Supreme Court of India

Board Of Trustees Of The Port Of Bombay vs Jai Hind Oil Mills Company And Others on 9 January, 1987

Equivalent citations: 1987 AIR 622, 1987 SCR (1) 932, AIR 1987 SUPREME COURT 622, (1987) 1 JT 110 (SC), 1987 2 UJ (SC) 154, 1987 (1) SCC 648, (1987) 2 BOM CR 594, (1987) 30 ELT 633, (1987) 12 ECC 209, (1987) 13 ECR 211, (1987) 1 SCJ 378

Author: E.S. Venkataramiah

Bench: E.S. Venkataramiah, K.N. Singh

           PETITIONER:
BOARD OF TRUSTEES OF THE PORT OF BOMBAY

	Vs.

RESPONDENT:
JAI HIND OIL MILLS COMPANY AND OTHERS

DATE OF JUDGMENT09/01/1987

BENCH:
VENKATARAMIAH, E.S. (J)
BENCH:
VENKATARAMIAH, E.S. (J)
SINGH, K.N. (J)

CITATION:
 1987 AIR  622		  1987 SCR  (1) 932
 1987 SCC  (1) 648	  JT 1987 (1)	110
 1987 SCALE  (1)22
 CITATOR INFO :
 RF	    1991 SC1243	 (4)


ACT:
    Major Port Trusts Act, 1963: Sections 5,48 to 65. Bombay
Customs	 House	Public Notice No. 111 dated July  29,  1985;
Paragraph 2(a).
    Goods  detained  by	 Customs  House	 at  Port--Clearance
of--Demurrage  charges levied by Port  Trust--Necessity	 for
Court to ensure payment.



