 Inspection Report in the matter of OA 175/2020 (SZ)
 JOINT INSPECTION REPORT OF COMMITTEE CONSTITUTED BY HON'BLE
NATIONAL       GREEN   TRIBUNAL,   SOUTHERN      BENCH,   CHENNAI     IN
COMPLIANCE TO HON'BLE NGT ORDER DATED 19.01.2022 IN THE MATTER
OF OA NO. 175 OF 2020 (VENKATAPATHI RAJA YENUMALA VS UNION OF
INDIA & ORS)




                           SUBMITTED        TO
               HON'BLE NATIONAL GREEN TRIBUNAL
                   SOUTHERN BENCH, CHENNAI

                              March, 2022




                                                             Page 1 of 39
                                                                                                       2
Inspection Report in the matter of OA 175/2020 (SZ)

I      Preamble
An application was filed in Hon'ble NGT Southern bench alleging that air, sound, soil and water
pollution is caused on account of the activities of the M/s GAIL India Ltd (formerly Gas
Authority of India Ltd) and M/s ONGC (Oil & Natural Gas Corporation Ltd) units in the State of
Andhra Pradesh along the Krishna-Godavari Basin located in East Godavari and West Godavari
District of Andhra Pradesh. According to the applicant oil leakage is being caused in the pipe
lines established by these units causing damage to the agricultural land and also affecting the
water bodies. It is also alleged that the units are not following the pollution control mechanism
and there is no proper maintenance of pipelines. In order to ascertain the impact of the activities
of M/s GAIL and M/s ONGC in Krishna Godavari River bed in East Godavari and West
Godavari District, Hon'ble NGT has appointed a Joint Committee. Committee submitted the
report to Hon'ble NGT during April, 2021.


ONGC submitted detailed status report and compliance report to Hon'ble NGT and in response
to this Hon'ble NGT vide order dated 19.01.2022 again directed the joint committee to inspect
the unit and consider the compliance report submitted by ONGC. Hon'ble NGT has directed the
Joint Committee to ascertain as to whether ONGC is spending its CSR amount to meet the
environmental sustainable development activities as directed to be done under Environmental
Clearance and incorporate the same in the report to be filed.


II     Orders of the Hon'ble Tribunal
Hon'ble NGT, Southern Bench, Chennai in Original Application No. 175/2020(SZ) in the matter
of Venkatapathi Raja Yenumala Vs Union of India & Ors vide order dated 19-01-2022 has
directed as follows:
"So, we direct the Joint Committee to inspect the unit again and consider the compliance report
submitted by the ONGC regarding the recommendations made and the Pollution Control Board
is also directed to inspect independently and submit their report regarding satisfaction of the
compliance and further steps, if any, to be taken to avoid such incidents in future from their side
as a regulator. They have also not filed any action taken report as undertaken by them. So, the
Joint Committee as well as Pollution Control Board are directed to file their further report and
action taken report, if any, required on or before 25.02.2022.

                                                                                      Page 2 of 39
                                                                                                      3
Inspection Report in the matter of OA 175/2020 (SZ)

The Joint Committee is also directed to ascertain as to whether ONGC is spending its CSR
amount to meet the environmental sustainable development activities as directed to be done
under Environmental Clearance and incorporate the same in the report to be filed ". Copy of
Hon'ble NGT order is placed as Annexure-I.



IIa.   Composition of the Committee
In compliance to Hon'ble NGT order, committee comprising of following members was
composed:
Name       &   designation of   the Department with address
official
Sh. C Vishnu Charan, IAS             Sub Collector      and Sub Divisional Magistrate
                                     Narsapuram West Godavari
Sh. Vasatha Rayudu,                  RDO, Amalapuram, East Godavari


Dr. Suresh B Pasupuleti              Ministry of Environment Forest and Climate Change,
Scientist-D                          Regional Office, Vijayawada
Prof. M. Deepa                       Dept. of Chemical Engineering,
                                     A.U College of Engineering (A)
                                     Andhra University, Visakhapatnam
Sh. P. Ravindranath                  Andhra Pradesh Pollution Control         Board, Zonal
Senior Environmental Engineer        Office, Visakhapatnam
Smt. Mahima T                        Central Pollution Control Board
Scientist-D                          Regional Directorate, Chennai


The committee visited the site from 8th to 11th March, 2022 and carried out ambient air quality
monitoring, collection of water &wastewater samples and soil samples. Committee interacted
with villagers, village heads, school authorities and interacted with the applicant over phone.




                                                                                      Page 3 of 39
                                                                                                            4
Inspection Report in the matter of OA 175/2020 (SZ)

III      Compliance Verification of the units
In compliance to Hon'ble NGT orders, post committee inspection M/s ONGC has taken
corrective actions. M/s ONGC has submitted in the Compliance Report that following actions
are implemented in all installations in Kakinada and Rajahmundry asset:
      a. Units have taken measures for periodical cleaning and desilting of drains.
      b. Measures are taken for disposal of sludge. Tenders are invited for bio-remediation
          ofsludge.
      c. Closed loop system for VAP sampling(Tatipaka)
      d. Initiated for construction of sludge pit of 1000 m3 capacity (Tatipaka)
      e. Construction of Two sheds, One for Hazardous waste and the other for hazardous
          chemicals
      f. Units have initiated measures to install flowmeters at inlet of ED (effluent disposal well)
      g. LDAR (leak detection and repair) is carried out internally by the units and necessary
          corrective actions are taken to arrest leakages.


Compliance status of specific installation is described in below sections.
IV.      Compliance Verification of Tatipaka GCS
Sl.    Non-compliances         Compliance             status Current        status     of Remarks
N      observed          by submitted by the unit and          compliance as verified
O      committee during Upgradations/                          by the committee
       first visit             Modifications made by the
                               unit
1      The storm water         Oil catchers are provided in    Unit has desilted and Partially
       from              the two      storm   water   drains   cleaned the drains and complying
       installation       is   located near process area       the oily sludge settled in
       discharged       into and any oil carried over          the drains are removed.
       main drains laid from the process area is               but however mode of
       outside the unit recovered in the oil catcher.          disposal of silt & oily
       premises.      During Unit has taken measures to        sludge was not available.
       inspection        the desilt and clean the storm        Near      the     effluent
       committee               water drains twice a year to collection tank and near

