Section 23A(1)(b) in The Orissa Irrigation Rules, 1961
(b)[ the Executive Engineer shall order installation of a Flow Meter or a suitable measuring device within the period as stipulated by him not being less than thirty days from the date of such order at the cost of the concerned industrial/commercial establishment to measure the quantum of water to be drawn from the water source and the Flow Meter/measuring device shall be installed under the direct supervision of the Executive Engineer or under the supervision of an Engineer not below the rank of an Assistant Engineer to be specifically nominated by him, failing which the water-supply shall not be made or shall be discontinued by him after giving seven days' notice;] [Substituted vide O.G.E.No. 1423 Notification No. 51010-IIIW-Legislative 39/99,- R, dated 29.9.1999.]