HEADNOTE:
    The	 Major Port Trusts Act, 1963 empowers by  cl.(d)  of
s.48  the Board of Trustees, constituted under that Art,  to
impose rates in respea of wharfage, storage or demurrage  of
goods at the port. Section 53 of the Act empowers and  Board
in  special cases to exempt either wholly or partially	any'
goods from payment of any rate or of any charge leviable  in
respect	 thereof or remit the whole or any portion  of	such
rate or charge so levied. The Port Trust had in consultation
with  the Customs authorities provided for grant of  conces-
sion  in the matter of payment of demurrage charges  on	 the
issue of detention certificate by the latter.
    Paragraph 2(a) of the Bombay Customs House Public Notice
No. 111 dated 29th July, 1985 provides for a regular  deten-
tion  certificate to be issued where the goods are  detained
by  the Customs House for the bona fide operation of  import
control formalities.
    A  dispute	arose  between the 1st	respondent  and	 the
Customs	 authorities with regard to the basic  customs	duty
payable	 on the goods imported by the former. By an  interim
order passed in a writ petition filed by the respondent, the
High Court directed the Customs authorities to allow  clear-
ance  of  the consignments on respondent furnishing  a	bank
guarantee in respect of the disputed amount of duty payable,
in  favour  of	the Collector of  Customs.  The	 respondent,
however, failed to clear the goods from the Port.
    Since  the	consignments were  incurring  demurrage	 the
respondent  filed another writ petition seeking a  direction
to the Customs authorities
933
to  issue detention certificates, which was allowed  by	 the
Court  on the 1st respondent giving an undertaking  that  it
would  pay the demurrage amount if it failed in the  earlier
writ  petition. The Customs authorities were, thus,  obliged
to issue the detention certificates.
    The	 Port  Trust was not made party to any of  the	writ
petitions.  It refused to honour the detention	certificates
and  to grant remission of demurrage unless  the  respondent
gave  a bank guarantee to the extent of 80 per cent  of	 the
fees claimed. The High Court, however, by an interim  order,
in the writ petition filed against the Port Trust,  directed
the  clearance	of goods without payment  of  demurrage	 and
without	 insisting on the bank guarantee. The appeals  filed
against the aforesaid orders were summarily dismissed by the
High Court.
    In	the appeals by special leave, it was  contended	 for
the appellantPort Trust, that the High Court should not have
directed the Customs authorities to issue detention certifi-
cates without the Port Trust being made a party to the	writ
petition  and  in any event without passing  an	 order	duly
providing  for	the payment of the  wharfage  and  demurrage
charges	 due  to the Port Trust in the event  of  the  first
respondent  failing  in its contention, and  that  the	High
Court had committed an error in directing the first respond-
ent to give a bank guarantee only in respect of the  customs
duty  payable and not making a similar order with regard  to
wharfage and demurrage charges payable to the Port Trust.
Disposing of the appeals, the Court,
    HELD:  1.  The power of the Port Trust to fix  rates  of
demurrage  and to recover the same from an importer  and  to
show  concession  as regards demurrage	charges	 in  certain
specified cases has been recognised. [942F-G]
    Trustees of the Port of Madras v. M/s. Aminchand  Pyare-
lal & Others, [1976] 1 SCR 721 and The Board of trustees  of
the Port of  Bombay v. Indian Goods Supplying Co., [1977]  3
SCR 343, referred to.
    2.1 The orders passed by the High Court in the  proceed-
ings  to  which	 the Port Trust was not a  party,  were	 not
binding	 on the Port Trust in view of the violation  of	 the
principles of natural justice. [943G-H]
    2.2	 The Port Trust being a body  corporate	 constituted
under  Major Port Trusts Act, 1963 was entitled to he  heard
by the Court
934
before any order which affected its interests  prejudicially
was passed. The High Court, therefore, before compelling the
Customs authorities to issue a detention certificate  should
have  issued  notice to the Port Trust. This  was  necessary
because on the production of that certificate the Port Trust
was under on obligation to permit the clearance of the goods
without payment of full demurrage charges. If ultimately the
party  concerned was found to he at fault and become  liable
to  pay	 the full demurrage charges the Port  Trust  in	 the
absence	 of a bank guarantee would not be in a	position  to
recover	 full  demurrage charges from  the  party  concerned
since  it would have no longer any lien as provided by	s.59
of the Act on the goods which were already cleared. [943D-F]
    3.	The orders of the High Court in the  proceedings  to
which the Port Trust was a party were contrary to the public
notice	issued	by the Customs authorities as  well  as	 the
rules of the Port Trust. It erred in not imposing any condi-
tion on the first respondent for protecting the interests of
the Port Trust. It should have directed the first respondent
to  furnish  bank  guarantee in	 respect  of  the  demurrage
charges payable to the Port Trust in the event of the  first
respondent  being held to be in default	 ultimately,  rather
than  merely directing an undertaking to be given in  favour
of the High Court. [943B-D]
    4. The goods having already been cleared, to protect the
interests of the Port Trust the order passed on December I6,
1986 directing the first respondent to furnish bank  guaran-
tee in favour of the appellant with regard to the balance of
wharfage and demurrage charges and in default thereof to pay
the  amount in cash would be the final order in the  matter.
The  customs authorities to complete the  adjudication	pro-
ceedings expeditiously and within March 16, 1987. [944B-E]



JUDGMENT:

CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 4483 & 4484 of 1986 From the Judgment and Order dated 26.6.86 of the Bombay High Court in Notice of Motion No. 1418/86 in Appeal No. 512/86 in W.P. 1007/86.

F.S. Nariman, O. Chenoy, A.K. Verma, D.N. Mishra and D.N. Bhansaria for the Appellant.

Soli J. Sorabjee, M.M. Jayakar and B.R. Aggarwala for the Respondents.

935

The Judgment of the Court was delivered by VENKATARAMIAH, J. These appeals by special leave are filed against the Order dated 26.6.1986 passed in Appeal No. 512 of 1986 in Writ Petition No. 1007 of 1986 and the Order dated 26.6.1986 in Appeal No. 535 of 1986 in Writ Petition No. 1424 of 1986 of the High Court of Bombay. Since these two are connected matters, they are disposed of by this common judgment.