                                                                                            Page 4 of 39
                                                                                                               5
Inspection Report in the matter of OA 175/2020 (SZ)


     observed that due          prevent logging. Unit has       effluent tanker unloading
     to heavy rains and submitted that all the drains           tank,   effluents      were
     water            logging, were cleaned and unit has        present in the drain.
     effluent            was taken measures to recover          There are cracks in tank
     getting mixed with oil from the storm water                used     for      collecting
     storm water and drains.                                    effluent from tankers and
     from       the     main Unit claims as complying           effluent was seeping into
     drain       it      may                                    adjacent ground.
     ultimately          join                                   Storm          water      is
     sea.                                                       discharged outside the
                                                                unit. Unit has not made
                                                                any arrangements to lift
                                                                the first flush of rain
                                                                water   (for 30minutes)
                                                                and to treat the same in
                                                                ETP.
2    The     tilted plate ETP Upgradation work is               Tilted plate interceptor is    Not-
     interceptor         and yet to be undertaken.              not upgraded but only          complying
     slop oil tank are          Support structure of Tilted     supporting civil structure
     not          working Plate           interceptor        is (wall) is strengthened.
     properly.           The strengthened      and      is   in The      capacity       and
     capacity            and operation as per the design        retention time of plate
     retention time of capacity of 21 cum per hour              interceptor       is    not
     plate interceptor is which is adequate as per the          adequate to treat the
     not adequate          to design criteria of ETP.           effluent. Oil separators
     treat the effluent.        Unit claims as works under      are      not       properly
     Hence        the     oil progress.                         working.
     removed            from
     effluent              is
     stagnated           and
     overflowing.


                                                                                               Page 5 of 39
                                                                                                              6
Inspection Report in the matter of OA 175/2020 (SZ)


3    The units have not ETP upgradation works is           Unit is yet to obtain              Complying
     amended            the yet to be undertaken.          amendment            of     the    w.r.t
     consent     for    the Post committee inspection,     consent         order        for effluent
     revised quantity of Tatipaka       GCS is taking increased            quantity     of discharge
     effluent generated. effluent         from      other effluent generated.                 limits.
     Thereby presently        installations only on very   As     per     the      records,
     the            effluent rare occasions and effluent   average                 effluent
     generated from the generated        from    Tatipaka generated         from       the Not
     installation        is GCS is only treated in the     installation is 350m3/day complying
     more       than    the ETP.                           but    the     capacity      of w.r.t CFO
     quantity specified                                    effluent collection tank           conditions
     in the CFO issued Unit claims as work under           is 40 KL. Unit is not
     by APPCB           and progress                       having capacity to store
     moreover           the                                the effluent for even a
     existing ETP        is                                day.
     not adequate        in                                ETP          comprises       of
     terms of capacity                                     collection tank slop oil
     to treat the present                                  tankclarifierMMF
     effluent generated.                                    ED wells. Committee
     As per the CFO                                        collected effluent sample
     issued to Tatipaka                                    from inlet and outlet of
     GCS                on                                 ETP and the analysis
     27.02.2015         the                                results are given in table
     quantity            of                                1 and treated effluent is
     effluent     is   225                                 meeting with ED well
     KLD but presently                                     disposal limits.
     effluent generated
     is more than 500                                      Old ETP which is not in
     KLD. In addition,                                     use     is     filled      with
     15     KLD          of                                effluent. Oily effluent is
     effluent generated                                    still present in clarifier.


                                                                                              Page 6 of 39
                                                                                                                7
Inspection Report in the matter of OA 175/2020 (SZ)


     from        Tatipaka                                      Unit shall submit time
     mini        refinery,                                     bound action plan to the
     Endamuru       GCS                                        treat the effluent present
     and      Mandapeta                                        in   old    ETP      and    to
     GCS has to be                                             dismantle old ETP.
     treated. Hence the
     existing ETP of
     capacity 500KL is
     not    adequate    to
     treat the present
     quantity           of
     effluent generated.
Table 1: Wastewater analysis results of Tatipaka GCS
 Location                                TSS mg/L              Oil & grease mg/L
 ETP inlet - Tatipaka                    1670                  66.7 mg/L
 ETP Outlet- Tatipaka                    15                    BDL(DL:4.0)
 APPCB standards                         100                   10
 Guard pond Water- Tatipaka              12                    BDL(DL:4.0)
From the results it is clear that the treated effluent is meeting the APPCB standards for ED well
disposal. From the guard pond effluent is discharged to ED well. Detailed wastewater analysis
results are enclosed as Annexure-II.
4    Sludge        drying Unit has invited tenders for Oily sludge generated Not-
     beds are not in disposal of sludge.                       from the inception of the complying
     operation               Oily sludge is collected in unit is stored in open in
                             Sludge      storage         tank. sludge tanks upto brim
                             Tendering    work      is     in of the tank.          It    was
                             progress for Oil recovery reported by the unit that
                             from Sludge (E-tender No. the             spillages         were
                             K16JC21015)                       removed and transferred
                             followed by Bioremediation        to the tank itself. During
                             of residual for which NOA         rainy      season,    runoff

                                                                                                Page 7 of 39
                                                                                                             8
Inspection Report in the matter of OA 175/2020 (SZ)


                                exist with TERI.               water from sludge tank
                                Unit claims as work under      is likely to carry sludge
                                progress.                      particles with it to the
                                                               surrounding area.
Committee collected sediment samples near effluent collection tank and tanker unloading tank
and analysis results for core parameters are as follows (detailed sediment analysis results is
submitted as Annexure-III:
Table 2: Sediment samples analysis results of Tatipaka
Location               Total
                                 Iron        Mercury    Lead        Benzene Benzo(a)py Phenols
                       TPH
                                 (mg/kg)     (mg/kg)    (mg/kg)     (mg/kg) rene (µg/kg (mg/kg)
                       mg/Kg
Sediment sample
adjacent to      40              BLQ         BLQ        BLQ         BLQ        BLQ           BLQ
                   411.84
KL         effluent              (LOQ:11.0) (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1)
collection tank
Sediment sample
adjacent          to                         BLQ        BLQ         BLQ        BLQ           BLQ
                       752.67    729.61
effluent    tanker                           (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1)
unloading tank
Sediment sample                              BLQ(LOQ:               BLQ(LO BLQ(LOQ: BLQ(LOQ:
                       98.13     3148.15                3.88
near sludge tank                             2.0)                   Q:20)      20)           0.1)
sediment analysis results indicates that effluent may be seeping into the soil from effluent
collection tank and tankers unloading tank.
5    TVOC              levels Online            Hydrocarbon    TVOC         levels   was     Complying
     measured           using detectors are installed to measured                    using
     handheld            PID monitor fugitive emissions.       handheld PID analyzer
     analyser      in     the                                  in the ETP area and
     ETP        area         is Guard pond and storm water TVOC           levels      was
     varying            from drains cleaning has been varying between 0ppm
     2.2ppm to 4.0ppm           carried out and TVOC levels to 2ppm.
                                are within the limits

                                                                                             Page 8 of 39
                                                                                                                     9
Inspection Report in the matter of OA 175/2020 (SZ)


