Union of India - Section

Section 10 in Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019

10. Application for Grant of Connectivity.

(1)A Participating Entity located in neighbouring country and getting connected to the Indian grid through dedicated transmission systems for cross border trade of electricity within or across India shall be required to apply for Connectivity to the Indian grid.
(2)The Participating Entity as specified under Clause (1) above shall make an application to CTU for the grant of Connectivity to the Indian grid. In addition to the requirements specified under Connectivity Regulations, the Applicant shall furnish the following:
(a)Approval from Designated Authority with regard to eligibility of the Participating Entity for cross border trade of electricity or copy of the Inter Government Agreement (IGA) wherever available; and
(b)Necessary Approvals for implementing the dedicated transmission system.
(3)On receipt of the application, the CTU shall process the application and grant Connectivity as per the Detailed Procedure made under Connectivity Regulations. CTU may consult and coordinate with Transmission Planning Agency(ies)of neighbouring countries while processing the application and carry out the necessary inter-connection study as specified in the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007.
(4)Upon grant of Connectivity, the Applicant shall sign a Connection Agreement with the CTU.Provided that in case Connectivity is granted to the inter-State transmission system of an inter-State transmission licensee other than the CTU, an agreement as provided in the Central Electricity Authority (Technical Standards for Connectivity to the Grid), Regulations, 2007 shall be signed between the Applicant, CTU and such inter-State transmission licensee.
(5)Grant of Connectivity shall not entitle an applicant to interchange any power with the Indian grid unless it obtains long-term access or medium-term open access or short-term open access for cross border trade of electricity.
(6)A Participating Entity located in the neighbouring country and getting connected to the Indian grid through Cross Border Transmission Link shall not be required to apply for Connectivity to the Indian grid.