The facts of these two cases are these. The appellant in both these appeals is the Board of Trustees of the Port of Bombay (hereinafter referred to as 'the Port Trust') and the 1st Respondent in both these appeals is a partnership firm by name M/s. Jai Hind Oil Mills Company. The 1st Respondent imported 5 consignments of Propylene of 10 metric tons each in January, 1986 by S.S. Maribor. The general landing date of the said consignments was 20th January, 1986 and the last free date in respect of them was 23rd January, 1986. There- after the said consignments were incurring demurrage. The bills of entry were submitted by the 1st Respondent to the Customs authorities in the same month. Disputes arose be- tween the 1st Respondent and the Customs authorities with regard to the basic customs duty payable in excess of 32.50% (as goods were imported from the Republic of Korea which was a developing country), with regard to loading the assessable value with customs duty for calculation of the additional duty and with regard to loading the CIF value with the landing charges. Not being satisfied with the contentions of the Customs authorities the 1st Respondent filed a writ petition in Writ Petition No. 122 of 1986 for the issue of certain directions to the Customs authorities with regard to the levy of customs duty. In that Writ Petition on January 21, 1986 the High Court passed an interim order which di- rected the Customs authorities not to insist on payment of the customs duty in dispute pending hearing and disposal of the Writ Petition on the 1st Respondent furnishing a Bank Guarantee to the extent of the 90 per cent of the disputed amount of duty in respect of one item and 100 per cent of the disputed amount of duty in respect of two other items in favour of the Collector of Customs. Thereafter some corre- spondence ensued between the 1st Respondent and the Customs authorities in connection with the description of the above goods. It would appear that while the Bill of Lading and the Invoice described the goods as 'Propylene' the marks on the consignments indicated that they contained 'Polypropylene'. The 1st Respondent was asked to explain the discrepancy by the Customs authorities. There was also some dispute raised as regards the invoice price. The 1st Respondent could not, however, clear the goods 936 from the Port of Bombay. Thereafter the 1st Respondent filed another Writ Petition No. 519 of 1986 for the issue of a direction to the Customs authorities to permit it to clear the consignments. On April 2, 1985 the learned Single Judge of the High Court of Bombay who heard the said Writ Petition passed an order allowing the 1st Respondent to dear the consignments on furnishing an Import Trade Control bond for the value of the consignments calculated at the rate of U.S $ 735 per metric ton and furnishing a Bank Guarantee of a nationalised bank in favour of the Collector of Customs, Bombay to the satisfaction of the Prothonotary & Senior Master, High Court, Bombay, for a sum equivalent to the difference in the value between U.S $ 7 15 and U.S $ 735 per metric ton without prejudice to the rights and contentions of the 1st Respondent. The said order provided that the Customs authorities could continue their investigation and adjudicate upon the duty payable by the 1st Respondent. On the basis of the above order the 1st Respondent was allowed to withdraw the Writ Petition with liberty to file a fresh petition, if required. Since there was a delay in the clear- ance of the consignments in question and the 1st Respondent had become liable to pay demurrage to the Port Trust, the 1st Respondent addressed a letter to the Collector of Cus- toms, Bombay asking him to issue a Detention Certificate stating that the goods had been detained for bona fide Import Trade Control formalities so that it could claim the remission of demurrage payable to the Port Trust. The 1st Respondent followed up the above letter by another Writ Petition No. 1007 of 1986 which was filed on or about the 17th April, 1986 