Section 49 in The Maharashtra Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2005
49. Norms for operation.
- 49.1 Target availability for full recovery of annual transmission charges| (a) | AC system :- | 98 per cent |
| (b) | HVDC bi-pole links and HVDC back-to-back stations :- | 95 per cent |