Section 5(3)(b) in Rajasthan Electricity Regulatory Commission (tariff for Captive Power Plants) Regulations, 2007
(b)The variation in contracted capacity to be declared as day ahead schedule shall not exceed ± 20% of contracted capacity. The load factor of power supply for the settlement period determined on contracted capacity shall not be less than 70%.