against the Customs authorities for the issue of a writ directing them to issue a Detention Certifi- cate in respect of all the 5 consignments. On the 24th April, 1986 the learned Single Judge passed a final order directing the Customs authorities to issue a Detention Certificate to the 1st Respondent on the 1st Respondent giving an undertaking to the Court that it would pay the amount, if it failed in Writ Petition 122 of 1986. Pursuant to the Order' dated 24th April, 1986 passed in Writ Petition No. 1007 of 1986 the 1st Respondent gave an undertaking to the Court that it would pay the amount upon its not succeed- ing in Writ Petition No. 122 of 1986. On the 21st May, 1985 the Port Trust received a letter dated 19th May, 1986 from the Assistant Collector of Customs in which it had been stated inter alia that five Detention Certificates had been sent along with the said letter.. Actually no enclosures were received along with the said letter. But later on they received two Detention Certificates in respect of two out of the five consignments on that day. They related to two bills of entry bearing Nos. 3133/219 and 3 133/220. On the same day the Docks Manager of the Port Trust received a letter from the clearing agent of the 1st Respondent asking 937 the Port Trust to grant the remission of demurrage in view of the Detention Certificates issued by the Customs authori- ties. Since the Port Trust was not a party to any of the Writ petitions, referred to above; and no Bank Guarantee or Demand Draft had been furnished by the 1st Respondent cover- ing the 80% amount of the demurrage fees, the Port Trust wrote a letter dated 30th May, 1986 to the 1st Respondent asking the 1st Respondent to give a Bank Guarantee to the effect that in the event. of the 1st Respondent losing Writ Petition No. 122 of 1986 it would pay to the Port Trust, Bombay the entire amount of remission along with interest at 15% per annum. When the aforesaid letter was sent, the Port Trust was not aware of the Order dated 2nd April, 1986 passed in Writ Petition No. 519 of 1986. Thereupon, on June 12, 1986 the 1st Respondent and its partner Sham Lal Kishna- ni, who is 2nd Respondent herein filed another Writ Petition No. 1424 of 1986 in the High Court against the Port Trust for quashing the communication dated 30th May, 1986, re- ferred to above, under which the Port Trust had asked the 1st Respondent to furnish the Bank Guarantee or a Demand Draft to the extent of 80% of the demurrage fees claimed by the Port Trust and for compelling the Port. Trust to honour the Detention Certificates issued by the Customs authorities pursuant to the Order dated 24th April, 1986 and to permit the clearance of the goods without payment of demurrage and without insisting upon the furnishing of a Bank Guarantee or a Demand Draft, as stated above. They also asked for an interim order of the effect that pending hearing and final disposal of the said Writ Petition, the Port Trust should forthwith honour the Detention Certificates issued by the Customs authorities and allow the clearance of the goods without payment of demurrage and without insisting on the Bank Guarantee or the Demand Draft. In that Writ Petition an interim order was passed on the 17th June, 1986 as prayed for by the 1st Respondent. Thereafter the Port Trust was advised to file an appeal before the Division Bench against the Order dated 2nd April, 1986 passed in Writ Petition No. 519 of 1986 and the Order dated 17th June, 1986 passed in Writ Petition No. 1424 of 1986. While the Port Trust was in the process of getting the said appeals made ready for filing by their advocates, the 1st Respondent threatened the Port Trust with contempt proceedings by its letter dated 20th June, 1986. Immediately after the receipt of the said letter, the Port Trust lodged the Appeal no. 512 of 1986. By an order dated 26th June, 1986 the appeal filed against the Order dated 2nd April, 1986 passed in the Writ Petition No. 1007 of 1986 was summarily dismissed. The said order, howev- er, stated as under:

