Section 304(3) in The City of Nagpur Corporation Act, 1948
(3)The [Commissioner] may, without notice -(a)cause the soil or pavement or any wall, fence, post, chain or other material forming part of the street to be restored to the condition it was in before any opening or breaking up or displacement or alteration or damage made or done without the permission of the authority specified in sub-section (1);(b)cause to be removed any building materials, or any scaffold or any temporary erection, or any posts, bars, rails, boards or other things by way of enclosure, which have been deposited or set up in any street or in any open space vested in the Corporation without any permission of the authority specified in sub-section (1), or which, having been deposited or set up with such permission, have not been removed within the period specified in the notice issued under sub-section (2) and recover the costs of such restoration or removal from the offender.