                                   Unit claims as complying
6    There           is      no Hazardous          waste        and    Unit has constructed one      Complying
     dedicated                     chemical        sheds         are shed     for    storage    of
     hazardous            waste    constructed.                        hazardous waste- lube
     storage shed. ETP Storage of hazardous waste oil but however lube oil
     sludge,              empty & chemicals are being stored was not stored in the
     barrels, slop oil in the designated sheds.                        shed. Reported that lube
     are                  stored Unit claims as complying              oil was disposed during
     haphazardly                                                       February, 2022.
     within      the        unit
     premises
7    In old GCS plant              Drain channels are cleaned.         It was observed that no       Complying
     drain effluent is The pH levels are observed effluent was joining the
     joining              storm to be within the limits.               drain in old GCS plant
     water drains and Unit claims as complying                         and drains were in dry
     pH        of          drain                                       condition. There were no
     effluent was 14                                                   rains in the area during
                                                                       committee inspection.
8    LDAR of refinery Unit                    is        periodically   Unit is yet to carry out      Partially
     is not carried out. monitoring                TVOC       levels Leak        detection     and Complying
     TVOC levels near internally. Unit has carried repair                        (LDAR)      study
     the      valves          of out LDAR internally.                  through           certified
     distillation column Unit claims as complying                      agencies.
     is around 5ppm
     and near sampling
     point is 70ppm
9    In        the          gas The Boiling point of TEG is            There was       no    odor    Complying
     dehydration            unit more than 240oC whereas, nuisance. VOC levels
     in    the       re-boiler the re-boiler temperature is was              measured        using
     system,              during maintained at 190oC. So the handheld VOC analyzer
     knocking               out chances            of         glycol and it was 0ppm.


                                                                                                     Page 9 of 39
                                                                                                             10
Inspection Report in the matter of OA 175/2020 (SZ)


     some           glycol vaporisation is nil.
     vapors is carried Unit claims as complying
     along           with
     moisture.      There
     was odor nuisance
     in the area.
10   Odour nuisance         Due to cleaning of drains,     There was no odour                 Complying
                            removal of oily sludge and nuissance. Ambient air
                            controlled     knock       out quality monitoring was
                            emissions TVOC levels are conducted inside the unit
                            within the limits and hence and         in        malletivara
                            there is no odour nuisance.    merakinagalam         village,
                            Unit claims as complying       Peerlacheruvu           nagar
                                                           village and pedapatinam
                                                           nagarm                 village
                                                           surrounding                the
                                                           installation and found
                                                           that   it     is      meeting
                                                           ambient       air     quality.
                                                           Ambient       air      quality
                                                           results are enclosed as
                                                           Annexure-IV
11   CFO validity                                          Tatipaka       GCS         has Complying
                                                           obtained Consent under
                                                           the Water Act, 1974, the
                                                           Air    Act,     1981       and
                                                           Hazardous              Waste
                                                           authorization valid till
                                                           31.07.2023.         Copy    of
                                                           Tatipaka        CFO         is
                                                           enclosed as Annexure-V


                                                                                            Page 10 of 39
                                                                                                 11
Inspection Report in the matter of OA 175/2020 (SZ)




Photo 1: drains in Tatipaka after cleaning                 Photo 2: tilted plate interceptor




Photo 3: Hazardous         waste Photo 4:waste oil drums   Photo 5: Clarifier filled with
storage shed                     stored in open            effluent in old ETP




Photo 6: Effluent treatment plant                          Photo 7:Treated effluent storage
                                                           tank




                                                                                Page 11 of 39
                                                                                                       12
Inspection Report in the matter of OA 175/2020 (SZ)




Photo 8: Sludge tank               Photo 9: area surrounding the sludge tank



IVa.    Environmental compensation from Tatipaka GCS
EC          for
                EC=PI x N x R x S x LF
violation    of
                            Where,
CFO
                            EC = Environmental Compensation in INR
conditions
                            PI = Pollution Index of industrial sector (red-80)
                                  N = Number of days of violation took place (from the date
                                  of violation to date of compliance- 25.02.2021 to
                                  11.03.2022= 379 days
                committee had calculated compensation till 25.02.2021 and committee re-
                inspected during 08-03-2022 to 11-03-2022 and observed following non-
                compliances:
                       1.

Tilted plate interceptor is not properly working

2. Effluent is seeping into soil from effluent collection tank and tanker unloading tank

3. Oily sludge (hazardous waste) is laying in open in sludge tank for more than 5 years.

4. Effluent and oily sludge is present in Old ETP which is not in use for more than 3 years.

R = A factor in Rupees for EC (Rs. 250/-) S = Factor for scale of operation (large-1.5) LF = Location factor=1 Page 12 of 39 13 Inspection Report in the matter of OA 175/2020 (SZ) =80*379 days*250*1.5*1 = 1,13,70,000/-

Rupees One crore thirteen lacs seventy thousand only Considering that unit has made improvements and is mainly complying with effluent disposal standards, committee has not imposed repeated violation factor.


V.     Compliance Verification of Kesanapalli-W: GGS
Sl.   Non-compliances              Compliance status Current status of compliance              Remarks
No    observed               by submitted by the         as verified by the committee
      committee           during unit              and
      first visit                  Upgradations/
                                   Modifications
                                   made by the unit
1     Effluent is getting Drains                   were Unit has cleaned storm water           Partially
      mixed with           storm cleaned.                drains but however Oil catchers complying
      water      and       storm                         are not installed in the drains and
      water is discharged                                measures to prevent entry of
      into      main       drain                         effluent into storm water drains
      outside       the     unit                         is not taken up. Measures to lift
      premises. pH of the                                or pump first flush of rain water

storm water was 12. into ETP is not taken.

      In      addition       the                         Records on the quantity of oily
      leaves and garden                                  sludge removed from the drains
      waste is in the drain                              and mode of disposal of this
      and getting putrefied                              sludge was not made available to
      in the drain itself                                committee.




                                                                                         Page 13 of 39
                                                                                                                  14

Inspection Report in the matter of OA 175/2020 (SZ) 2 The effluent stored Red colored Reported that red colored Complying in treated effluent effluent is taken to effluent from treated effluent sump was red in ETP for treatment. storage tank was again taken color and pH was Unit informed that back to ETP for re-treatment. more than 12 awareness was During committee insoection no created among the red colored effluent wss present workers as not to inside the unit premises. Treated add any chemicals effluent samples were taken and into treated water or analysis results are given table 3. fresh water sumps.