"It is, however, clarified that it is clear from the im- pugned 938 order dated 24.4.1986 that the undertaking pertains to the demurrage charges payable to the Port Trust. if the Respond- ents Nos. 1 and 2 (Petitioners) failed in Writ Petition No. 122 of 1986 on the footing that no valid detention certifi- cate could have been issued in that event. Mr. Chinoy contends that the detention certificate could not be issued, if in the adjudication proceedings the Petitioners are found at fault and the question of the Petitioners giving an undertaking to provide for this does not appear to have been present in the mind of the learned Judge when the order was passed.
Liberty to the Appellants 'to seek further clari- fication and/or orders on this question from the learned Single Judge."

The appeal filed against the Order dated 17th June, 1986 in Writ Petition No. 1424 of 1986 was numbered as Appeal No. 535 of 1986. The said appeal was also summarily dismissed on 26th June, 1986. As the Port Trust was advised to file an appeal in this Court by special leave, the Port Trust did not apply to the learned Single Judge for clarification as suggested in the Order passed in Appeal No. 512 of 1986. It may be mentioned at this stage that the remaining three Detention Certificates relating to Bills of Entry Nos. 3133/221,222 and 223 were received by the Port Trust from the Customs authorities on 3rd July, 1986. Two out of the five consignments were cleared by the 1st Respondent on 3rd July, 1986 and the remaining three consignments were cleared by the 1st Respondent on 5th July, 1986 on payment of an aggregate amount of Rs.49,510/50 paise for the charges of the Port Trust in accordance with the Order dated 17th June, 1986 passed in Writ Petition No.1424 of 1986 as against a total amount of Rs.3,53,514.75 paise due to the Port Trust for wharfage and demurrage charges upto the dates of the clearance of goods. Thus a sum of Rs.3,04,004.25 in respect of wharfage and demurrage charges of the said five consign- ments remains unpaid to the Port Trust. Aggrieved by the two orders passed on 26th June, 1986 in Appeal No. 512 of 1986 and Appeal No. 535 of 1986 the Port Trust has filed these two appeals by special leave.

939

The principal contention urged in both these appeals is that the High Court should not have directed the Customs authorities to issue Detention Certificates without the Port Trust being made a party to the Writ Petition and in any event without passing an order duly providing for the pay- ment of the wharfage and demurrage charges due to the Port Trust in the event of the 1st Respondent failing in its contention in Writ Petition No. 122 of 1986. It is urged that a mere undertaking given in favour of the High Court agreeing to pay the amount was not sufficient security for the amount due to the Port Trust in the event of the 1st Respondent being held to be the party in default. It is further contended that the High Court committed an error in directing the 1st Respondent to give a Bank Guarantee only in respect of the Customs duty payable by the 1st Respondent in the event of its Writ Petition being dismissed and in not making a similar order directing the 1st Respondent to furnish a Bank Guarantee in respect of the wharfage and demurrage charges payable to the Port Trust in the event of the 1st Respondent being ultimately held as the party in default.

The Port Trust is constituted under the Major Port Trusts Act, 1963 (hereinafter referred to as the Act). Under Section 5 of the Act every Board constituted under it is declared to be a body corporate having perpetual succession and a common seal with power, subject to the provisions of the Act, to acquire, hold or dispose of property and it may be the name by which i.t is constituted, sue or be sued. The affairs of the Port Trust are managed by the Board of Trus- tees and committees appointed by it in accordance with the provisions of the Act. It is thus an independent statutory body and not just a department of Government. Under Chapter VI of the Act the Board of Trustees of a Port Trust is empowered to impose and recover rates at Ports, for services rendered by the Port Trust or other persons at the port under its jurisdiction. Sections 48 to 65 of the Act which are in Chapter VI of the Act deal with the said power of the Board of Trustees. Section 48 authorises a Board from time to time to frame a scale of rates at which and a statement of the conditions under which, any of the services specified thereunder shall be performed by itself or any person autho- rised by it at the port or port approaches. Clause (d) of section 48 specifically empowers the Board to impose rates in respect of wharfage, storage or demurrage of goods on any such place. Every scale of rates and every statement of conditions framed by the Board under the foregoing provi- sions are required to be submitted to the Central Government for sanction and will have effect when so sanctioned and published by the Board in the Official Gazette. It is, however, provided in section 53 of the Act that the Board of Trustees in special 940 cases and for reasons to be recorded in writing, may exempt either wholly or partially any goods or vessels or class of goods or vessels from the payment of any rate or of any charge leviable in respect thereof according to any scale in force under the Act or remit the whole or any portion of such rate or charge so levied. The Port Trust has fixed the scale of rates charged at the docks. A booklet containing the said rates which are revised upto 10.1.1985 is produced before the Court. Section III of the said booklet which commences at page 14 thereof contains the Docks scale of rates' fixed by the Port Trust. In consultation with the Customs authorities, the Port Trust has provided for the grant of concession in the matter of payment of demurrage charges on the issue of Detention Certificate by the Customs authorities. Section III-A(c) of the said booket deals with the demurrage fees chargeable by the Port Trust. Proviso (d) to the said clause (c) states that the goods detained by the Customs Department for special examination 'involving ana- lytical or technical tests other than the ordinary processes of appraisement' will be exempt from demunage fees during such period of detention as may be certified by the Collec- tor of Customs to be not attributable to fault or negligence on the part of importers or exporters plus two working days and that the Certification by the Customs will be given by endorsement on relative duplicate copies of Bills of Entry or Shipping Bills. On the suggestion of the Customs Depart- ment the Port Trust has accepted to allow concession in the matter of demurrage charges to the extent indicated in Paragraph 4.10 of the note which is enclosed as Ext. 'B' to the Special Leave Petition (Civil) No. 8466 of 1986. It reads thus:

