is not less serious violation nor less harmful for the environment and public health.

7. Accordingly, let further remedial action be taken to enforce the environmental rule of law in the interest of protection of environment and public health and a report of status of compliance filed after inspection 9 by a four Member joint Committee comprising a representative of MoEF&CC, CPCB, State PCB and District Magistrate, Solan by e-mail at [email protected] preferably in the form of searchable PDF/ OCR Support PDF and not in the form of Image PDF. The State PCB will be the nodal agency for coordination and compliance.

List for further consideration on 05.10.2021.

A copy of this order be forwarded to the MoEF&CC, CPCB, State PCB and District Magistrate, Solan by e-mail for compliance.