                             Unit    claims     as
                             complying
3     There      is     no Dedicated       storage Unit          has     constructed   two   Partially
      dedicated hazardous    sheds for hazardous separate          sheds      for chemical complying
      waste storage sheds    waste             and storage and hazardous waste (shed                        is
                             chemicals        have storage. Unit is generating two           constructed)
                             been built.              categories of hazardous waste:
                             Unit    claims     as ETP sludge/ oily sludge and
                             complying                waste lube oil. Currently unit
                                                      continues to store ETP sludge/
                                                      oily sludge openly in sludge tank
                                                      and unit has proposed to store
                                                      only waste lube oil in the shed.
                                                      But however on the day of
                                                      inspection, the shed was empty
                                                      and waste lube oil was not
                                                      present.




                                                                                       Page 14 of 39
                                                                                                                  15

Inspection Report in the matter of OA 175/2020 (SZ) 4 The unit was ONGC having CFE Unit is having two ETP's. Not disposing the and auto renewal of Capacity of old ETP is 750 m3/ complying effluent by means of CFO for the day and capacity of new ETP is marine disposal but operation of 1500 m3/day. Old ETP however the unit has Kesnapalli-w ETP comprises of not obtained which is available tilted plate interceptor flash necessary upto 31.07.2023. mixer flocculation tank permissions from CRZ clearance was dissolved air floatation dual APPCB for marine also obtained for media filter guard pond ED disposal. Further, laying disposal line. well. part of the pipeline New contract/tender On the day of inspection, raw used for deep sea was awarded for effluent was directly taken to disposal (1000m laying New Marine DAF and pre-treatment units stretch of pipeline disposal line in were not in operation. taking deep sea) is place of broken line New ETP comprises of broken and washed (which is expected Corrugated plate interceptor away. Presently the to be completed by induced gas floatation Nutche unit is disposing the March-2022, in the filter sequential batch effluent in the coast. favourable climate reactor media filters treated The unit had window) effluent storage tank sea obtained CRZ Meanwhile, disposal.

clearance for laying temporary Unit has obtained CRZ clearance of pipelines arrangement was for laying of pipeline for marine made with 8"casing disposal. Copy of CRZ clearance pipe and GRE is placed as Annexure-VI.

flexible connection Unit has obtained CFE from in place of the APPCB for laying of pipeline for washed out portion marine disposal. Copy of CFE is (till the permanent placed as Annexure-VII. line will be made APPCB has not granted CFO to available). the unit for marine disposal but Page 15 of 39 16 Inspection Report in the matter of OA 175/2020 (SZ) Also additional however unit claims that consent arrangement was fees is paid by the unit for done to take a marine disposal line. However substantial portion committee has clarified that unit of N.ETP treated has to obtain prior consent from effluent to ED wells APPCB for marine disposal.

ETP(old) for disposal for deep Marine disposal pipelines of well injection, and 1000m was broken and washed subsequently to away during 2018 and currently reduce marine only 60m marine disposal disposal quantity pipeline is present against the from New ETP. requirement of 1000m of deep Additional high sea disposal. Unit continues to pressure water dispose around 1200KLD of injection pump was effluent through marine disposal.

                             installed     for     this
                             purpose.                     Unit has completed laying of
                             Also          additional 1500 m HDPE line with diffuser
                             Effluent       disposal in the sea during February, 2022
                             wells               were and trenching work (post-burial
                             commissioned after           work)    by    dredger   pontoon
                             WOR for effluent             Marine is in progress. The new

disposal (deep well pipeline will be commissioned injection) for during March, 2022. The new capacity expansion. pipeline is at a distance of 150m from the old pipeline. The unit is Unit claims as work laying a new pipeline by under progress deviating the alignment of old pipeline in the CRZ area, Hence it is mandatory that unit has to Page 16 of 39 17 Inspection Report in the matter of OA 175/2020 (SZ) obtain CRZ clearance and CFE from APPCB for laying new pipeline but however unit has not obtained any clearances for laying new pipeline.



                                                      Currently, around 1200 KLD of
                                                      effluent    from   new    ETP       is
                                                      disposed      through       marine
                                                      disposal.

During inspection, villagers approached the committee and informed that effluent is discharged outside Kesanapalli GGS into empty land. Committee visited the area and observed that outside the boundary wall of the unit, water stagnation (lagoon/ pond) was present at two locations and villagers informed that it is effluent discharged from the installation. At one location just beside the boundary wall of the unit large quantity of slightly reddish colored water was present. The boundary walls of the unit are weak, cracks & small openings are developed on the wall towards old ETP. Committee collected inlet & outlet samples of old & new ETP, samples from two water stagnation points and beach water (near to disposal line) and analysis results for core parameters are as follows:

Table 3: Old ETP Kesanaplli analysis results Location TSS mg/L O & G mg/L Old ETP inlet Raw Effluent-Kesanapalli 171 BDL(DL:4.0) Old ETP outlet Effluent-Kesanapalli 13 BDL(DL:4.0) APPCB standards for ED well disposal 100 10 Table 4: New ETP Kesanapalli analysis results Sl.No Parameter New ETP inlet New ETP outlet CPCB marine outfall standards 1 pH 7.98 7.08 5.5 -9.0 2 TSS mg/L 53 17 100 Page 17 of 39 18 Inspection Report in the matter of OA 175/2020 (SZ) 3 Zinc mg/L 0.10 BLQ (LOQ:0.005) 2 4 BOD mg/L 3708 44 30 5 COD 15862 172 100 6 Chlorides 8697 9197 600 7 Sulphates 69 43 1000 8 TDS 15675 8411 2100 9 Oil & grease BDL (DL:4.0) BDL (DL:4.0) 10 10 cyanides BDL (DL:0.1) BDL (DL:0.1) 0.2 11 flourides 0.21 0.11 1.5 12 Sulphides BDL (DL:1.0) BDL (DL:1.0) 2.0 13 T. Cr 0.06 BLQ (LOQ:0.005) 1.0 14 Copper 0.07 BLQ (LOQ:0.005) 0.2 15 Lead BLQ (LOQ:0.005) BLQ (LOQ:0.005) 0.1 16 Mercury 0.04 0.01 0.01 17 Nickel BLQ (LOQ:0.005) BLQ (LOQ:0.005) 37 Table 5: Analysis results of wastewater at Kesanapalli Location pH TPH mg/L BOD mg/L COD mg/L TOC mg/L Beach sea water 8.02 3.23 274 427 171 Water stagnation (small) around 8.77 55.6 33 121 45 250m away from industry boundary Kesanapalli Large water stagnation besides 9.01 971.17 89 345 129 the boundary wall of industry towards old ETP - Kesanapalli From the analysis results in Table 5, it is observed that traces of TPH is present in beach sea water and at water stagnation point 250m from industry boundary. TPH of 971.17 mg/L is present in water adjacent to industry boundary which indicates that effluent may be leaking or may be discharged into adjacent land.
Page 18 of 39 19

Inspection Report in the matter of OA 175/2020 (SZ) 5 Water logging Area is cleared of Unit has levelled the area to Complying observed at the water logging. prevent water logging.

      entrance of the unit     Levelling            and
                               cleaning was done.
                               Now the premise is
                               properly
                               maintained.
6     In the ETP area, the     After excavation of The committee excavated soil in Complying
      unit    had    covered the area, where ever the ETP area and as well at other
      with fresh soil. The oily          soil       was locations      to   check    for     oil

committee excavated observed and which spillages or dumping of sludge the portion of the was removed and on ground. Sediment samples soil and found that transferred to were collected and observed that black oily soil was sludge bed for only traces of TPH is present present below upto bioremediation. which implies that unit has depth of 1m cleaned the area. Results are given in table 6.