"4.10 The best course seems to be to charge a rate per day which corresponds to our minimum charge for handling, stor- age, care and custody or the goods after the expiry of the free days. Wharfage constitutes handling costs plus storage charges for a period of four days. Deducting handling costs, the balance represents storage charges for a period of four days. It is estimated that, excluding the handling costs, storage charges per day are equal to 20% of total wharfage. It. is, therefore, suggested that for the entire period of certified detention we may retain per day 20% of the wharf- age to cover the services referred to herein."

The above concession is extended by the Port Trust in appropriate cases where Detention Certificates are issued by the Customs authorities. The Customs authorities have laid down the procedure for issue of Detention Certificates and the current procedure in 941 regard to the issue of Detention Certificates is embodied in the Bombay Custom House Public Notice No.111 dated 29th July, 1985. Paragraph 2.of the said notice sets out the circumstances under which a regular Detention Certificate could be issued by the Customs House for facilitating the importers to get remission of demurrage charges. They are as under:-

"(a) Where the goods are detained by Custom House for bona fide operation of Import Control Formalities without any default on the part of the importers.
(b) Where the goods have been released on caution (a regular Detention Certificate and not a Recommendatory letter).
(c) Where, the goods are detained the Custom House pending test report and the facility of clearance against provisional assessment has not been allowed. Such Detention Certificates will be issued on merits for the period for which the goods were detained for the purpose.
(d) Where, the goods are detained for PHO formalities, the certificate will cover the period stretching between the date of drawal of the sample by the PHO and the date of his test results, and
(e) In cases where samples have been drawn from the imported consignments by the Asstt. Drug/Controller for ensuring compliance with the provisions of Drugs and Cos-

metics Act, 1940 and where the Assistant Drugs Controller is of the opinion that release cannot be allowed against a Letter of Guarantee pending test."

The said Public Notice also states that Detention Cer- tificates will not be issued in the following types of cases:

(a) "Time taken by the Custom House Laboratory for analytical/chemical testing of samples drawn from the con-

signments, since the facility of clearing the goods on bond in terms of Section 18 already exists.

(b) Samples drawn from the imported consignments by the 942 Assistant Drugs Controller for ensuring compliance with the provisions of Drugs and Cosmetics Act, 1940 and for being forwarded to the Central Drugs Laboratory, Calcutta, as the importers can avail of the facility of clearing the goods against Letters of Guarantee and need not wait till the receipt of the test report.

The facility of allowing clearance of goods against letters of Guarantee is extended only on the specific recom- mendations of the Assistant Drugs Controller on the Bill of Entry in each case.

(c) The period taken for mutilation of woollen rags in the Docks.

(d) Cases where goods are detained in the ordinary course of appraisement such as for determination of the Tariff classification of goods or their assessable value in terms of Section 14 of the Customs Act."

It is agreed between the Customs authorities and the Port Trust that no Detention Certificate would, however, be issued by the Customs Department if there has been any default on the part of the importer or exporter. It is thus clear that in the event of the importer or exporter being at fault, he would not be entitled to any concession in the matter of demurrage charges. He has to pay whatever is payable in accordance with the 'scale of rates' charged at the docks as fixed by the Port Trust.

