State of Rajasthan - Subsection

Section 13(2) in Rajasthan Electricity Regulatory Commission (tariff for Captive Power Plants) Regulations, 2007

(2)In case, CPP and its industrial unit are located within the same premises (i.e embedded CPP) then there should be adequate arrangement of separate metering system for CPP and its industrial unit, if industrial unit is also a consumer of the licensee and there is sale of power by the CPP through the grid.