Section 196(3) in The Coal Mines Regulations, 2017
(3)In the case of an opencast working, where any permanent building or structure of permanent nature not belonging to the owner lies within the danger zone, the aggregate maximum charge per delay and per round shall not exceed the amount fixed by the Chief Inspector, by a permission in writing granted on the basis of a scientific study, and subject to such other conditions as he may specify therein.