7 Opposite to new The said area was Opposite to new ETP boundary Complying ETP boundary wall, allowed to dried up wall, sediment samples were waste oil & sludge is water, where ever collected and TPH in the dumped on land to oily soil was sediment samples is 3.55 mg/kg an extent of two to observed and was which implies that unit has three acres removed and cleaned the area while traces of transferred to oily sludge is present. Unit has sludge bed for initiated plantation in the area.

                               bioremediation
                               .After           cleaning
                               properly, initiative
                               was taken to bring
                               this     area      under
                               green      belt      (by


                                                                                           Page 19 of 39
                                                                                                                    20

Inspection Report in the matter of OA 175/2020 (SZ) growing greenery) 8 In around 5acres of The area allowed to It was reported by the unit that Complying land opposite to DG dry water and wherever oily sludge was room the effluent & where ever present, it was cleaned by the sludge is contaminated soil unit. Mercury in the soil sample accumulated. From was observed and is below limit of quantification the sediment that portion was sampling it is learnt cleared from the that mercury is area to sludge pit.

        present in the range       Now     greenery      is
        of 201 mg/Kg               visible in the area.
                                   The soil analysis by
                                   HECS,             shows
                                   mercury           levels
                                   below               the
                                   quantifiable limit.

Table 6: Kesanapalli sediment samples and analysis results are as follows:

TPH Iron Mercury Lead Benzene Benzo(a) Phenols Location (mg/Kg) (mg/Kg) (mg/kg) (mg/kg) (mg/kg) pyrene (µg/kg (mg/kg) Kesanapalli large water BLQ BLQ BLQ BLQ BLQ stagnation 6.52 966.23 (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1) outside unit Premises kesanapalli BLQ BLQ BLQ BLQ BLQ beach sludge-5.89 2494.66 (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1) kesanapalli Page 20 of 39 21 Inspection Report in the matter of OA 175/2020 (SZ) (sludge) behind transfer pump- BLQ BLQ BLQ BLQ BLQ 93.53 2519.68 kesanapalli (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1) (sludge) behind ows -
                                         BLQ       BLQ        BLQ           BLQ             BLQ
kesanapalli            55.60   1223.52
                                         (LOQ:2.0) (LOQ:2.0) (LOQ:20)       (LOQ:20)        (LOQ:0.1)
(sludgel)
sediment sample
behind old ETP
                                         BLQ       BLQ        BLQ           BLQ             BLQ
dmf feed sump-319.19           1894.93
                                         (LOQ:2.0) (LOQ:2.0) (LOQ:20)       (LOQ:20)        (LOQ:0.1)
kesanapalli
(sludge)
sediment sample
in front of new
etp      control                         BLQ       BLQ        BLQ           BLQ             BLQ
                3.55           1329.06
building       -                         (LOQ:2.0) (LOQ:2.0) (LOQ:20)       (LOQ:20)        (LOQ:0.1)
kesanapalli
(sludge)
Analysis results indicates that small quantity of spills/ leaks is present behind old ETP feed sump.

9 CFO validity Kesanapalli GGS has obtained Complying Consent under the Water Act, 1974, the Air Act, 1981 and Hazardous Waste authorization valid till 31.07.2023. Copy of CFO is placed as Annexure-VIII Page 21 of 39 22 Inspection Report in the matter of OA 175/2020 (SZ) Photo 10: water stagnation outside the unit Photo 11: water stagnation outside the premises (small pond) industry slightly reddish in color (large pond) Photo 12: New ETP at Kesanapalli Photo13: new ETP treated effluent storage tank Photo14 : Effluent disposal on the shore through Photo15: laying of new pipeline existing pipeline of 60m Page 22 of 39 23 Inspection Report in the matter of OA 175/2020 (SZ) Photo 16: old ETP area Photo 17: Sludge tanks V.b Environmental compensation to be levied from Kesanapalli GGS EC for EC=PI x N x R x S x LF violation of Where, CFO EC = Environmental Compensation in INR conditions, sea PI = Pollution Index of industrial sector (red-80) disposal N = Number of days of violation took place (from the date without of violation observed to date of compliance- 379 days obtaining committee had calculated compensation till 25.02.2021 and committee permission re- inspected during 08-03-2022 to 11-03-2022 and observed following from APPCB non- compliances Page 23 of 39  Old ETP was not properly operated  Unit is generating more than consented quantity of effluent 24 Inspection Report in the matter of OA 175/2020 (SZ)  Oily sludge is stored in open in sludge tank for more than five years  Unit is disposing effluent through marine outfall against the consented mode of ED well disposal  Marine outfall pipeline is broken and effluent is disposed with pipeline of 60m.

R = A factor in Rupees for EC (Rs. 250/-) S = Factor for scale of operation (large-1.5) LF = Location factor 1 =80*379*250*1.5*1* repeated violation factor of 2 =Rs. 2,27,40,000/-

Rupees Two crore twenty-seven lacs forty thousand only Considering serious nature of violation, committee has assessed EC for repeated violation VI. Compliance Verification of Odalarevu GCS Sl. Non-compliances Compliance status Current status of compliance Remarks No observed by submitted by the as verified by the committee committee during unit and first visit Upgradations/ Modifications made by the unit 1 The ETP is not Unit has improved ETP was in operation. ETP is Not functioning housekeeping and designed to treat 160 m3/day of Complying properly. Oil is maintenance (26 m3 /day of producer water w.r.t ED well removed from slop activities. with inlet TSS of 500 ppm and disposal limit oil tank and then Unit has replaced oil & grease of 500 ppm and 134 for oil & effluent is stored in corroded valves, m3/ day of storm water). grease holding ponds. serviced pumps & Committee collected samples of Multimedia filters pipelines, producer water (inlet of ETP) Page 24 of 39 25 Inspection Report in the matter of OA 175/2020 (SZ) were not in installation of new and treated effluent (outlet of operation on the day diaphragm pump, ETP) and from storm water of the visit. Effluent replacement of drain. It is found that treated is disposed on the media of multi- effluent is not meeting with ED ground without media filters. well discharge standards w.r.t oil treatment. ETP is & grease. Flow meters are not properly Unit is producing installed at inlet and outlet of working since 2017 18-30 m3/day of ETP. TPH is present in drain and the unit is yet to effluent which is sample in traces which implies replace worn out processed in 3-5 that effluent is not discharged pumps hours and injected into drain. Results are given as into effluent disposal follows:

