Section 111(6) in The Petroleum And Natural Gas (Safety In Offshore Operations) Rules, 2008
(6)There shall be a provision to activate functions manually from the central control room in such a manner that the facility is brought to a safe condition in the event of failure in the programmable parts of the system.