Section 26(3) in The Jammu and Kashmir Electricity Act, 1997 (1940 A.D.)

(3)Where the meter is property of the consumer, he shall keep the meter correct, and, in default of his doing so, the licensee may, after giving him seven days notice, for so long as the default continues, cease to supply energy through the meter.