wells.
                                The         ETP            is
                                operational              and
                                functioning properly
                                and      operated         in
                                batches      depending
                                upon load to ETP.
                                Unit       claims         as
                                Complying
Table 7: Odalarevu raw and treated effluent analysis results Oil and Grease TPH Location pH TSS (mg/L) (mg/L) (mg/L) Storm water drain beside Security 1.48 8.01 11.6 22 Gate at Vashishta gate - Odaleruvu ETP inlet - Odaleruvu 6.47 116 52 NA ETP outlet - Odaleruvu 5.87 8 14 NA APPCB ED well disposal limits 100 10 Page 25 of 39 26 Inspection Report in the matter of OA 175/2020 (SZ)

2 Severe odour Oil in the CRWS No odour nuisance sensed by the Complying nuisance and VOC tank and other committee members. VOC was levels inside unit operational area pits measured using handheld PID premises was have been processed analyser and value was 0ppm.

      varying               from    and                     being
      4.0ppm to 6.0ppm maintained regularly
      when           measured within limits so that
      using handheld PID            VOC      and            odour
      (photo                ionic nuisance             is     not
      detector) analyzer            available          in      the
                                    premises anymore.
3     During        the     visit, Unit      claims           that Since there was no rains, there          Partially
      there were rains and          MEG barrels were                 was no water logging. Unit has         complying
      water logging was             placed       near          the not taken any measures for the
      observed in the area. referred                        lagoon cleanup of the area. Black oily
      Both Effluent mixed having an area of                          sludge is still present in the area.
      with     storm        water   1.25 acres (not 10               Top layer of soil is not fully
      was present in the            Acres)                  during removed and only in certain
      unlined       lagoon     in construction                       areas     top 10cm of soil        is
      more than 10acres of activities.                               removed however bund is not
      land between M/s Unintended                             and constructed.               Committee
      GAIL       and         M/s inadvertent leakage collected three sediment samples
      ONGC           terminals. of one of the barrel at different at various points
      The      pH      of     the of MEG in the area where                     ONGC      pipelines   are
      lagoon water           was might have resulted                 passing    and   from     sediment
      around 5                      into low pH value in analysis results, it implies that
                                    the    sample.            The the it contains total petroleum
                                    same         has         been hydrocarbons in the range of 297
                                    rectified.                       mg/kg to 421 mg/Kg. No other

Top layer of soil has heavy metals is present. The been recovered and summary of the results is as Page 26 of 39 27 Inspection Report in the matter of OA 175/2020 (SZ) shall be processed follows:

                                   for                   bio
                                   remediation/Transfer
                                   to TSDF for landfill
                                   depending            upon
                                   sample analysis.
                                   After removal of the
                                   top layer of soil, the
                                   area will be properly
                                   protected with bund
                                   and rain water shall
                                   be stored in          the
                                   pond.
                                   Unit      claims       as
                                   Complying

Table 8: Odalarevu Sediment sample analysis results Location Total Benzo(a) Iron Mercury Benzene Phenols TPH Lead (mg/kg) pyrene (mg/kg) (mg/kg) (mg/kg) (mg/kg) mg/Kg (µg/kg Beside security gate BLQ BLQ BLQ BLQ BLQ at vashishta gate- 693.54 1441.86 (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1) odaleruvu (soil) Area between GAIL BLQ BLQ BLQ BLQ BLQ and ONGC-odalerevu 297.17 31.35 (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1) (soil) Lagoon Area between BLQ BLQ BLQ BLQ BLQ GAIL and ONGC- 335.57 153.73 (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1) odalerevu (soil) lagoon between GAIL and ONGC BLQ BLQ BLQ BLQ 421.74 846.43 2.28 near watch tower- (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1) odalarevu (soil) ETP beside settling BLQ BLQ BLQ BLQ BLQ 10019.79 1553.94 tank -odalarevu (soil) (LOQ:2.0) (LOQ:2.0) (LOQ:20) (LOQ:20) (LOQ:0.1) Page 27 of 39 28 Inspection Report in the matter of OA 175/2020 (SZ) Analysis results indicate the presence of TPH in the range of 297 mg/Kg to 10019 mg/Kg. Unit has to take measures to prevent oil spillages/ leakages and to clean the existing spills.

4 The storm water The storm water Storm water drains are cleaned Complying drains are drains are being and reported that the oily sludge completely clogged cleaned periodically and silt removed from drains was and was filled with in phase wise transferred to sludge tank but thick oily sludge. manner to remove however the records on how the vegetation. much quantity of sludge was removed from drains is not made available to committee. Drains were dry and no effluent was transferred through drains.

5 CFO validity Unit has applied for consent and renewal is awaited. Consent fees is paid.

VI.a Environmental compensation to be levied from Odalarevu GCS EC for EC=PI x N x R x S x LF violation Where, EC = Environmental Compensation in INR PI = Pollution Index of industrial sector (red-80) N = Number of days of violation took place (from the date of violation observed to date of compliance- 379 days committee had calculated compensation till 25.02.2021 and committee re- inspected during 08-03-2022 to 11-03-2022 and observed following non- compliances  treated effluent not complying with ED well disposal limits  oily sludge is laying beside settling tank in the ETP area R = A factor in Rupees for EC (Rs. 250/-) S = Factor for scale of operation (large-1.5) Page 28 of 39 29 Inspection Report in the matter of OA 175/2020 (SZ) LF = Location factor 1 =80*379*250*1.5*1 =Rs. 1,13,70,000 Rupees One Crore thirteen lacs seventy thousand only Considering unit has made improvements and unit is complying with effluent discharge standards committee has not assessed repeated violation factor VII Compliance verification of Gopavaram GGS Sl. Non-compliances Compliance status Current status of compliance Remarks No observed by submitted by the as verified by the committee committee during unit and first visit Upgradations/ Modifications made by the unit 1 Unit is generating Unit is in the process As per the CFO issued by Not 1800 KLD of of upgrading ETP APPCB, quantity of effluent is 6 Complying effluent but the and augmenting the KLD but actual effluent capacity of ETP is capacity. generation varies from 1500 600 KL Unit claims as work KLD to 1800 KLD. ETP is under progress having capacity to treat 600 KLD of effluent and both treated & untreated effluent is discharged into ED (effluent disposal) wells. Committee collected samples from inlet (producer water) and outlet of ETP, storm water drain at north-

east corner and from unlined lagoon. From the analysis results it is found that effluent is getting Page 29 of 39 30 Inspection Report in the matter of OA 175/2020 (SZ) mixed with storm water.

