Section 2(1)(c) in The Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011

(c)"Allotted Transmission Capacity" means and include the power transfer in MW between the specified point(s) of injection and point(s) of drawal allowed to a long-term customer on the intra-state transmission system under the normal circumstances and the expression "allotment of capacity" shall be construed accordingly;