Section 10(3)(c) in The Petroleum and Natural Gas Regulatory Board (Access Code for Common Carrier or Contract Carrier Natural Gas Pipelines) Regulations, 2008
(c)advising that the data provided by the shipper require technical study to accommodate his request and such study shall be completed within seven days from the date of receipt of request; or