Untreated Effluent is discharged into ED wells. Storm water drains are filled with oily sludge.

Oil contaminated wastewater is stored in unlined lagoon in the premises. Land in the premises is observed to be contaminated at several places indicating discharge of untreated oil bearing effluents on open land.

Hazardous waste is stocked in a concrete tank without disposal since commission of the premises. Treated effluent is complying with discharge limits.

Copy of CFO is enclosed as Annexure-IX Table 9: Gopavaram raw and treated effluent analysis results Oil and Grease TPH Location pH TSS (mg/L) (mg/L) (mg/L) ETP Inlet - Gopavaram 7.58 29 BDL(DL:4.0) NA ETP Outlet- Gopavaram 7.66 11 BDL(DL:4.0) NA Storm water drain North east corner- 731.78 8.07 6 BDL(DL:4.0) Gopavaram Storm water collected from unlined 185.53 7.50 71 BDL(DL:4.0) lagoons in Gopavaram Page 30 of 39 31 Inspection Report in the matter of OA 175/2020 (SZ) Photo 18: Effluent treatment area Photo 19: effluent stagnation Page 31 of 39 32 Inspection Report in the matter of OA 175/2020 (SZ) Photo 20: oily sludge dumped on the ground VII.a Environmental compensation to be levied from Gopavaram GGS EC for EC=PI x N x R x S x LF violation Where, EC = Environmental Compensation in INR PI = Pollution Index of industrial sector (red-80) N = Number of days of violation took place (from the date of violation observed to date of compliance- 379 days committee had calculated compensation till 25.02.2021 and committee re- inspected during 08-03-2022 to 11-03-2022 and observed following non- compliances oily sludge is laying beside settling tank in the ETP area untreated effluent is discharged through storm water drains Sediment contains high concentration of sludge indicating dumping of oily sludge R = A factor in Rupees for EC (Rs. 250/-) S = Factor for scale of operation (large-1.5) LF = Location factor 1 =80*379*250*1.5*1 =Rs. 1,13,70,000 Rupees One Crore thirteen lacs seventy thousand only Page 32 of 39 33 Inspection Report in the matter of OA 175/2020 (SZ) VIII Utilization of CSR funds by M/s ONGC in Rajahmundry and Kakinada assets ONGC has devised framework for utilization of CSR funds. Though the installations at Kakinada asset and Rajahmundry asset are currently operating under loss but however the overall profit made by M/s ONGC nationwide is considered for CSR fund utilization. Reported that 5% of theoverall profit made by M/s ONGC is utilized for CSR activities and the total profit is dividedamong all installations. Based on the CSR proposals received by various modes such as through District Collector, NGO's, Public representatives etc are compiled and approval is obtained through their key executive/ corporate head. Kakinada asset & Rajahmundry asset prepare a CSRplan based on the proposals received and on the allocated amount to each installation. Both Rajahmundry and Kakinada asset are having a CSR co-ordinator for implementation of CSR activities.

The CSR proposals received from various domain are first examined by the CSR co-ordinator by way of field visit or verifying the DPR etc and after examining the proposals it is put up to an internal screening committee and then to virtual corporate committee. These committee further examine and recommend the activities after which approval is obtained. Based on the proposal received CSR activity is implemented and then it is monitored by either CSR co-ordinator or project monitoring team. Post implementation & monitoring, documents are obtained such as utilization certificates etc and activity is completed.

For ground trothing purposes, committee verified the CSR records for last five years (2017 onwards) and also visited areas where activities are implemented such as installation of water tanks, providing cycle stand for school children etc. Committee interacted school Principle, Tehsildar and it was reported that CSR activities are taken up the units.

Four village heads met the committee and requested the committee to direct M/s ONGC to release more amount to the villages where the wells are located rather than spending the amount in diverse manner and in other villages. Committee clarified the Village heads that committee is verifying as to whether CSR funds are properly utilised or not. M/s ONGC Rajahmundry asset has spent around Rs. 21.04 crores on CSR activities during 2018-19, Rs. 23.05 crores during Page 33 of 39 34 Inspection Report in the matter of OA 175/2020 (SZ) 2019-20 and Rs. 8.08 crores during 2020-21 respectively. Reported that during 2020-21, M/s ONGC has contributed to PM cares fund and hence hence there is a decline in amount spent on CSR activity in the region.

The committee interacted with the applicant and objections were raised on installation of two Water ATM's in Antharvedi Devasthanam and nearby village. Committee visited both the water ATM's and discussed with the M/s ONGC team. Based on the proposals received, M/s ONGC has proposed to two install water ATM's. Water ATM's are water treatment machines (basically RO system) which either draw surface or ground water treat the water and clean water is provided through tap. Each villager was given a card and on inserting the card, each villager gets around 20 liters of water per day. M/s ONGC has implemented the project on the condition that M/s ONGC will only bear the capital expenditure (only the cost of water ATM machine) and one year AMC and subsequently the village has to maintain the water ATM. The land required for installing ATM was identified by the villagers, electricity was provided by village/ temple authorities. After lapse of one year the expenditure towards O &M cost/ AMC cost of the water ATM had to borne by the village. Reported that water ATM installed at Antharvedi Devasthanam was operational for one year and afterwards no one has taken responsibility and currently it is not operational. While the water ATM in the village is not put to use. During committee visit, both the water ATM's were not in operation.

The process flow followed by M/s ONGC for CSR is given in the below image. Further two case studies are given as Annexure-X. Page 34 of 39 35 Inspection Report in the matter of OA 175/2020 (SZ) Image: Process flow followed for CSR projects at ONGC Page 35 of 39 36 Inspection Report in the matter of OA 175/2020 (SZ) Image: CSR abstract of Rajahmundry asset from 2018- 2021 IX Conclusions and Recommendations Hon'ble NGT vide order dated 19.01.2022 directed the committee to inspect the units and verify the compliance status of the units. Committee observed that as compared to previous visit, there are improvements but units are yet to achieve compliance and few serious & significant violations were observed by the committee.

