Section 5(4)(e) in Orissa Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulation, 2004
(e)The power purchase expenses as determined through such optimal merit order dispatch after due consideration for contractual obligations and technical constraints, shall be considered for pass through in the Revenue requirement.