Section 2E in Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019
2E. In case breakup is not available for 2.1 to 2.5, consolidated statement needs to be submitted.
Part-I Form-1(I)Name of the Petitioner ____________________________________Name of the Generating Station: ____________________________________Statement showing claimed capital cost (A+B)| S. No. | Particulars | 2019-20 | 2020-21 | 2021-22 | 2022-23 | 2023-24 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 1 | Opening Capital Cost | |||||
| 2 | Add: Addition during the year/period | |||||
| 3 | Less: De-capitalisation during the year/period | |||||
| 4 | Less: Reversal during the year / period | |||||
| 5 | Add: Discharges during the year/ period | |||||
| 6 | Closing Capital Cost | |||||
| 7 | Average Capital Cost |
| S. No. | Particulars | 2019-20 | 2020-21 | 2021-22 | 2022-23 | 2023-24 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 1 | Opening Capital Cost | |||||
| 2 | Add: Addition during the year/period | |||||
| 3 | Less: De-capitalisation during the year/period | |||||
| 4 | Less: Reversal during the year / period | |||||
| 5 | Add: Discharges during the year/ period | |||||
| 6 | Closing Capital Cost | |||||
| 7 | Average Capital Cost |
| S. No. | Particulars | 2019-20 | 2020-21 | 2021-22 | 2022-23 | 2023-24 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 1 | Opening Capital Cost | |||||
| 2 | Add: Addition during the year/period | |||||
| 3 | Less: De-capitalisation during the year/period | |||||
| 4 | Less: Reversal during the year / period | |||||
| 5 | Add: Discharges during the year/ period | |||||
| 6 | Closing Capital Cost | |||||
| 7 | Average Capital Cost |
| Sr | Particulars | 2019-20 | 2020-21 | 2021-22 | 2022-23 | 2023-24 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Return on Equity | ||||||
| 1 | Gross Opening Equity (Normal) | |||||
| 2 | Less: Adjustment in Opening Equity | |||||
| 3 | Adjustment during the year | |||||
| 4 | Net Opening Equity (Normal) | |||||
| 5 | Add: Increase in equity due to addition duringthe year / period | |||||
| 7 | Less: Decrease due to De-capitalisation duringthe year / period | |||||
| 8 | Less: Decrease due to reversal during the year /period | |||||
| 9 | Add: Increase due to discharges during the year/ period | |||||
| 10 | Net closing Equity (Normal) | |||||
| 11 | Average Equity (Normal) | |||||
| 12 | Rate of ROE | |||||
| 12 | Total ROE |
| Sr | Particulars | 2019-20 | 2020-21 | 2021-22 | 2022-23 | 2023-24 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Return on Equity (beyond the original scopeof work excluding additional capitalization due to change in Law) | ||||||
| 1 | Gross Opening Equity (Normal) | |||||
| 2 | Less: Adjustment in Opening Equity | |||||
| 3 | Adjustment during the year | |||||
| 4 | Net Opening Equity (Normal) | |||||
| 5 | Add: Increase in equity due to addition duringthe year / period | |||||
| 7 | Less: Decrease due to De-capitalisation duringthe year / period | |||||
| 8 | Less: Decrease due to reversal during the year /period | |||||
| 9 | Add: Increase due to discharges during the year/ period | |||||
| 10 | Net closing Equity (Normal) | |||||
| 11 | Average Equity (Normal) | |||||
| 12 | Rate of ROE | |||||
| 12 | Total ROE |
| Unit(s)/Block(s)/Parameters | Unit-I | Unit-II | Unit-III | …. | ||
| Installed Capacity ( MW) | ||||||
| Schedule COD as per Investment Approval | ||||||
| Actual COD /Date of Taken Over (as applicable) | ||||||
| Pit Head or Non Pit Head | ||||||
| Name of the Boiler Manufacture | ||||||
| Name of Turbine Generator Manufacture | ||||||
| Main Steams Pressure at Turbine inlet (kg/Cm2)abs1. | ||||||
| Main Steam Temperature at Turbine inlet (oC) 1 | ||||||
| Reheat Steam Pressure at Turbine inlet (kg/Cm2)1 | ||||||
| Reheat Steam Temperature at Turbine inlet (oC)1 | ||||||
| Main Steam flow at Turbine inlet under MCRcondition (tons /hr)1 | ||||||
| Main Steam flow at Turbine inlet under VWOcondition (tons /hr)2 | ||||||
| Unit Gross electrical output under MCR /Ratedcondition (MW)2 | ||||||
| Unit Gross electrical output under VWO condition(MW)2 | ||||||
| Guaranteed Design Gross Turbine Cycle Heat Rate(kCal/kWh)3 | ||||||
| Conditions on which design turbine cycle heatrate guaranteed | ||||||
| % MCR | ||||||
| % Makeup Water Consumption | ||||||
| Design Capacity of Make up Water System | ||||||
| Design Capacity of Inlet Cooling System |
| Unit(s)/Block(s)/Parameters | Unit-I | Unit-II | Unit-III | .... | ||
| Design Cooling Water Temperature (0C) | ||||||
| Back Pressure | ||||||
| Steam flow at super heater outlet under BMCRcondition (tons/hr) | ||||||
| Steam Pressure at super heater outlet under BMCRcondition) (kg/Cm2) | ||||||
| Steam Temperature at super heater outlet underBMCR condition (0C) | ||||||
| Steam Temperature at Reheater outlet at BMCRcondition (0C) | ||||||
| Design / Guaranteed Boiler Efficiency (%)4 | ||||||
| Design Fuel with and without Blending ofdomestic/imported coal | ||||||
| Type of Cooling Tower | ||||||
| Type of cooling system5 | ||||||
| Type of Boiler Feed Pump6 | ||||||
| Type of Coal Mill | ||||||
| Fuel Details7 | ||||||
| -Primary Fuel | ||||||
| -Secondary Fuel | ||||||
| -Alternate Fuels | ||||||
| Types of SOX control system | ||||||
| Types of NOX control system | ||||||
| Details of SPM control system | ||||||
| Special Features/Site Specific Features8 | ||||||
| Special Technological Features9 | ||||||
| Environmental Regulation related features10 | ||||||
| Any other special features |
| Unit(s)/Block(s)/Parameters | Unit-I | Unit-II | Unit-III | .... | ||
| 1. At Turbine MCR condition. | ||||||
| 2. With 0% (Nil) make up and design Coolingwater temperature | ||||||
| 3. At TMCR output based on gross generation, 0%(Nil) makeup and design Cooling water temperature. | ||||||
| 4. With Performance coal based on Higher HeatingValue (HHV) of fuel and at BMCR) out put | ||||||
| 5. Closed circuit cooling, once through cooling,sea cooling, natural draft cooling, induced draft cooling etc. | ||||||
| 6. Motor driven, Steam turbine driven etc. | ||||||
| 7. Coal or natural gas or Naptha or lignite etc. | ||||||
| 8. Any site specific feature such asMerry-Go-Round, Vicinity to sea, Intake /makeup water systemsetc. scrubbers etc. Specify all such features | ||||||
| 9. Any Special Technological feature likeAdvanced class FA technology in Gas Turbines, etc. | ||||||
| 10. Environmental Regulation related featureslike FGD, ESP etc., | ||||||
| Note 1: In case of deviation from specifiedconditions in Regulation, correction curve of manufacturer mayalso be submitted. | ||||||
| Note 2: Heat Balance Diagram has to be submittedalong with above information in case of new stations. | ||||||