Page 36 of 39 37

Inspection Report in the matter of OA 175/2020 (SZ) i. Currently, Tatipaka GCS is operating the ETP and unit is testing the quality of treated effluent as to whether it is meeting the discharge standards or not and after ensuring that unit complies with discharge limits, treated effluent is discharged through ED wells. Unit has maintained records on the quantity of effluent generated, characteristics of effluent at inlet & outlet of ETP and quantity of effluent disposed through ED well. However unit has not taken adequate measures in handling the oily sludge, slop oil and washings. Spillages or oil deposition near the ETP area is not fully cleaned. Effluent oily sludge stored in the old ETP shall be treated and old ETP shall be dismantled. Sludge stored in the sludge tank shall be disposed. Unit shall ensure that it will comply with Hazardous Waste Management Rules, 2016 and dispose the hazardous waste within 90 days fromthe date of generation.

ii. Kesanapalli ETP is handling around 1800 KLD of effluent against the consented quantity of 600 KLD and is having two ETP's. Old ETP was not properly operated however treated effluent is meeting the discharge limits for ED well disposal. New ETP is handling 1500 KLD of effluent and treated effluent is disposed in the sea with existing marine outfall pipeline of 60m against consent condition of ED well disposal. Outside the unit premises water stagnation was observed and TPH (Total Petroleum Hydrcarbons) is around 971.17 mg/L which indicates that effluent may be leaking/ discharged outside the unit premises or runoff from old ETP area has stagnated outside the unit premises. Sediment samples collected around old ETP contains TPH of 319mg/Kg indicating mixing of spillages on the ground. Unit shall ensure that ETP is properly operated, effluent is disposed as the per conditions stipulated in CFO and ensure that no effluent is discharged outside the unit premises. Sludge shall be properly managed and prevent the spillages. Kesanapalli GGS shall immediately stop disposal of treated effluent by marine outfall near the coast and dispose the treated effluent as per the conditions stipulated in CFO issued by APPCB iii. Laying of new pipe line in CRZ area by Kesanapalli GGS does not have prior CRZ clearance from Ministry and Consent approvals from APPCB. Kesanapalli GGS shall Page 37 of 39 immediately approach concerned authorities for obtain prior permissions for the new pipeline.

iv. Effluent generation is around 1800 KLD and ETP at Gopavaram is having capacity to handle 600 KLD of effluent. Hence untreated effluent is discharged outside the unit premises. Water present in the storm water drain and in unlined lagoon contained TPH of 731.78 mg/L and 185.53 mg/L indicating the presence crude oil/ effluent in the sample. Sediment samples collected from Gopavaram GGS contains high concentration of TPH in the range of 644.07 mg/Kg to 30,698 mg/Kg which indicates that oily sludge is dumped on the ground. Since unit is not having ETP of adequate capacity, untreated effluent is discharged through ED wells. Unit shall take measures to augment the treatment capacity and ensure that only treated effluent is discharged through ED wells. Till the ETP capacity is enhanced, unit shall restrict its production so that quantity of effluent generation is proportionate with ETP capacity.

v. Whenever any oil spills/ leakages takes place within the unit premises or whenever sludge is carried with runoff, unit is covering it with fresh soil and not taking measures to clean up. Units shall ensure that during any untoward incidences of oil spill/ leakages, unit shall take measures to remove the entire quantity of spills/ leaks and scrap the underlying soil and store it in sludge tank and dispose the same along with oily sludge.

vi. During rains, the first flush of rains is likely to carry the pollutants into adjacent area and it is essential for the industry to have facility to lift the first flush of rain water and treat the same in effluent treatment plant.

vii. During previous committee visit it was observed that thick oily sludge was present in the storm water drains. Currently all the units have cleaned the drains and they were in dry condition. Units have also devised plan for periodical cleaning of drains. However units have not maintained records on the quantity of sludge removed from drains and 38 mode of disposal of the silt/ sludge. Unit will take measures to install oil catchers in the drains located near process area & ETP. Based on the characteristics of the silt/ sludge present in the drains, units will safely dispose the same.

viii. There was no odour nuisance during this visit and ambient air quality in the installations and in the villages is meeting the National Ambient Air Quality Standards. Committee observed huge flames from flare stack at Tatipaka GCS. Units have not maintained proper records on the volume of the gas handled in the flare stack. It was reported that unit has already proposed to install new flare stack at Tatipaka and Kesanapalli. Unit may submit time bound action plan for replacement of flare stacks.

ix. The unit has obtained consent from APPCB during 2015 and subsequently the consent is renewed (online consent monitoring and management system) but however post 2015 due to ageing of wells the quantity of produce water is increasing and there by the quantity of effluent generated is also increased. The actual quantity of effluent generated is higher than the quantities stipulated in the CFO. All the stacks installed in the installations are not covered under the purview of the Consent order. For instance stack installed at TEG unit is not included in the consent order. M/s ONGC shall ensure that every installation obtains Consent For Operation from APPCB under the Water Act, 1974 and Air Act, 1981 for the actual quantity of products manufactured, actual quantity of wastewater received and include all the stacks installed in the unit.

x. Committee observed that M/s ONGC are utilizing the CSR funds for environmental & social development activities and other essential activities identified by the District Magistrate/ Corporate Head office/ Public representatives/ registered NGO's.

39

xi. The units shall pay Environmental compensation to CPCB as follows:

Name of the EC amount assessed EC amount assessed Total EC amount in installation during first visit of during second visit INR to be paid to the committee CPCB Tatipaka GCS Rs. 7,28,62,500/- Rs. 1,13,70,000/- Rs. 8,42,32,500/- Kesanapalli GGS Rs. 4,11,00,000/- Rs.2,27,40,000/- Rs.6,38,40,000/- Odalarevu GCS Rs. 5,68,50,000/- Rs. 1,13,70,000/- Rs.6,82,20,000/- Gopavaram GGS - Rs. 1,13,70,000/- Rs. 1,13,70,000/- Total Environmental Compensation to be paid by M/s ONGC to CPCB 22,76,62,500/-
is Rs. Twenty Two crores Seventy Six lacs Sixty Two Thousand and Five hundred only xii. The units shall implement the corrective actions, shall submit time bound action plan for disposal of sludge. Unit shall ensure that hazardous waste are disposed within 90 days from date of generation as per the conditions stipulated in the Hazardous Waste Authorization. Unit shall submit time bound action plan for removal of oily sludge deposited in the soil at Gopavaram, Kesanapalli and at Tatipaka. APPCB shall monitor that the oily sludge is disposed as per action plan.
Scientist-D, Ministry of Environment Forest andClimate Change, Regional Office, Dr.Vijayawada Suresh B Pasupuleti 40 P. Ravindranath Senior Environmental Engineer Andhra Pradesh Pollution Control BoardZonal Office, Visakhapatnam Prof. M. Deepa Dept of Chemical Engineering, A.U College of Engineering (A) Andhra University, Visakhapatnam Mahima TScientist-D Central Pollution Control BoardRegional Directorate, Chennai 41 42 43 44 45