The power of a Port Trust to fix rates of demurrage and to recover the same from an importer or exporter (although the question of an exporter paying demurrage arises rarely) under law and to show concession as regards demurrage charges in certain specified cases is recognised by this Court in the Trustees of the Port of Madras v. M/s. Amin- chand Pyarelal & Others, [1976] 1 SCR 721 and in the Board of Trustees of the Port of Bombay versus Indian Goods Sup- plying Co., [1977] 3 SCR 343. These decisions are no doubt based on the relevant laws which were in force at the mate- rial time. But the decisions are still relevant insofar as cases arising under the Act because the Act also contains provisions more or less similar to the statutory provisions considered in the said decisions. Demurrage charges are levied in order to ensure quick clearance of the cargo from the harbour. They are always fixed in such a way that they would make it unprofitable for 943 importers to use the port premises as a warehouse. It is necessary to do so because congestion in the ports affects the free movement of ships and the loading and unloading operations. As stated earlier. the Port Trust shows conces- sion to the party concerned in certain types of cases. In the instant case the High Court by the order passed in the writ petition to which the Port Trust was not a party directed the Customs authorities to issue Detention Certifi- cates in respect of the consignments in question. In doing so while the High Court had safeguarded the interests of the Customs authorities by. its earlier orders by directing the 1st Respondent to furnish a Bank Guarantee in respect of the duty payable to them, in respect of the demurrage charges payable to the Port Trust the High Court merely directed an undertaking to be given in favour of the High Court. In the ordinary course, the High Court should have directed the 1st Respondent to furnish Bank Guarantee in respect of the demurrage charges payable to the Port Trust in the event of the 1st Respondent being held to be in default ultimately. It is, however, to be observed that before compelling the Customs authorities to issue a Detention Certificate, the High Court should have issued notice to the Port Trust which was vitally interested in securing its own interests as regards the demurrage charges recoverable by it under law. This was necessary because on the production of the Detention Certificate issued by the Customs authorities the Port Trust was under an obligation to permit the clearance of the goods without payment of full demurrage charges. If ultimately the party concerned is found to be at fault and becomes liable to pay the full demurrage charges the Port Trust may not be in a position to recover such full demur- rage charges from the party concerned, since it would have no longer any lien as provided by section 59 of the Act on the goods which are already cleared The Port Trust being a body corporate constituted under the Act is entitled to be heard by the Court before any order which affects its inter- ests prejudicially is passed. This case serves as an illus- tration to what is stated above. The Port Trust has been asked to permit the clearance of goods in respect of which demurrage charges of Rs.3,53,5 14.75 paise are payable in the event of the 1st Respondent being held liable in law to pay the full demurrage charges. The orders passed by the High Court in the proceedings to which the Port Trust was not a party which had the effect of prejudicially affecting the interests of the Port Trust would not be binding on it in view of the violation of the principles of natural jus- tice. The High 944 Court erred in not imposing any condition on the 1st Re- spondent for protecting the interests of the Port Trust even in the Writ Petition to which it was a party. The impugned orders are contrary to the public notice issued by the Customs authorities as well as the rules of the Port Trust. Having regard to the peculiar circumstances of this case in which the goods have already been cleared, the orders of the High Court of Bombay against which these appeals are filed are, therefore, to be modified appropriately in order to protect the interests of the Port Trust. Accordingly, at the conclusion of the hearing of these appeals we passed an order on 16.12.1986 before reserving the appeals for judg- ment directing the 1st Respondent to furnish within eight weeks a Bank Guarantee of a Nationalised Bank in favour of the appellant for due payment of Rs.3,04,004.25 paise to the appellant on demand, without any demur, being the balance of wharfage and demurrage charges in the event of the 1st Respondent not succeeding ultimately in Writ Petition No. 127 of 1986 and on failure to furnish such Bank Guarantee within eight weeks to pay in cash Rs.3,04,004.25 paise to the appellant forthwith. This shall be the final order in these appeals.

These appeals are disposed of in the above terms. The Customs authorities shall complete the adjudication proceed- ings as expeditiously as possible and in any event within 16.3.1987.

P.S.S.					    Appeals disposed
of.
945