Section 4(1)(iv) in The Petroleum and Natural Gas Regulatory Board (Code of Practice for Quality of Service for City or Local Natural Gas Distribution Networks) Regulations, 2010
(iv)provide connection within three months from the receipt of completed application form provided the consumer is located within the charge area indicated in the approved network plan of the entity and required permission are obtained: