Section 41(1)(d) in The Bangalore Metro Railway (Opening of Public Carriage for Passengers) Rules, 2011
(d)after final measuring of the whole installation and check on the satisfactory operation of all equipments including protective relays, the traction sub-stations and other installations may be energized.